Loading...
31C-057 7 HIGGINS WAY BP-2020-0024 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 3 1 C-066 CITY OF NORTHAMPTON Lot: -1 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYST M BUILDING PERMIT Permit# BP-2020-0024 Proiect# JS-2020-000039 Est.Cost: $24483.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor. License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sg.ft.): Owner: ASLIN PATRICIA Zoning:- Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 7 HIGGINS WAY Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B 413 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON.7/12/2019 0:00:00 TO PERFORM THE FOLLOWING WORK.ROOF MOUNTED SOLAR ARRAY, 20 PANELS 6.54 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Servic�i Meter: Footings: Rough: Rough House# Foundation: Driveway Final: Final: Final: Rough Frame: I Gas: Fire DiDartment Fireplace/Chimney: Rough: Oil: Insulation: Final: Smok : Final: THIS PERMIT MAY BE OKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND GULATIONS. Certificate of Occupancy Shinature: FeeTyue: Uate Paid: Amount: Building 7/12/ 019 0:00:00 $75.00 12 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner Department use only City of Northampton Status of Permit Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office nn Map ��l' Lot 66 CzUnit 7 Higgins Way, Northampton MA 01060 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Patricia Aslin 7 Higgins Way,Northampton MA 01060 Name(Print) Current Mailing Address: 585-360-5321 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative, LLC 311 Wells Street, Suite B, Greenfield,MA,01301 Name(Print) Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $6,904 (a) Building Permit Fee 2. Electrical 17,579 (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = 0 +2 + 3+4+ 5) $24,483 Check Number 10 This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date 5a V4 Q Qf4 T PV Squared Solari www.pvsquared.coop ` Phone:413-772-8788 Fax:413-772-8668 + t311 Wells St.,Ste.a I Greenfield,MA 01301 T Shy JUL – 5 201119 MA Elec.Lic.A13764 MA HIC 140077 - j F,F IT OF DUILDING INSPECT!,:-- �0a NORTHAMPTON,MA 010 Dear Town Inspections Officials;—- -- Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, As— Adam Thurrell Operations Manager Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % r Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW © YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO Q IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement windows Alteration(s) Roofing Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [[] Siding [O] Other[O] Brief Description of Proposed Work: PV array will be installed on the southwest facing roof of the building Alteration of existing bedroom Yes No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes X No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Patricia Aslin as Owner of the subject property hereby authorize PV Squared to act on my behalf, in all matters relative to work authorized by this building permit application. See Attachment A 6/24/2019 Signature of Owner Date PV Squared as 6mmer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Chris Krezmiem Print Name 6/24/2019 �f Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address IIVAL� Expiration Date 413-772-8788 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 0 No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildin¢permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature DocuSign Envelope ID:97C03192-93DC-49D4-88FE-B63A5D4D0046 ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photovoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Patricia Aslin 4/8/2019 1 11:15 AM EDT Printed Name Date FrDolcuSigned by: ogV1Ua QS v, owner Signa ure 4 u I Title Printed Name Date Signature Title Proposal and Agreement#00014612 Page 6 of 12 Patricia Aslin-April 8,2019 Commonwealth at Massachusetts r Diviskon of P►ofessionai LMcensu►e Board of Building Regulations and Standards Constrotlon Supervisor CS-111266 Expires 03/1412021 DANIEL. GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON NIA 01060 A Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type. Supplement Card PIONEER VALLEY P OTOVOLTAICS COOP Registration: 040077 311 WELLS ST SUITE B Expiration: 09/15/2019 GREENFIELD.MA 01301 Update Address and Return Card. CCA+ G 201+1.0910' -.. .