Loading...
38B-229 (14) 65 FAIRVIEW AVE BP-2020-0209 GIs#: COMMONWEALTH OF MASSACHUSETTS Map-Block: 38B-229 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2020-0209 Proiect# JS-2020-000349 Est. Cost: $42986.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sg.ft.): 20952.36 Owner. LASH JONATHAN&ELLIE Zoning: URB(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT. 65 FAIRVIEW AVE Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON.811912019 0:00:00 TO PERFORM THE FOLLOWING WORK.-27 MODULES ON ROOF MOUNT SOLAR - 9.72KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 8/19/2019 0:00:00 $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner L40y-k- Department use only City of Northampton Status of Permit: Building Department mit 212 Main Street rl Cid�Gailabi ity Room 100 EWater/Well Av labilit Northampton, MA 0106 $Q,tiAf Str ctur Plansphone 413-587-1240 Fax 413- 87-1 /Stt ans er Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR OVAXE-0RiDENIOLISH H SNE O TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: Th' section to be completed by office 65 Fairview Ave, Northampton MA 01060 Map Lot62?44 Unit Zone Overlay District Elm St.District CB District SECTION 2 -PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Jonathan& Ellie Lash 65 Fairview Ave,Northampton MA 01060 Name(Print) Current Mailing Address: (202) 531 9045 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative, LLC 311 Wells Street, Suite B, Greenfield, MA,01301 Name(Print) � Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $42,986 (a)Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) J �� 5. Fire Protection 6. Total=(1 +2+3+4+5) $42,986 1 Check Number oZ. This Section For Official Use Only Date Building Permit Number: Issued: Signature: -l9'-Zol9 Building Commissioner/Inspector of Buildings Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L:= R:= L:= R:= L� Rear �� 0 Building Height —� F-1 Bldg. Square Footage Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document # B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alterations) Roofing ❑ Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [Q Siding [ED] Other[t3] Brief Description of Proposed n Work: � _o_�vy 5,k"r Qr o.qlg- Alteration of existing bedroom Yes No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes X No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a -OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT See Attachment A I, , as Owner of the subject property hereby authorize PV Squared to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date PV Squared as 6vmer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Chris Krezmiem Print Name 8/16/2019 Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of Tense Holder: Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street , Northampton MA 01060 03/14/2021 Address � Expiration Date� 413-772-8788 Signature Telephone 9.Realstered Home Improvement Contractor: Not Applicable ❑ Pioneer Vallev Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... El No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photovoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. 1 will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Jo AC,4�G., k L c- A Printed Name Date Vine Title /I Protwsal and Agreement M 00012802 Page 7 of 13 Eleanor and Jonathan lash-July 6.2017 '\ The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Ammlicant Information Please Print Legibly Name(Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.E✓ I am a employer with 48 employees(full and/or part-time).* 7. ❑New construction 2. 1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.[]I an,a homeowner doing all work myself.[No workers'comp.insurance required.]t 10 ❑Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.[:]Electrical repairs or additions proprietors with no employees. 