Loading...
16A-020 (26) 506 FAIRWAY VLG BP-2020-0358 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 16A-020 CITY OF NORTHAMPTON Lot: -000 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2020-0358 Project# JS-2020-000589 Est. Cost: $31868.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: VALLEY SOLAR LLC 077279 Lot Size(sq. ft.): Owner: BRIGGS SARAH Zoning: URA(102)/WP(17)/WSP(15)/ Applicant: VALLEY SOLAR LLC AT. 506 FAIRWAY VLG Applicant Address: Phone: Insurance: PO BOX 60627 (413) 584-8844 WC FLORENCEMA01062 ISSUED ON.9/19/2019 0:00:00 TO PERFORM THE FOLLOWING WORK.ROOF MOUNTED SOLAR, 27 PANELS 9.045 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 9/19/2019 0:00:00 $75.00 212 Main Street,Phone(413) 587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner '30 L/f/— Department use only , resrir City of Northampton Status of Permit: ,. Building Department Curb CuUDriveway Permit 212 Main Street Sewer/Septic Availability Room 100 WaterfWell AvailabilityAC+° Northampton, MA 01060 Two Sets of Structural Plans 0 lop-�'* phone 413-587-1240 Fax 413-587-1 R ` �hrE&j APPLICATION TO CONSTRUCT,ALTER,REPAIR,REN VAT OR DEMOLISH A ONE O TW FAMILY DWELLING SEP 1 7 2019y� SECTION 1 -SITE INFORMATION I I I a °v eco pleted by office 1.1 Property Address: DEPT OF BUILDING INSPECTIONS NORTHAMPTON,MA 01 6 Unit 506 Fairway Village, Leeds, MA 01053 Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: Sarah Briggs and Scott Cornelius 506 Fairway Village Leeds, MA 01053 Name(Print) Current Mailing Address: 413-522-5066 Telephone Signature 2.2 Authorized Aaent: Valley Solar LLC PO Box 60627, Florence, MA 01062 Name(Pr' Current Mailing Address i Y 413-584-8844 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) O 5.Fire Protection 6. Total=(1 +2+3+4+5) $ 31,868.00 Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building CommissionerlInspector of Buildings Date Ihasbrouck @ northamptonma.gov info(G�valleysolar.solar EMAIL ADDRESS (REQUIRED; CONTRACTOR) Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by'Zoning This column to be tilled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage Open Space Footage 0r0 (Lot area minus hIdg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK Icheck all aoolicablel New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [❑] Decks [C] Siding[❑] Other[X Solar Brief Description of Proposed Work: Installation of 27 Panel solar roof mount array. System size 9.045 kW DC. Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa.If New house and or addition to existin4 housing, complete the followinci: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft,of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Sarah Briggs and Scott Cornelius as Owner of the subject property hereby authorize Valley Solar LLC to act on my behalf, in all matters r lative to work authorized by this building permit application. Signature of er Dat Valley Solar LLC as Gwaw/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. ,776V'ev s/L vE->2 1-A1, 11) Print Name Signature of r Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder License Number Steven Silverman CS-077279 Address Expiration Date 268 Fomer Road South am ton MA 01073 6/21/2020 Aff Signature elephone 413-584-8844 9. Registered Home Improvement Contractor: Not Applicable ❑ Company Name Registration Number Valley Solar LLC 186338 Address Expiration Date PO Box 60627, Florence, MA 01062 Telephone 413-584-8844 10/27/20 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes.......V No...... ❑ The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print LegiblN Name(Business'Organization/individual): Valley Solar LLC _ Address: 340 Riverside Drive PO BOX 60627 City/State/Zip: Florence, MA 01062 Phone #: 413-584-8844 Are you an employer?Check the appropriate box: Type of project (required): 1.