�/. %hiii✓v Iry i1/� .,1.,.,y.: .,.,. .. .. Offloa.of Consumer Affair 3 Busl ess Regulation MOME IMPROVEMENT CO RACTOR Registration valid for individual use only TYPE:Suoolemenl Cwd before the expiration date. It found return to: Registration Office of Consumer Affairs and Business Regulation 1400T7 09/ 512019 10 Park Plaza•Suite 5170 PIONEER,VALLEY,PHOTOVOLTAIC COOP :Boston, 6 t CHRISTOPHER KREZMIEN 311 WELLS ST SUITE 6 GREENFIELD:MA.01301 Nidt Valid with0 t 'gnature Undersecretary '\ The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone #:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.0 lam a employer with 48 employees(full and/or part-time).* 7. ❑New construction 2. 1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling 3.Fany capacity.[No workers'comp.insurance required.] 9. El Demolition 3. ]I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10E]Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.rl 1 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑ p Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.[✓ Other Solar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Date:01/01/2020 Job Site Address:7 Higgins Way, City/State/Zip:Northampton MA 0106 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce r t e a' s nd penalties of perjury that the information provided above is true and correct Si natu Date: 6/24/2019 Phone#:413-7 -87 8 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: DATE(MM/DD/YYYY) Aco CERTIFICATE OF LIABILITY INSURANCE 12/28/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers,CRIS NAME: Webber&Grinnell PHONE -0111 FAX (413)586-6481 [A'C' IC No Ext): (413)586 AIC,No): 8 North King Street E-MAIL (powers@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp 1-2020 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ( LICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MMIDD/YYYY MM DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1'000'000 DAMAGE TO_7CLAIMS-MADE � OCCUR PREMISES Ea occurRENTErence) 3OO,300,000nte $ MED EXP(Any one person) $ 5,000 A BKS57072282 01/01/2019 01/01/2020 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $ 2,000,000 X JECT ❑LOC PRODUCTS-COMP/OPAGG $ 2,000,000 POLICY ❑ PRO OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) S B OWNED SCHEDULED BAS57072282 01/01/2019 01/01/2020 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY /� AUTOS ONLY Per accident X $1 K toll X $1 K comp Underinsured motorist BI $ 300,000 UMBRELLA LIAR _`C' 6" 3,000,000 OCCUR EACH OCCURRENCE $ A EXCESSLIAB HCLAIMS-MADE US057072282 01/01/2019 01/01/2020 AGGREGATE $ 3'000'000 DED RETENTION $ $ AT COMPENSATION X STATUTE EORH AND EMPLOYERS'LIABILITY Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBER EXCLUDED? N/A WC/ BD/NYR 01/01/2019 01/01/2020 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Commercial Property Business Pers Property $1,750,000 A BKS57072282INYR 01/01/2019 01/01/2020 Installation $50,000 Transportation $75,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation ncludes Ma,CT,and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Aslin Building Permit Pictures PROJECT INFORMATION: IN sUn4 QARN��O • Owner: Richard & Patricia Aslin • Address: 7 Higgins Way 1 f Northampton, MA 01060 s // �r �At • fog • Phone: (585)309-8010 (585)360-5321 PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 • Email: dick.aslin@gmail.com paslin50@gmail.com design@pv4g3-772-8788 • System Size: 6S4 kW DC--STC JOB: Aslin • Modules: SunPower SPR-E20-327 SITE: 7 Higgins Way • Rail: Ironridge XR1 00 Northampton,MA 01060 • Bases: Ecofasten Quikfoot REVISIONS: • Snow Load: 40 lbs • Wind Speed: 117 mph ROOF STRUCTURE: • 41° 2x12 rafters @ 16"O.C. Site Plan ROOF MATERIAL: No Scale • Asphalt shingles PROJECT NOTES: 1. Framing location to be verified on site. Part Make/ Model Qty. 2. Slide rail assembly as needed to avoid interfering with splices or bases. Base Ecofasten Quikfoot 62 3. Unless otherwise noted bases are