12.E:]Plumbing repairs or additions 5.n I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.E]Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 14.El Other Solar PV 6.f-1We are a corporation and its officers have exercised their right of exemption per MGL c. 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that isproviding workers'compensation insurance for my employees. Below is thepolicy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Date:01/01/2020 Job Site Address:65 Fairview Ave City/State/Zip:Northampton MA 0106 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer[ n r t e /a' s nd penalties of perjury that the information provided above is true and correct. Si natu- . Date: 8/16/2019 Phone#:413-7 -87 8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Cornmonweallh cit Massachusetts Division ut Professional Li.censure Board of Building Regulations and Standards COnstrsiction Supervisor CS-111266 Eg.pires; 031l4J2021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAP.11"TON MA 01060 CUmmissionor Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 040077 311 WELLS ST SUITE 8 Expiration: 09l15I2019 GREENFIELD,MA 01301 Update Address and Return Card. SCA+ A 20M-W17 Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Suoolement Card before the expiration date. It found return to: Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09/152019 10 Park Plaza-Suite 5170 PIONEER VALLEY PHOTOVOLTAICS COOP Boston,M 0 116 1 CHRISTOPHER KREZMIENL. -- 311 WELLS ST SUITE B GREENFIELD,MA 01301 Undersecretary N t valid withoLit seanature DATE(MM/DD/YYYY) V CERTIFICATE OF LIABILITY INSURANCE 12/28/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers,CRIS NAME: Webber&Grinnell PHONE (413 586-0111 FAX AIC No Ext): ) 413 A/C,No: )586-6481 8 North King Street E-MAIL (powers webberand rinnell.com ADDRESS: @ g INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B Ohio Security/Liberty24082 : Pioneer Valley PhotoVOltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp 1-2020 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AUULbUl3K POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTEI!5 CLAIMS-MADE rx_�OCCUR PREMISES Ea occurrence) $ 300,000 MED EXP(Any one person) $ 5,000 A BKS57072282 01/01/2019 01/01/2020 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE $ 2,000,000 X POLICY ❑ PRO ❑LOC 2,000,000 JECT PRODUCTS $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident) X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED BAS57072282 01/01/2019 01/01/2020 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident X $1 K coil X $1 K comp Underinsured motorist BI $ 300,000 X UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 3,000,000 A EXCESSLIAe CLAIMS-MADE US057072282 01/01/2019 01/01/2020 AGGREGATE $ 3,000,000 DEC RETENTION$ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY YIN X STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE 1,000,000 C OFF(CER/MEMBER EXCLUDED? F7NNIA WC/TBD/NYR 01/01/2019 01/01/2020 . EACH ACCIDENT $ (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 Business Pers Property $1,750,000 A Commercial Property BKS57072282/NYR 01/01/2019 01/01/2020 Installation $50,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation ncludes Ma,CT,and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE I 111 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD OQU4 4 Rio Lash - Northampton lot. 8/16/2019 r. r- Owner: Jonathan and Eleanor Lash 65 Fairview Terrace Northampton, MA 01060 phone: (202) 5319045 e-mail: scatnee@Vahoo.com, -- - ' flash@hampshire.edu - - System size: DC STC kW: 9.72 Array: (27) SunPower SPR-X22-360 modules as 3 ' rows on South roof with modules omitted for / existing roof elements. See drawing right. Mounting: Ironridge rails on L-feet on Ecofasten ^', `•�, Quickfoot bases. See data sheets . Roof Structure: 