® I am a employer with 11 4. ❑ I am a general contractor and 1 6. ❑ New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. ❑ Demolition working for me in any capacity. employees and have workers' 9 ❑ Building addition [No workers' comp. insurance comp. insurance.' required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their I I.[] Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] + c. 152. §1(4). and we have no employees. [No workers' 13.® Other Solar comp. insurance required.] *Am applicant that checks box#1 must also till out the section below showing their workers-compensation policy inftwination. +Homeowners who submit this atTttdavit indicating they are doing all work and then hire outside contractors must submit a new atlidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees.they must pttwide their workers'comp.policynumber. I ant an employer that is providing workers'compensation insurance for my enrplt!yees. Below is the pollen and job site information. Insurance Company Name: Liberty Mutual Policv#or Self-ins. Lic.#:WC531 S620647019 Expiration Date: 2/1/2020 Job Site Address: r Q City/State/Zip: 1 , m e�ra53 Attach a copy of the workers' compensation policy decla ation page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL,c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment.as well as civil penalties in the form of a STOP WORK ORDER and a tine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under rs and peva es of perje a information provided above is true and correct. Si nature: /� Date Phone#: 413-584-8844 Official use only. Do not write in this area, to be completed h►'cite•or town o�c•iaz City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical inspector S.Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton X >� Massachusetts DEPARTMWT OF BUILDING INSPECTIONS 212 Main Street *Municipal Building -. ^ Northampton, MA 01060 Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: , �&.) foitivakA Vluu�p Leeds, c� 3 (Please print house number and street name) Is to be disposed of at: Valley Recycling. (235 Easthampton Rd, MA 01060) (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: Valley Solar. (POB 60627, MA 01062) (Company Name and Address) 4�42 gi419 Signature of Permit Applicant or Owner Date If, for any reason, the debris will not be disposed of as indicated. the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. OPennFUSION 1 52 S. Broad E n g I n e e it I n g Lansdale, 6 1944466 (215)361-8040 September 5, 2019 Valley Solar 340 Riverside Dr Northampton, MA 01062 RE: Briggs Residence 506 Fairway VLG, Leeds, MA 01053 Client Project#: 506BRIG PFE Project#: 193998 On behalf of Valley Solar, Penn Fusion Engineering LLC (PFE) performed a structural analysis of the roof at the above referenced location.The purpose of our analysis was to determine if the existing roof system is structurally sufficient to support the new photovoltaic moudles in addition to the code required design loads. Our analysis is based on the information provided by Valley Solar and is isolated only to the areas where the modules are intended to be placed. System Specifications: Total System Size: 9.45 kW/DC Panel Specs: (27) LG Solar- LG350Q1 C-A5 Inverter Specs: (27)Enphase- IQ7+ Racking System: SnapNRack-Series 100 UL The modules are to be located on the following roof plane: Mounting Rafter Rafter Horizontal Collar Collar Tie Shingle Number of Ceiling Plane Size Spacing Span Ties Spacing Sheathing Type Shingle Layers Profile 1 Truss 24" 24ft. Oin. N/A 0" CDX 1/2" Asphalt 1 Flat Shingles The roof design has been analyzed in accordance with the 2015 