Loading...
15B-005 603 SPRING ST BP-2020-0634 GIS#: COMMONWEALTH OF MASSACHUSETTS Mo-.Block: 15B-005 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: window replaced BUILDING PERMIT, Permit# BP-2020-0634 Project# JS-2020-001074 Est.Cost:$5000.00 Fee: $40.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor., License: Use Group: C & T CONSTRUCTION 062884 Lot Size(sq.ft.): 40075.20 Owner: KELLOGG CHRISTOPHER Zoning: URA(100) Applicant: C & T CONSTRUCTION AT. 603 SPRING ST Applicant Address: Phone: Insurance: 15 Fairway Drive (413) 586-4965 FLORENCEMA01062 ISSUED ON.11/15/2019 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL 15 REPLACEMENT WINDOWS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rouf-h F ramc: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 11/15/2019 0:00:00 $40.00 212 Main Street, Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner x glw 4 parfr eht use on(y �l" �'k u rN ,.�-..City of Northa pto of Pit Building Dep rtme Ctrrla ut/Drewaya 212 Main reet � 201 ewe/Sept Avaifabilrty i` Room 100 at /Vlfelf vailabflif n, Northampton, A , er Two efs n 54ructural Plans phone 413-587-1240 rax41 ' 1' ,inr`PF to PI ns �{W. _ �r�Q nT , J�k Eur APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: -hit:section to be completed b:y office �a Lot o- � � Unit � Overla.y..: ict Elm St District. District r: --- _ SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Na nt) Current Mailing Addre /QG- Telephone S nat 2.2 Authorized A ent: / Nam ri Current Mailing Address/ Sig ture Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building ` (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) J Check Number This Section For Official Use Only Building Permit Number: �C` d IIsssued: Signature: f l� Building Commissioner/Inspector of Buildings Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage -- — I_� r--� Setbacks Front �----� Side L:€._! R:= L:�_..__1 R:l Rear Building Height �� --- Bldg.Square Footage % L—�-- Open Space Footage (Lot area minus bldg&paved _; parking) _ #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DONT KNOW Q YES O J___IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? DONT KNOW 0 YES Q IF YES: enter Book Pagel— and/or Document# ..._.,.,�._____.�..,�... Q B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW O YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained Q , Date Issued: C. Do any signs exist on the property? YES Q NO Q IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO Q I IF YES, describe size, type and location: ; E. Will the construction activity disturb(clearing, grading' exexcavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. _ SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) 0 Roofing ❑ Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [M Siding[O] Other[O] Brief Description of Proposed �/ 1 / Work: p p ITO S G� �� `�" y /'7?�/ CLLL29i�i'�7 L;?L)4c-�s Alteration of existing bedroom Yes L No Adding new bedroom Yes L-- No Attached Narrative Renovating unfinished basement -Yes Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT as Owner of the subject property a hereby authorize to act on my behalf 1 ratters relative to work au hori ed s building permit application. Signature of Over - Date 3 72cj I, as Owner/Authorized Agent h eby declare that:the state ens and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name or Signatu of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ , Name of License Holder: / � /G�� l M License Number �i✓ Cllr '�. /C� /?_C Z( ✓ ddreks � Exp—ira n Date nature T ephone 9-Registered Home Improvement Coritractort _ „"'`:; �.� .; Not Applicable £ 0107 . Company Name­ S Registration Number YS AddressExpiration Date qtr 3z Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11. - Home Owner Ege"mption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under theresponsible for all such work under the buildin2permit. As acting Construction Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. > The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street ' . Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): t G S Address: City/State/Zip: �f� ,eAze'�� Phone#: Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 6. F1 New construction employees(full and/or part-time).* have hired the sub-contractors 2.V am a soleproprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.]t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp: insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. Iam an employer that is providing workers'compensation insurance for my employees. Below is the policy andjob site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiation Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cerdfyiunder the pains and penalties ofperjury that the information provided above is true and correct Date: Signature: Phone# 7l 3 �f Q Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton ' f VSj1l Massachusetts DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building Northampton, MA 01060 tyy y7ti INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s) who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill) sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made 1, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location r - ' City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: i�,- 67-3 The debris will be transported by: The debris will be received by: 116,7110 Building permit number: Name of Permit Applicant �s v Date Signature of Permit Applicant