2x6 rafters @ 16" OC. 35° pitch. See PE Letter. Roofing Material: Asphalt Composite Shingles Vreeland Design Associates An integrative approach to design engineering and site planning Date July 12, 2019 To: Adam Thurrell Pioneer Valley PhotoVoltaics Cooperative 311 Wells Street, Suite B Greenfield, MA 01301 From: David Vreeland, P.E. Vreeland Design Associates Re: Jonathan and Eleanor Lash, 65 Fairview Terrace,Northampton, MA: Structural assessment of existing house roof to support proposed solar array. I have investigated the existing roof framing for the proposed PV solar panel installation. The 24'x 36',2-story house was constructed in 1922. 27 PV solar panels are to be installed on the back south facing roof. The roof is framed with 2x6 rafters, 1'/4"x 53/4", installed 24"on-center, spanning 11'-6"with an 8.5/12 pitch. 2x6 ceiling joists are attached to the bottom of the rafters and prevent the roof from spreading. The roofing is composite asphalt shingles. The south rafters of the house will need to be reinforced to limit deflection under full snow load conditions and to be in compliance with the current building code. Install new 2x6x 10' long members, sistered and centered along the length,to one side of the existing 2x6 rafters. Attach the new 2x6s with 2 —TimberLok, or equivalent structural screws at 16" on-center, or if using a nailgun, nail with 3 — IOd or12d nails at 12"on-center. I have reviewed the mounting details for the proposed arrays. Based on my calculations and a PV panel unit weight of 46±lbs, with the attachment points of the array placed at a maximum of 4' on center and staggered to minimize the load to any one rafter, the reinforced rafters, as outlined above, are adequate to support the proposed PV solar panel arrays and the snow and wind load requirements of the current MA State Building Code. Please contact me if you have any questions or need additional information. Sincerely, Ikk Of R48 c� DAVID A. �G .4 V VREELAND 0 CIVIL y David Vreeland, PE No.46317 Vreeland Design Associates IsTEP�' •t�i AL 116 �O 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 PROJECT INFORMATION: N 0CkU440P • Owner: Ellie&Jonathan Lash Q �4 • Address: 65 Fairview Street �s46 Northampton, MA 01060 °'RT •o`'� • Phone: 413-253-2504 PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 • Email: scatnee@yahoo.com design@pvsquared.coop jlash@hampshire.edu 413-772-8788 • System Size: 9.72 kW DC-STC JOB: Lash • Modules: SunPower SPR-X22-360 SITE: 65 Fairview Street • Rail: Ironridge XR1 00 Northampton,MA 01060 • • Bases: Ecofasten Quikfoot REVISIONS: • Snow Load: 40 lbs • Wind Speed: 117 mph ROOF STRUCTURE: • 35° 2x6 rafters @ 16" O.C. See Engineer's Letter for more details ^ Site Plan No Scale ROOF MATERIAL: • Asphalt shingles Description Item Qty. PROJECT NOTES: QuikFoot AL Base Plate QF-AL-M 58 1. Framing location to be verified on site. Flashing, QuickFoor Black QFL-BLK-812 58 2. Slide rail assembly as needed to avoid Slotted L-Foot 3in Black SCL-101-3-ANODZD 58 interfering with splices or bases. Fastener 5/16x3-1/8in GRKRSS2 116 3. Unless otherwise noted bases are staggered GEO-CEL clear PRO FLEX26100 3 TITLE: Site Plan and spaced not more than 48"O.C. Ironridge XR100 11' Black XRL100-132BLK 16 4. Additional or alternative bases may be used Ironridge XR100 14' Black XRL100-168BLK 2 to meet actual roof conditions. FDN#: 11735 Ironridge XR100 Splice SPLIC2 8 BY: JG Ironridge Low Profile Grounding Lug IRN GD-LUG-003 S DATE: 8/2/2019 Ironridge Rail Clamp, Black UFO-CL001-B 66 Ironridge Rail Stopper, Black, 46mm UFO-STP-46MM 20 SCALE: No Scale Ironridge XR100 End Cap(1 Pair UR) XR100ENDCAP 10 SIZE: 8-112"x 1T" Ironridge Plastic Clip TW029-4000-077 54 Wire Management Clip DCS-1307 108 PV-01 p Mechanical Balance of System(MBOS) (Sheet i of 2) 'Dl Qg�u4RFa . — 1491Yt6"to Chimney 247Y4"between