International Residential Code and Massachusettes Amendments 9th Edition with design loads as follows: Ground Snow(Pg): 40 psf Wind Speed (V): 1 1 7 mph Mounting Plane 1 It has been determined by this office that the roof, as specified above, is adequate to support the new PV modules in addition to the code required design loading. Attach the module rail brackets to the roof with 5/16"lag bolts at 48 on center maximum with staggered penetration such that load is distributed evenly among roof members. Provide a minimum of 2" of penetration into the wood members. This office has determined that the installation of the PV System as specified above will meet the structural requirements of the 2015 International Residential Code with Massachusettes Amendments 9th Edition and ASCE7-10 when installed in accordance with the manufacture's instructions. If you have any questions regarding this analysis, please feel free to contact us. tN Or Lfp3S9C' Best Regards, y Penn Fusion Engineering LLC o ANDREW DOVEN C f, J LEONE NO 53Cdx_---- Andrew D. Leone, P.E. ; ° ':.3, �tc�3 Principal `SS IS TE ��S� (NvA►. E MOD 1 1 O MOD MOD MOD . MICRO Utility Into: Conductor/OCPD Calculations: q INVERTERS Utility Company:National Grid NEC 210.19(A)(1)(a))Inverter IQ7 Max a IN BRANCH CIRCUIT Utility Acct#:65768-94012 Output=1.21A x 27=32.67A x 1.25= � '..X Meter Number:87679978 40.8375A s AC 3/ AC AC AC Customer:Scott Cornelius DC DC DC DC g 5 3 (1)0BEf C�HN (2)#12a CaT N Z #6iCU2BARE a RX Isolation Device 1 SMART Meter q 11 12 m a € between Company MOD 6 Moo MoD Moo meter and DER AC Isolation Device', AC Isolation DeviceF-T3 U)� s deox M MICRO Y .E w x INVERTERS U•m o clRCurr 1 V5# 6 5 6- 1 8 10 �, N 0 rn Ac_ Ac Ac Ac Box 4 2 3 5 4 wUDC �� AC Disco CB Disco kWh �W MOD MOD MOD aMICRO -, N? (3)12/2 RX 6/3 SER INVERTERS Ns cu BARE AC Combiner gggg IN 3W EMT IN BRANCH � l«w. 613 SER CIRCUIT LINE on the top and the LOAD on the Communications: PRaaucraN�n _ bottom side of the MA SMART Meter 0 DC DC DC DC - J �€ Wifi to Envoy - U ga � g H € O Labeling Schedule W € Eguioment Schedule Inverter Trio Settings: gg W P 1.PV ARRAY Ultra-Rail Snap N Rack Roof Mount System Inverter TRIP settings are set in the Inverter per the ISO NE SRD and ESB 758 1.CAUTION[AC VOLTAGE LLI ( ) Y section 7.6.11. 2.WARNING!PHOTOVOLTAIC POWER SOURCE 2.SOLAR PV MODULE(LG350QlC-A5)27x panels.Max DEVICE DEFAULT DEFAULT Pickups and 3.SOLAR PV AC COMBINER BOX i s` g output 42.7V/10.77A PICKUP SETfINO CLEARING TME ciaaring Times 4.UTILITY GENERATION METER o` rg 3.DC/AC MICROINVERTERI07PLUS-72-2-US 27x (simplified defaults (seconds) Adhere to ( ) from section Raqulred 5.PV SYSTEM AC DISCONNECT Rated AC Output s ` Enphase IQ7+.Max output 290VA/1.21A 7 811) WhaUs(yam Current:32.67AAC Nominal Operating Voltage:240V AC g 4.J-BOX(SD-0786-41)Flashed SoladeckAC/DC Rated No): 6.RAPID SHUTDOWN SHUTDOWN SWITCH FOR A Combiner Box.1 per roof under Frequency ses NE 0.16 res SOLAR SYSTEM(reflective) g 5.AC COMBINER(X-IQ-AMI-240-3)3x 20A Breaker/branch. (e1u) 7.WARNING!ELECTRICAL SHOCK HAZARD u x S lx 10A breaker for IQ Envoy Gateway with production RGM Under Frequency 58.5 Hz 300 Yes TERMINALS ON BOTH LINE AND LOAD SIDES MAY 1 91 6.MA SMART GENERATION METER(utility owned)Socket (81U) BE ENERGIZED IN THE OPEN POSITION 2 Oa F installed for Utility's SMART Generation meter over Frequency 812 Hz 300 Yes 8.WARNING BUSBAR IS ENERGIZED FROM 2 a 7.AC DISCONNECT(DG222URB)60A 240VAC(adjacent to (810) SOURCES UTILITY GRID AND PHOTOVOLTAIC utility meter) over Frequency 82.0 Hz 0.16 Yes > 8.AC DISCONNECT BR24L70SP ;a 2 space load center.45A (810) SYSTEM F CBsystem OCPD ( ) Undervoltage(27) 50%of Nominal 1.1 yes 9•WARNING!INVERTER OUTPUT CONNECTION DO W €-a em NOT RELOCATE THIS OVERCURRENT DEVICE 9.SERVICE PANEL 200A MAIN,200A BUS Under Voltage(27) 86%of Nominal 2 Yes 10.SOLAR PV 0 a 10.UTILITY METER 120/240V,1 PH,3W Over Voltage(59) 110%of Nominal 2 Ya y () 11.WARNING!UTILITY METER ENERGIZED BY 2 Over Voltage(59) 120%of Nominal 0.18 Yq rr SOURCES � £ 12.UTILITY SERVICE METER a� THIS ELECTRICAL DRAWING IS A PROPOSED DESIGN.THE ELECTRICIAN IS AT LIBERTY TO ADJUST DURING THE BUILD AND AMENDMENTS VALL BE REFLECTED IN THE AS.BUILT DIAGRAM. tni,p'•n i•fM PmpMrry work Pmevc!of VMhy roma hnpovanwrt.Inc.rvnl).rt la ewa.rw ror ero Mntltei•ne exduaM Potion a/auppaMip e:•cwrbM GN a/VHI.ane tusrorrrer preea mx Ma N•nMMa dMlsp'•n,AM riot E•npudl.MeO arprea•rNee m•ny roan ror Ma Purport o/•naGMn9 or nppomnp IM wvM aJmmP•rkW Pml•tl ronlrwclaa m'tlrovf tlra pwrNeron d,eM mmpnsetlonP^M m.Ynl. Er i g � M4 J 0 s y. •a fX � v O pA ■ A o N Al D m � 3o a zNN < (� � ➢ ➢ n � = ➢vv -- fi, v, F ➢ m y z w mZ � _ < n0 p p 0 yo O m m m C m H C m p mnm m nw m ppD O k A Zm to -� r A A m m Z0 r v D Z 3 x D N L41 m Z fl < A O Z R Z ^ y E Z rl A { < art m Utility Client: Scott Cornelius,506 Fairway VLG,Leeds MA 01053 Valley Valle Solar LLC 1 340 Riverside Drive SITE NAME Scott COMOUS&Sarah Briggs SCALE SEE VIEW SHEET NUMBER � y PO Box 606271 Northampton SITE PLAN SITE ADDRESS 506 Fama VL DATE.r�p ar w .Valle01062 tySolar.Solar SYSTEM SIZE 9.045kWDC 7.83kWAC DRAWN:IA EIEC.NE Wm , ince plan n M.propn.hry—k p—ct of VLroy Mom.Improvwrrenf.Inc(VWI).it re dw'lv.r.d br Me Nnmed arra"ft" d ,Wr*q dw avrb Y b7 of VW/aw cuabmw Wr 8W ow NMNnd dMY plm MM/KK W npubffsW ormn ftd k?my form br M. of &,q or wppo ,M.won of carry.naadon paid b.VMI. 1 1 •s�"_1 lid —r� A�� u q ryf \ N 0 0 C D Q X ValleValley Solar LLC 340 Riverside Drive SFE NAME Scott Cornelius&Sarah Briggs sau :�� SWEET NUMBER Y PO Box 606271 Northampton PLOT LINES SFE ADDRESS _X VL e„TE:MM9 c MA 010621413.5&1.8844 ee�s,TY1A0'f 6 IJ' ar v—v.ValleySolar.Solar SYSTEM Sl2P SA45kWDC 7.83MAC E vm::- 2 EUM.a191MMM (9 LG • - • Life's Good ■ rrrr■ ■r r■ rr rr LG NeON' R MMM LG NeON®R is new powerful product with global top level performance.Applied new cell structure without electrodes 60 cell on the front,LG NeON°R maximized the utilization of light ;— --i and enhanced its reliability.LG NeON®R demonstrates LG's pVE C L (!$ Cc t efforts to increase customer's values beyond efficiency.It wpm s : features enhanced warranty,durability,performance under real environment,and aesthetic design suitable for roofs. Enhanced Warranty •� High Power Output LG now offer 25 years product warranty to accommodate The LG NeON°1 R has been designed to performance warranty as well.LG NeON*R has an significantly enhance its output making it efficient enhanced performance warranty.After 25 years,LG even in limited space. NeON"'R is guaranteed at least 87.0%of initial performance. Aesthetic Roof ® Outstanding Durability •■ ° 9 LG NeON' R has been designed with aesthetics in With its newly reinforced frame design,LG mind:no electrode on the front that makes new NeON®R can endure a front load up to 6000 Pa, product more aesthetic.LG NeONI'R can increase and a rear load up to 5400 Pa. the value of a property with its modem design. •• Better Performance on a Sunny Day Near Zero LID (Light Induced Degradation) LG NeON°R now performs better on a sunny The n-type cells used in LG NeMs R have days thanks to its improved temperature coefficient almost no boron,which may cause the initial performance degradation,leading to less LID. About LG Electronics LG Electronics is a global player who has been committed to expanding its capacity,based on solar energy business as its future growth engine.We embarked on a solar energy source research program in 1985, supported by LG Group's