staggered Flashing Ecofasten Quikfoot 62 and spaced not more than 48" O.C. L-Foot, Black Ecofasten SCL-101-3 62 TITLE: Site Plan 4. Additional or alternative bases may be used Fastener GRK RSS 5/16"X 3-1/8" 124 to meet actual roof conditions. Sealant Geocel 3 14'XR100 Rail, Black Ironridge XR-100-168B 14 BY: 12258 17'XR100 Rail, Black Ironridge XR-100-204B 2 By: Rail Splice Ironridge XR-100-SPLC-M1 8 DATE: 6/6/201199 Rail Clamp, Black Ironridge UFO-CL-01-B1 50 SCALE: No Scale Rail Stopper, Black,46mm Ironridge UFO-STP-46MM-B 20 SIZE: 8-112"x11 Rail Cap Ironridge XR-100-CAP 10 Optimizer Bolt Ironridge MI-BHW 20 D\/_O 1 B Mechanical Balance of System(MBOS) I V (Sheet 1 of 2) Array flush with ridge O,v 41°2x12 rafters @ 16" O.C. and pushed East to ?� � S ASF leave room for dormer. Q O LL Roof-552" Array 493" 07j;.509:ef R,RT ` so w• 16 (14')—1 58 ( 7' ` PV squared solar 311 Wells Street,Suite B Greenfield,MA 01301 16 ( 4' - 4 " �., design@pvsquared.coop 413-772-8788 JOB: Aslin J- 5 - N - SITE: 7 Higgins Way m I Northampton,MA 01060 O W o REVISIONS: - m v E 0 r E w O O o � Array 308" '' Array61V16" 4 dormer 1075/6"-�- 657/" -� /Array Layout TITLE: Array Layout 2" ---- RAIL SPECIFICATIONS 16" 11%6"(46mm) Make& Model: Ironridge XR100 BvN# 12258 JG Clamp Torque: 80 in-lbs _ L-Foot Torque: 250 in-lbs \ DATE: 6/6/2019 m Max Span: 75" — SCALE: As Shown Max Cantilever: 25" SIZE: 8-1 12"x 11" MODULE SPECIFICATIONS: 61 i6" Make& Model: SunPower SPR-E20-327 P\/ V -O 2 Clamp Range: 2"to 16"on all sides SPR-E20-327 Dimensions Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) B 1/4"=1-0" (Sheet 2 of 2) New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com May 24, 2019 Ms. Madeleine Geschwind Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street, Suite B Greenfield, MA 01301 Re: Aslin residence, Northampton, MA PV Squared Project No. 12258 NECE Project No. 19-001 T-26 Dear Ms. Geschwind, At your request New England Construction Engineering, PLC (NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared) provided on the roof and supporting structure at the Aslin residence, at 7 Higgins Way, in Northampton, MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic (PV) array. The information that you provided is attached to this letter for reference. You are proposing to erect PV panels on the roof of the house. The house is a recently constructed two-story residence with an attached, garage. There are second-floor bedrooms over the garage. The house has a gable roof with an intersecting gable roof and gable dormer. You provided design plans from The Pecoy Companies dated April 2017. The section of house where your proposed PV array will be mounted is approximately 39' wide. The roof I supported by 2x12 rafters at 16" O.C.These rafters span approximately 19' on the horizontal.The roof has a 10/12 pitch. The roof has a plywood deck and asphalt shingles. NECE's review and analysis included controlling gravity load combination (dead load and snow load). Lateral loads (wind and seismic) are excluded from this review. Conclusion: Based on the information that you provided, in my opinion, the roof will support the design snow load and the additional dead load of your proposed PV array. I base this opinion on the following assumptions. I assume that PV panels will be installed parallel to the roof, eliminating any additional wind load. I further assume that, owing to their smooth surface, the PV panels will shed snow more readily than the existing asphalt shingles. The ground snow load (Pg) for Northampton is 40psf. According to the information that you have provided, the proposed PV panels weigh approximately 2.3 psf. New England Construction Engineering, PLC PV Squared—Newsome Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 In summary, in my opinion, the roof will support your proposed PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. 1 N OF 4gss90 Sincerely, JONATHAN A 0 • o RUGG J,7 No. 51982 'n A onathan Rugg, P.E. ' �FSSbN � ' New England Construction Engineering, PLC. 5/24/201 if 4 Attachments: -Building Information E-SERIES • Ae PANELS � HIGH PERFORMANCENTD RABILITY G & EXCELLENT U P SERIES a • 20.4%efficiency Ideal for roofs where space is at a premium or where future expansion might be E20 327 PANEL needed. • High performance HIGH EFFICIENCY° Delivers excellent performance in real world Generate more energy per square foot conditions, such as high temperatures, clouds and low light.1,2,1 E-Series residential panels convert more sunlight to electricity producing 36% more power per panel,' and 60% more energy per square foot • Proven value over 25 years.3,4 Designed for residential rooftops, E-Series panels deliver the features, value and HIGH ENERGY PRODUCTION' performance for any home. Produce more energy per rated watt High year one performance delivers 7-9% more energy per rated watt.3 This advantage increases over time, producing 20% more energy over the first 25 years to meet your needs.4 a 120°x° 20% 3 More Energy 110% Per Rated Watt c Maxeon®Solar Cells:fundamentally better. •0 100% --Sun -----• Engineered for performance, designed for durability. 0 90% 35%more, a year 25 Engineered for peace of mind >, 80% Designed to deliver consistent, trouble-freew 70% Conventional energy over a very long lifetime.4,5 0 60% r Designed for durabilityN 0 5 10 50 i° The SunPower Maxeon Solar Cell is the Years 15 20 25 only cell built on a solid copper foundation. r a 10% Virtually impervious to the corrosion and 3 Maintains High Jyti cracking that degrade Conventional a% Power at High Temps o 1 Panels.4.5 0 l No Light-Induced PHOTON / o b% Degradation 'PO #1 Ranked in Fraunhofer durability test.10 Q High Average Watts 100% power maintained in Atlas 25+ 2) 4% _ Better low-Light and comprehensive PVDI Durability test." QC) Spectral Response LU 2% High-Performance o Anti-Reflective Glass 0% www.sunpower.com SUNPOWER E-SERIES AR PANELS SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY 100 ss 95% SunPower 90% Traditional 85% 80% Warranty 75% 0 5 10 15 20 25 0 5 10 15 20 Years Yeors More guaranteed power:95%for first 5 years, Combined Power and Product defect 25 year coverage -0.4%/yr. to year 25.8 that includes panel replacement costs. �. ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA E20-327 E19-320 Temperature -40°F to+185°F(-40°C to+85°C) _ Nominal Power12(Pnom) 327 W 320 W Wind:50 psf, 2400 Pa,245 kg/m2 front&back / o / o Max load Snow: 1 12 psf,5400 Pa,550 kg/m2 front Power Tolerance +5 -0% +5 -0% � _ Avg. Panel Efficiency13 20.4% 19.8% Impact resistance 1 inch (25mm)diameter hail at 52 mph(23 m/s). Rated Voltage (Vmpp) 54.7 V 54.7 V Appearance Class A - Rated Current(Impp) 5.98 A Solar Cells 96 Monoc stalline Moxeon Gen II 5.86 A _. Open Circuit Voltage (Voc) 64,9 V 64.8 V Tempered Glass High transmission tempered Anti-Reflective --- - -- -- Short-Circuit Current(Isc) 6.46 A 6.24 A I Junction Box IP 65 Rate Max. System Voltage 600 V UL& 1000 V IEC I Connectors MCA Compatible Connectors Frame Class 1 black anodized (highest AAMA rating) Maximum Series Fuse 15 A Power Temp Coef. -0.38%/°C Weight 41 lbs(1 6.6 kg) Voltage Temp Coef. -176.6 mV/°C TESTS AND CERTIFICATIONS Current Temp Coef. 3.5 mA/°C ` Standard tests UL1703 (Type 2 Fire Rating), IEC 61215, IEC 61730 REFERENCES: Quality tests ISO 9001:2008, ISO 14001:2004 f 1 All comparisons are SPR-E20327 vs.a representative conventional panel:250W, EHS Compliance RoHS,OHSAS 18001:2007, lead free a rox. 1.6 m2, 15.3%efficiency.Y i Ammonia test IEC 62716 2 PVEvolution labs"SunPower Shading Study,"Feb 2013. f Salt Spray test IEC 61 701 (passed maximum severity) 3 Typically 7-9/o more energy per watt, BEW/DNV Engineering "SunPower Yield Report,"Jan 2013. PID test Potential-Induced Degradation free: 1000V10 4 SunPower 0.25%/yr degradation vs. 1.0%/yr cony. panel. Campeau, Z. et al. Available listings UL,CEC,CSA,TUV,JET, KEMCO,MCS, FSEC "SunPower Module Degradation Rate," SunPower white paper, Feb 2013;Jordan, Dirk"SunPower Test Report,"NREL,Oct 2012. 5 "SunPower Module 40-Year Useful Life"SunPower white paper,Feb 2013. Useful life is 99 out of 100 panels operating at more than 70%of rated power. 6 Second highest, after SunPower X-Series, of over 3,200 silicon solar panels, Photon Module Survey,Feb 2014. 1046 mm 7 8%more energy than the average of the top 10 panel companies tested in 2012 t [41.2 In] (151 panels, 102 companies),Photon International,Feb 2013. 8 Compared with the top 15 manufacturers. SunPower Warranty Review, Feb 2013. 9 Some exclusions apply.See warranty for details. 10 5 of top 8 panel manufacturers from 2013 report were tested, 3 additional 46 mm ►{ 1559 mm---� silicon solar panels for the 2014. Ferrara, C., et al. "Fraunhofer PV Durability [1.8 In] [61.4in] Initiative for Solar Modules:Part 2".Photovoltaics International,77-85. 2014. 11 Compared with the non-stress-tested control panel. Atlas 25+ Durability test report, Feb 2013.from 2013 report were tested, 3 additional silicon solar panels for the 2014. Ferrara, C., et al. "Fraunhofer PV Durability Initiative for Solar Modules: Part 2". Photovoltaics International,77-85. 2014. 12 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25°C). 13 Based on average of measured power values during production See http://w sunpower com/Facts for more reference information. For more details,see extended datasheet:www.sunpower.com/datosheets.Read safety and installation instructions before using this product. www.sunpower.com mDecember 2014 SunPower Corporation.All rights reserved.SUNPOWER,the SUNPOWER logo,MAXEON,MORE ENERGY.FOR LIFE.,and SIGNATURE are trademarks or registered trademarks of SunPower Corporation.Specifications included in this datasheet ore subject to change without notice. Dor"meri#504860 Rev D/LTR-US .l.. - IRONRIDGE XR100 Rail Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int bb Section Modulus (X-axis) 0.297 in3 .46 Moment of Inertia (X-axis) 0.390 in �— Moment of Inertia (Y-axis) 0.085 in' Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in" 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 7.50 lbs. Aluminum XR-100-168A XR-IMI68B XR100, Rail 168" (14 Feet) 6000-Series 9.55 lbs. XR-100-204A XR-100-2048 XR100, Rail 204" (17 Feet) 11.60 lbs. V1.1 .. L IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-1 00-SPLC-BD KIT, XR100 BONDED SPLICE � 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling I I Sr 1.24 63 1.93 .31 0.42 .15 E-�— .93 #12-14 TYPE "B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear V1,0 V I . z OuikFootPRODUCT GUIDE Exploded Product View/B.O.M. - 1 Installation Instructions - 2 Cut Sheets - 3 '-• Specifications -4 Uj rL LU 1 o°a OaEcoFasten Solar5 QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 5 3 QuikFoot Flashing 1 4 EPDM Washer 1 O5 L-102-3"Bracket*(other options available) 1 5/16" EPDM Bonded 18.8 SS Washer 1 �1 7 3/8"Stainless Steel Hex Nut 1 3 Required Tools w 2 t J O W 009 ;Z4 a � ood - M 877-859-3947 EcoFasten Solar°Al content protected under copyright.All rights reserved.10/09/14 1.t EcoFasten Solar products are protected by the following U.S.Patents:8.151,522 B2 8,153,700 132 8,181,398 B2 8.166,713 132 8,146,299 132 8,209,914 132 8.245,454 132 8,272.174 132 8,225,557 132 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0 .33in [8.38mm C 0 E CD V1 0 � E �0- O r� CN O C7 . LO N LO CO C4 V 00 CD O _ w O 1 .50in [� V [38.l 0mm l 3/8"-16 Stud 10E E b -'1- QF o� Q F-M : 1 .5" QF-L : 1 .75" 877-859-3947 EcoFasten Solan All content protected under copyright.All rights reserved.10/09/14 3.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8.272,174 B2 8,225,557 B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] .032in [0.81 mm] M VIM* V1 (f� 12.00in [304.80mm] w c _ V 3.00in �QQ [ 76.20mm] �vQ .50in 8.00in _ [ 12.70mm] [203.20mm] 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.10/09/14 3.2 EcoFasten Solar products are protected by the foOowing U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272.174 B2 8.225,557 B2 QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8„ A 46 SERRATIONS 4. 4� cn - R1/16 1 R,005 rr/ R.010 C \ 2X R.01 ; O 60.000 Q <D 006 1/8" ,� � � 3/8""-.002 0 7/8" X 82° DETAIL A SCALE 3:1 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.10/09/14 3.7 EcoFasten Solar products are protected by the following U.S.patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 132 8.245,454 B2 8,272,174 132 8,225,557 132 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A. WORK INCLUDES A. Submit manufacturer's written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 S& attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data, showing application and meet specified pull out values J� for the roof system. as shown in load test data. ultimate and allowable load values specific to B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500 Roofing 1.4 QUALITY ASSURANCE plate O 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.Division7:Thermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTION A. Bracket is mill finish aluminum A. COMPONENTS: 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel within 24 hours of any missing or defective items. PART 3 - EXECUTION stud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and off the ground until and(1)bonded stainless steel and EPDM installed. 3.1 EXAMINATION washer. A. Substrate: Inspect structure on which brackets 2. Fasteners PART 2 - PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B. Fasteners should be selected for compat- EcoFasten Solar 289 Harrel Street,Morrisville,VT 05661 B. Notify General Contractor of an deficiencies O ibility with the roof deck. fY Y C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolar.com V system.See test data at C. Verify that roofing material has been installed 2.2 MATERIALS correctly prior to installing solar attachment www.ecofastensolar.com A. Attachment Bracket brackets. 3. Sealant(if required by roof manufacturer): to be roof manufacturer approved. 6000 Series Aluminum(choose one) 3.2 INSTALLATION Pia 4. Aluminum counter-flashing 1.CP-SQ-Slotted A. Comply with architectural drawings and project 5. Aluminum attachment bracket 2. F-111-A engineer's recommendations for location of aD 3.P-3-CSK system. Comply with Manufacturer's written in- 111;, v4 B. DESIGN REQUIREMENTS: 4.SCL 101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5. L-102-3" project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.10/09/14 4.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151.522 B2 8.153.700 B2 8.181,398 B2 8.166.713 B2 8.146.299 B2 8.209.914 B2 8.245.454 B2 8.272.174 B2 8,225.557 B2 A 46 SERRATIONS cY. NO I LO — 1 7/8' - — -a R 1/1 1/4. bo 3/4„ 1 /16" R.005 — R.010 2X R.O l - - - 60.000 3/8"+.002006 ,. 1 /8 .X = +/- 1 7/8'' X820 DETAIL A SCALE 3:1 .XX = +/- .01 .XXX= +/- .005 289 Harrel Street pOp Morrisville, VT 05661 SC L-101 -3 ® Toll Free Phone 1.877.859.3947 Q EcoFasten Solar Toll Free Fax 1.888.766.9994 MATERIAL: 6000 SERIES ALUMINUM ��JQ web www.ecofastensolar.com e-mail info@ecofastensolar.com SCALE: 1:1 1/6/2012 SHEET 1 OF 1 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, [earner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shalt the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 SS3 through §560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicinp, of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug anal play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Interconnecting Customer: Patricia Aslin Contact Person: Mailing Address: 7 Higgins Way Lot 1 City: Northampton State: MA Zip Code:01060-3676 Telephone (Daytime): (585) 360-5321 (Evening): Facsimile Number: E-Mail Address: paslin50@gmail.com Address of Facility (if different from above): Electrical Contractor's Name (if appropriate): PV Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD State: MA Zip Code: 01301 Telephone (Daytime): 413-772-8788 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: Interconnection@pvsquared.coop License number. A13764 Date of approval to install Facility granted by National Grid: 4.29.2019 Application ID number: 00221746/WR 28562742 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed (Local Electrical Wiring Inspector, or attach signed electrical inspection): Name (printed): Date: License#: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham, MA 2451 E-mail: distrib ted. eneration nationalgrid.com Massachusetts: http://www.nationalgridus.com/masselectric/lionie/energyef`f/distributed generation.asp Nantucket: http://www.nationaluidus.com/nantucket/hone/energyeff/distributed generation.asp Page 1 of 1