Chimneys 350 2x6 rafters *-- Array 1243/$" —* Array 207Y2" @ 16"O.C. A 0 441. so PV Squared Solar ( 26')— (11 )—1 (11')-.77)j- 311 Wells Street Suite 8 Greenfield,MA 01301 design@pvsquared.coop 413-772 8788 JOB: Lash ;D 00 ---- 14') -168" -13;" 11')-11 g" T r± SITE: 65 Fairview Street ro p Northampton,MA 01060 Q � REVISIONS: (11 )-1 1') 11 6" ,�— Array 1243/8" * 6 Array 249Y6" 176"to Vent Overall Array 4153/" Roof-448" Array centered in Southern Roof A Array Layout 3/16"=1'-0" " 4136" �` 2 16" TITLE: Array Layout RAIL SPECIFICATIONS FDN#: 11735 Make&Model: Ironridge XR100 — — — Clamp Torque: 80 in-lbs o BY. JG L-Foot Torque: 250 in-lbs �_ DATE: 82/2019 Max Span: 71" p — — — SCALE: As Shown Max Cantilever: 23" SIZE: 8.1/2"x 11" - - - 11'6" MODULE SPECIFICATIONS: � (46mm) ^` ,_O� Make&Model: SunPower SPR-X22-360 r V Clamp Range: 2"to 16"on all sides SPR-X22-360 Dimensions Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) B 1/4"=1'-0" (Sheet 2of2) More than 22% Efficiency High Performance & Excellent Durability Ideal for roofs where space is at a premium or where future expansion might be needed. X Maximum Performance SERIES Designed to deliver the most energy in demanding real-world conditions,in partial shade and hot rooftop temperatures.',',' Premier Technology Engineered with the newest and most powerful SPR-X22-360 Maxeon technology,X-Series brings unmatched power and performance to your home. Highest Efficiency' Generate more energy per square foot X-Series residential panels convert more sunlight to electricity by producing 38%more power per panel' and 70%more energy per square foot over 25 years.1,21 Highest Energy Production' Produce more energy per rated watt Maxeon'Solar Cells:Fundamentally better High year-one performance delivers 8-10%more energy per rated watt.' Engineered for performance,designed for durability. This advantage increases over time,producing 21%more energy over the first 25 years to meet your needs.' Engineered for Peace of Mind Designed to deliver consistent,trouble-free I-- 1201N, 2 3 More Energy energy over a very long lifetime.3,4 110% Per Rated watt 100% Designed for Durability 90% 36%more, year 25 0- The SunPower Maxeon Solar Cell is the only cell 80% built on a solid copper foundation.Virtually w 70% Conventional impervious to the corrosion and cracking that > 6C% degrade conventional panels.3 N so% o s 10 15 20 25 Years Same excellent durability as E-Series panels. 10% Maintains High #1 Rankin Fraunhofer durability test.9 3 Power at High Temps i 100%power maintained in Atlas 25+ No Light-Induced Degradation j comprehensive durabilitytest.70 6% High Average Watts 4% - Better Low-light and Spectral Response 2% High Performance Anti Reflective Glass v Datasheet POWE • r SunPower Offers The Best Cod Power 100% Power Warranty Product Warranty I 95% 90% 85% 80% 75% 0 5 10 1s 20 25. 0 5 10 15 20 25 Years Years c Me—„nalP—dil-'rwananry More guaranteed power:95%for first 5 years, Combined Power and Product defect 25-year coverage -0.4%/yr.to year 25 7 that includes panel replacement costs 8 Tests • - SPR-X22-360 Standard Tests13 L11-1 703(Type 2 Fire Rating),IEC 61215,IEC 61730 Nominal Power(Pnom)71 360 W Quality Certs ISO 9001:2008,ISO 14001:2004 Power Tolerance +5/-0% EHS Compliance ROHS,OHSAS 18001:2007,lead free,REACH Avg.Panel Efficient 12 22.2% SVHC-163,PV Cycle Rated Voltage(Vm ) 60.6 V Sustainability Cradle to Cradle(eligible for LEED oints)14 Rated Current(Im ) 5.94 A Ammonia Test IEC 62716 Open-Circuit Voltage(Voc) 69.5 V Desert Test 10.1109/PVSC.2013.6744437 Short-Circuit Current(Isc) 6.48 A Salt Spray Test IEC 61701 (maximum severity) Max.System Voltage 600 V UL&1000 V IEC PID Test Potential-Induced Degradation free:1000 V9 Maximum Series Fuse 15A Available Listings UL,TUV,JET,CEC Power Temp Coef. -0.30%/°C voltage Temp Coef. -167.4 mV/*C Current Tem Coef. 3.5 mA/0 C Temperature -40°F C) to+185°F(-40°C to+85° REFERENCES: Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) 1 All comparisons are SPR-X21-345 vs.a representative conventional panel:250 W,approx.1.6 m2, Appearance Class A+ 15.3%efficiency. Solar Cells 96 Monocrystalline Maxeon Gen III 2Typically8-10%more energyperwatt,BEW/DNV Engineering"Sun Power Yield Report,"Jan 2013. Tempered Glass High-transmission tempered anti-reflective 3 SunPower 0.25%/yr degradation vs.1.0%/yr conv.panel.Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower white paper,Feb 2013;Jordan,Dirk"SunPower Test Report,”NREL, junction BOX IP-65,MC4 compatible Q1-2015. Weight 41 lbs(18.6 kg) 4 SunPower Module 40-Year Useful Life"SunPower white paper,May 2015.Useful life is 99 out of 100 panels operating at more than 70%of rated power. Max.Load Wind:62 psf,3000 Pa,305 kg/m2 front&back 5 Highest of over 3,200 silicon solar panels,Photon Module Survey,Feb 2014. Snow:125 psf,6000 Pa,611 kg/M2 front 6 1%more energy than E-Series panels,8%more energy than the average of the top 10 panel Frame Class 1 black anodized(highest AAMA rating) companies tested in 2012(151 panels,102 companies),Photon International,Feb 2013. 7 Compared with the top 15 manufacturers.SunPower Warranty Review,May 2015. 8 Some restrictions and exclusions may apply.See warranty for details. 46 mm 9 X-Series same as E-Series,5 of top 8 panel manufacturers tested in 2013 report,3 additional 1558 mm [1.8 in] panels in] �If- panels in 2014.Ferrara,C.,et al."Fraunhofer PV Durability Initiative for Solar Modules:Part 2". Photovoltaics International,2014. FRAME PROFILE 10 Compared with the non-stress-tested control panel.X-Series same as E-Series,tested in Atlas 251 Durability test report,Feb 2013. 11 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25°C).NREL calibration Standard: 1046 mm E� SOMS current,LACCS FF and Voltage. [41.2 in] 12 Based on average of measured.power values during production. 13 Type 2 fire rating per UL1703:2013,Class C fire rating per UL1703:2002. 30 mm 14 See salesperson for details. [1.2 in] Please read the safety and installation guide Seewww.sunpower.com/facts for more reference information. Rn nnotedetails,see extended dat�,.hcm vavnv,�inpoweccomrdatasheets. Uuwe.ei.t#514618 RevA/LTR US IRONRIDGE XR100 Rail See Des tion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-axis) 0.390 in Moment of Inertia (Y-axis) 0.085 in" Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in" 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) 58 �-� 1.25 Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132'(11 Feet) 7.50 lbs. XR-100-168A XR-100-1688 XR100, Rail 168"(14 Feet) 9.55 lbs. XR-100-204A XR-100-2046 XR100, Rail 204"(17 Feet) AlAuminumluminum 11.60 lbs. V1.1 IRONRIDGE XR100 Bonded Splice XR-100 RAIL i i' r 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE � 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1.24 63 1.93 .31 �h 0.42 .15— .93 #12-14 TYPE "B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear v1.0 QuikFootPRODUCT GUIDE Exploded Product View/B.O.M. - 1 Installation Instructions - 2 Cut Sheets - 3 Specifications - 4 �• � , t1F d ilw DAC Eq a rEcoFasten Solar 1, 1Wi i QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly 7 Item No. Description of Material/Part Quantity 6 1 QuikFoot Base Plate 1 ® 2 Fastener(Length to be determined) 2 5 3 QuikFoot Flashing 1 4 EPDM Washer 1 a5 L-102-3"Bracket*(other options available) 1 }' 4 6 5/16"EPDM Bonded 18.8 SS Washer 1 1 7 3/8"Stainless Steel Hex Nut 1 3 (� Required Tools av 1 877-859-3947 EcoFasten Solarg All content protected under copyright.All rights reserved.10/09/14 t,1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181.398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8.245.454 B2 8,272,174 B2 8,225,557 132 Tia QuikFoot— Product Guide Cut Sheets: QF-AL--Base 2X 0 .33in [8.38mm] r. E E O 0 O CO N N L CO 00 w O 1 .50in V [38.1Omm] 3/8"-16 Stud E E � � � o- r-I M U Q F-M : 1 .5" U QF-L : 1 .75" 877-859-3947 EcoFasten Solar')All content protected under copyright.All rights reserved.10/09/14 3.