rich experience in semi-conductor,LCD,chemistry,and materials industry,We successfully released first Monn Xm series to the market in 2010,which were exported to 32 countries in the following 2 years,thereafter.In 2013,NeONTM(previously known as Mono Xm NeON)8 2015 NeON2 with CELLO technology wan-lntersolar Award",which proved LG is Che leader of innovation in the industry. Mechanical Properties Electrical Properties(STC*) Cells 6)(10 Module 390 Cell Vendor LG Maximum Power(Pmax) 350 Cell Type Monocrystalline/N-type MPP Voltage(VmPP) 36.1 _ Cell Dimensions 161.7 x 161.7 mm/6 inches MPP Current(Impp) 9.70 Dimensions(L x W x H) 1700 x 1016 x 40 mm _ Open Circuit Voltage(Voc) 42.7 - 6693 x 40.0 x 1.57 inch Short Circuit Current(Isc) 10.77 Front Load 6,000Pa/125 psf Module Efficiency - 20,3 Rear Load 5,400Pa/113 psf Operating Temperature -40-+90 Weight 18.5 kg/40.79 lb Maximum System Voltage 1000 Connector Type _ MC4 ------ ---- -- -- ---------------- _ Maximum Series fuse Rating 20 Junction Box IP68 with 3 Bypass Diodes power Tolerance(%) 0-3_ +3 Length of Cables 1000 mm x 2 ea _ STC(Standard Test Condition)Irradiance 1,000 W/m°,Ambient Temperature 25 T.Aon 1 s Glass High Transmission Tempered Glass The nameplate power output is measured and determined by LG Electronics at its sole and absolute discretion. FrameAnodized Aluminium Tpica he tyl change in module efficiency at 200 WWin relation to 1000 W/m is-2.0% Certifications and Warranty Electrical Properties(NOCT*) Module _ 350 Certifications IEC 6121_5,IEC 61730-1/-2 _ Maximum Power(Pmax) 264 UL 1703 MPP Voltage(Vmpp) 36.0 IEC 61701(Salt mist corrosion test) MPP Current) 7.32 -- ---— IEC 62716(Ammonia corrosion test)_ Open Circuit Voltage(Voc) 40.1 ISO 9001 _ _- - _- Short Circuit Current(Isc) 8.67 Module Fire Performance(USA) Type 1 *NOCT(Nominal Operating Cell Temperature)Irradiance 800 Witri ambient temperature 20`C,wind speed i m/s Fire Resistance Class(CANADA) Class C(ULC/ORD C1 703) Product Warranty 25 years Output Warranty of Pmax Linear warranty** Dimensions(mm/in) "1)Flrct 5 years 95%,1?Aker 5th year 0.4%annijtl degradation,3)25 Wars 870% Temperature Characteristics NOCT qq+3 aC PP -0.30 YrC _ t t-.-I •.:•i Pm I _I Voc -0.24%/eC Isc 0.04%/"C -- Characteristic Curves I n. �­ Vohe9e rVJ I� P I � i ' r I i .�c ' ��. - .- •The distance betwieerh the center of the mounting/grounding holes. ® �� North America Solar Business Team Product specifications are subject to change without notice. W LG Electronics USA Inc OS-T1-72-W-G-P-EN-60630 J Life's Good 1000 Sylvan Ave,Englewood Cliffs,NJ 07632 Copyright©2017 LG Electronics.All rights reserved. Innovation for a Better Life � l Contact:lg.solar@)Ige.com 01/01!2017 ra www.igsotarusa.com 1� y The high-powered smart grid-ready Enphase F , 1 irra' and Enphase IQ 7+ Micro'" IQ 7 and IQ 7+ dramatically simplify the installation process while achieving the highest system efficiency. Microinverters Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ EnvoyTM, Enphase IQ Battery'", and the Enphase Enlighten'" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple *; y Faster installation with improved,lighter two-wire cabling F' Built-in rapid shutdown compliant(NEC 2014&2017) Productive and Reliable Optimized for high powered 60-cell and 72-cell*modules More than a million hours of testing Class 11 double-insulated enclosure UL listed ENPHASE s Smart Grid Ready Complies with advanced grid support,voltage and Wfrequency ride-through requirements _ Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) U� *The IQ 7+Micro is required to support 72-cell modules. To learn more about Enphase offerings,visit enphase.com � E N P H AS E Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-8-US IQ7PLUS-72-2-US/IQ7PLUS-72-R-US Commonly used module pairings' 235W-350W+ 235W-440W+ Module compatibility 50-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48V 60V Peak power tracking voltage 27V-37V 27V-45V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22V/48V 22 V/60 V Max DC short circuit current(module Isc) 15A 15A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC'ide protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter ._--------- __Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/rangez 240V/ 208V/ 240 V/ 208V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III 111 AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging in 9 EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.56/. 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -40°C to+65°C Relative humidity range 4°i to 100%(condensing) Connector type(IQ7-60-2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connectortype(IQ7-60-8-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,Corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use asthe load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at https://enphase.com/enjuLy 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com EN PHASE. ,c)2018 Enphase Energy All rights reserved All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 SNAPNRACK UR-40 RACKING SYSTEM REVISION: SHOWN MOUNTED ON ULTRA FOOT WITH SNAPNRACK A 11/3012017 NEW DETAIL MA UNIVERSAL END CLAMPS.FOR TILE MID CLAMP, ROOFING USE SNAPNRACK TILE "RAIL END OVERHANG" TMP' REPLACEMENT,UNIVERSAL TILE HOOK,OR NOT TO EXCEED 34%OF FLAT TILE HOOK SYSTEMS. ACCEPTABLE RAIL SPAN STANDARD LAG SCREW SPEC ASSUMES SNAPNRACK UNIVERSAL END CLAMP ASSEMBLY,TYP. YW 0 LAG SCREW WITH 2Y2"MIN. EMBEDMENT INTO STRUCTURAL MEMBER. TORQUE SPECIFICATIONS: SNAPNRACK ROOF ATTACHMENT %6"0 NUTS&BOLTS,10-16 FT LBS SNAPNRACK UR-40 RAIL,TYP. (MODULE HIDDEN FOR CLARITY) RAILS CAN BE MOUNTED ON EITHER SIDE OF ULTRA FOOT;UPSLOPE OR DOWNSLOPE, FOR UNEVEN ROOF SURFACES,UTILIZE DETAIL A THE SNAPNRACK LEVELER EXTENSION \ LEVELING SPACER.SEE DETAILS) `�� "RAIL SPAN"IS DEFINED AS "UR40-DOI, -'UR40-D08,""UR40-D09,"& DISTANCE BETWEEN "UR40-1)10;"FOR DETAILS AND \ ROOF ATTACHMENTS LIMITATIONS. / 1 � A \ "STRUCTURAL MEMBER(S)" MAY REFER TO RAFTERS,PURLINS, BEAMS,OR OTHER STRUCTURAL, LOAD-CARRYING MEMBERS SNAPNRACK MID CLAMP,TYP; CLAMP ASSEMBLY SHALL BE SELECTED TO MATCH PV MODULE "MODULE OVERHANG" NOT TO EXCEED 25%OF MODULE LENGTH OR MODULE MANUFACTURERS RECOMMENDATIONS SNAPNRACK ROOF ATTACHMENT LAG SCREWED INTO STRUCTURAL MEMBER. NO FLASHING SHOWN FOR CLARITY. <� Sunrun South LLC DESIGNER: M.Affentranger SCALE: DNS PART NUMBER: DESCRIPTION: REV -�n(ap tl Tv�� U 5 " °"° ^� � "�°° .'."F DRAFTER: M.Affentranger UR40-D06 UR-40-TYPICAL LAYOUT A DATE: 11/30/2017 o"m uc APPROVED BY: G.MCPheeters SNAPNRACK UR-40 RAIL SHOWN SPLICED REVISION: TOGETHER WITH THE SNAPNRACK ULTRAA Iln12017 NEW DETAIL MA RAIL SPLICE. 2"MIN 211 MAX �""�"RAIL GAP — — FOR THERMAL EXPANSION TOROUE SPECIFICATIONS: AT SPLICES — S 16"O NUTS&BOLTS,10-16 Fr-LBS — — CENTER SPLICE BETWEEN THE TWO BONDING CLIPS AS SHOWN IN"SPLICE ALIGNMENT LIMITS"VIEW RAIL EDGE MUST NOT PASS— SPLICE ALIGNMENT LIMITS THE CLIP EDGE,AS SHOWN. SNAPNRACK UR-40 RAIL, TY P. SNAPNRACK BONDING CLIP,TYPE 2 FOR BONDING ACROSS RAILS 8 Vivo-18 BOLT,S.S. SNAPNRACK ULTRA SPLICE ASSEMBLY, CENTER ON RAIL GAP t 1" -------------- SNAPNRACK ULTRA SNAPNRACK ULTRA SPLICE,THRU SPLICE,TAPPED �,n, Sunrun South LLC DESIGNER: M.Affentranger SCALE: DNS PART NUMBER: DESCRIPTION: REV ��C'��1��Iimx.�x,.x<�"•�.x.l� DRAFTER: M.Affentranger UR40-D05 UR-40 ULTRA SPLICE DETAILS A U ,.�as�.00....,.�n�.o. . DATE: 11/7/2017 ;.I. APPROVED BY: G.MCPheeter5 ... .. � "vmmexcexaENrarcmixuxsau,x uc.