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8.245,454 B2 8,272,174 B2 8,225,557 B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] .032in [0.81 mm] (f) 12.00in [304.80mm] w 0 3.00in [76.20mm] .50in �- 8.00in [ 12.70mm] [203.20 m m] 877-859-3947 EcoFasten Solare All content protected under copyright.All rights reserved.10/09/14 32 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 I T. QuikFoot– Product Guide Cut Sheets: Bracket Options-SCL-101-3 i J' 3/8„ 46 SERRATIONS 0 7/8 Rl/16" 1/4" 00 3/4.. — 1/16" R.005 R.010 r 2X R.O1 60.000 / 0 3/8 +.002 v /8 1 0 7/8" X 820 DETAIL A SCALE 3:1 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.10/09/14 3.7 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 132 8,166,713 132 8,146,299 B2 8,209,914 B2 8,245,454 132 8,272,174 B2 8,225,557 B2 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A. WORK INCLUDES A. Submit manufacturer's written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. ultimate and allowable load values specific to as shown in load test data. B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.Division7:Thermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTION A. Bracket is mill finish aluminum I A. COMPONENTS: ns DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel within hours of any missing or defective items. PART 3- EXECUTION stud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and off the ground until installed and(1)bonded stainless steel and EPDM . 3.1 EXAMINATION washer. A. Substrate: Inspect structure on which brackets 2. Fasteners PART 2 - PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B. Fasteners should be selected for compat- EcoFasten Solar 289 Harrel Street,Morrisville,VT 05661 B. Notify General Contractor of an deficiencies O ibility with the roof deck. fi' Y C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolar.com U system.See test data at C. Verify that roofing material has been installed wstem. fastest data at 2.2 MATERIALS correctly prior to installing solar attachment A. Attachment Bracket brackets. 3. Sealant(if required by roof manufacturer): 6000 Series Aluminum(choose one) to be roof manufacturer approved. 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted A. Comply with architectural drawings and project 5. Aluminum attachment bracket 2. F-111-A engineer's recommendations for location of 3.P-3-CSK system.Comply with Manufacturer's written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5. L-102-3" project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-859-3947 EcoFasten Solar"'All content protected under copyright.All rights reserved.10/09/14 4.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181.398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8.245,454 B2 8,272,174 B2 8.225,557 132 3/8„ A 46 SERRATIONS �o L 1 7/8" � RI /16" 1 /4" 00 3/4.1 � 1/16" R.005 R.010 I� 2X R.OI � -- - --�-- - -� 60.000 3/8"±.006 002 �/ - 1 /8" •X +/- •1 0 7/8" X 820 DETAIL A — .XX = +/- .01 SCALE 3:1 .XXX= +/- .005 289 Harrel Street Qt,AD Morrisville, VT 05661 SCL- 101 -3 EcoFasten Solaro Toll Free Phone 1.877. Toll Free Fax 1.888.766766..99947 994 MATERIAL: 6000 SERIES ALUMINUM Q web www.ecofastensolar.com e-mail info@ecofastensolar.com SCALE: 1:1 1/6/2012 SHEET 1 OF 1 Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 553 through 5560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities snug � RF Q PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 J Fax:413-772-8668 311 Wells St.,Ste. 8 Greenfield,MA 01301 MA Elec.Lic.A13764 1 MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager