Loading...
32C-171 (25) 256 PLEASANT ST BP-2019-1177 GIs#, COMMONWEALTH OF MASSACHUSETTS Map:Block:32C- 171 r CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-1177 Project# JS-2019-001910 Est.Cost:8221992.00 Fee:$46700 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor., License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sa. ft.): 17119.08 Owner: LUMBERYARD NORTHAMPTON LIMITED PARTNERSHIP Zoning'CB(100 Applicant. PIONEER VALLEY PHOTOVOLTAICS AT: 256 PLEASANT ST Applicant Address: Phone., Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON:612412019 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL SOLAR ARRAY- 74.16 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: il: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Sianature: FeeType: Date Paid: Amount: Building 6/24/2019 0:00:00 5467.00 212 Main Street,Phone(413)587-1240,Fas:(413)587.1272 Louis Hasbrouck—Building Commissioner Wrsion1.7 Commercial Building Permit May 15,2000 Department use only REG Cl y of Northampton Status of Permit: Bu ding Department Curb Cut/Driveway Permit - APA 22 2019 12 Main Street Sewer/Septic Availability Room 100 Water/Well Availability DEN TMA',t,WDT r ta4PFCT'*brth pton, MA 01060 Two Sets of Structural Plans 7-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 6,04 1f/// 7,7 1.1 Property Address: This section to be completed by office 256 Pleasant Street Map I Lot Z/ Unit Northampton,MA 01060 Zone Overlay District L Elm at District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Retard: Lumber Yard L.P.,c/o Way Finders Inc. 120 Maple St. 4th Floor, Springfield,MA 01103 Name(Pdnl) Curenl Mailing Address: (413) 586-1000 Signature See Attachment A Telephone 2.2 Authorized Anent: PV Squared Solar 311 Wells St. Greenfield MA 01301 Name(Print) Current Mailing Address: . I/,,7(-v.A^'� ' (413) 772-9074 Signature t/ Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed bpermit applicant 1. Building $66,598.00 (a)Building Permit Fee 2. Electrical $155, —00', (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Perms Fee .f�( 7 4. Mechanical (HVAC) 5. Fire Protection S. Total= 1 +2+3+4+5 Check Number This Section For Official Use Only Building Permit Number Date Issued Signature: 6 /-Zy/i l Building Commissioner/Inspector of Buildings Date S15C CLsorrz#"i,C-. t{OGO- 3'66 FMA 1(, 6(gIj r7wL ti0alNlil(f 145 (sem £MniL� 5a uq � RF A PVSquared SolmI ~pvsquared.coop RECEIVED one.413-772-8788 sh eIcreeemaMd-MA0301 �'. ✓� MA Elm..Lic A137641 MA HIC 14Q�77 APR 2 2 2018 n7 Dear Town Inspections Offs ' "NO FTMAALDINGJSVECT1ONS MAD,,, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the Intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines,including electrical engineering, structural engineering,civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education.We make certain that every Individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, Including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30,2009 Massachusetts Board of State Examiners of Electricians(BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrlclan's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers,such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a Teaming organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Versionl.7 Commercial Building Permit May 15,2000 SECTION 4.CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing Change of Use❑ Other❑+ Brief Description the installation of a 74.16 kilowatt roof-mounted solar array Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 11A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A ❑ E Educational ❑ 28 ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑� I Institutional ❑ I-1 ❑ 1-2 ❑ 1-3 ❑ 3B M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑+ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(so 1e a 2"d 2nd 3p 3m 4m 4m Total Area(so Total Proposed New Construction(at) Total Height(0) Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public 0 Private ❑ I Zone Outside Flood Zone[] I Municipal 0 On site disposal system❑ Vefsionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This whims to be fillod in by Building ncpnrmmst Lot Siu ---._.- _._1 E_. Frontage Setbacks Front � Side L:1 RJ-- I L:F---I R:= Rest 7 0 Building Height Bldg.Square Footage - Open Space Foomge % _ (Int ares minus bids&paved 1 sinking) #of Puking Spaces Fill: volume&Locative —.---__----. —. A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter BookI Page and/or Document#, B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or Is it pan of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Version l.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE 9.1 Registered Architect: Not Applicable 0 Name(Registrant): L— Registration Number Aetlress Expiration Dale Signature Telephone 9.2 Registered Professional Engineer(s): L—_ - Name Area of Responsibility C Address Registration Number Signature Telephone Expiration Date Name Area of Reaponslbaty, Acidness Registration Number Si9nstun Telephone Expiration Date Name Area of Reaponsibsdy Acidness Registration Number Signature Telephone Expiration Date E Name Area of Responsibility C Address Registration Number Signature Telephone Expiration Data 9.3 General Contractor PV Squared Not Applicable ❑ Company Name: Daniel Gomez Responsible in Charge of Consouctlon 311 Wells Street,Suite B, Greenfield MA 01301 Address fhPAU,�, 1(413) 772-8788 Sigla4n Telephone Versionl.7 Commercial Building Permit May 15,2000 SECTION 10.STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes • No SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Lumber Yard limited Partnership as Owner of the subject property hereby authorize PV Squared !to act on my behalf,in all matters relative to work authorized by this building permit appllca0on. See Attachment A 04/18/2019 Signature of Owner Date I. PV Squared. __- - - -_ - --__-- -. _- ,as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Daniel Gomez Print Name / /kwtiu�/ ,04/18/2019 Signature of Owner/Agent Data SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Daniel Gomez Gonzalez ICS-11266 License Number 311 Wells Street, Suite B, Greenfield, MA 01301 03/14/2021 Address / Expiration Date / (413) 772-8788 Signature Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes O No 0 Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT 1 hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement.I hereby authorize Pioneer Valley PhotoVoltaks Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. �.-w4w '4 r,k Nwtln.ntppio6 Lim�trt� �+trossjrr W,- LJ mlp.r Y +1-11 22.S6 L-1-C., 1�Ra 6e m� P1Pctt b! 4..1 �J r rWAri,lAt ., ;h rr/y.i arninA rNteM6er 6� 1`c"7V� 1 � "k✓ Printed Name Oatel t. ^IPr 4,cd a>rHv.ffnn L1mta �er1"neriHip w.mjyr`lx,A YSb LIC. ik de%xJ &f-Aer k #'134&5rn3 N*.hber ' l�5 Ilk, 1 p _ } Signature Title C;7() k f I R,�,thvf�ud f VA;akwC gppm "AWx 000011153 Py 6o[Q W YWNrda "Mlk ' PrmeCip-reelwp24:015 _ Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Slandards COnstrUCtlOn Supervisor CS-111266 Eftpiri3s: 03!1412021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner - ._��r YCirriruriiriwirl� r� ��i,,idar�rii�/✓i Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type. Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP RegiBlralim: 140017 Expiration: 09/15/4019 GREENFIELD. 3n IE ST SUREe IELD.MA 01301 SG O wMn' UPEMe AEUrea arM Return Card. Pass of Consumer Arms a Business FyulNan HOME IMPROVEMENT CONTRACTOR RylattMlnn.wil wrinalyWwluae only TYPE:Sussel Can ae atPluunsi data "Mum return 1.. RnasNslbn Easirsaon OKIceol Consumer Afera and sunniness Rvossu.n 140071 09/158019 10 Perk Plus-Suite 51 TO PIONEER VALLEY PHOTOVOLTAICS COOP 9oalon.M 0 11fi i CHRISTOPHER KRE21NIIEN 011 WELLS ST SUITE GREENFIELD.MA 01301 UntlMsacretary Nd Valid WIthO t Ignature AC ao o® CERTIFICATE OF LIABILITY INSURANCE vzBnole THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: Ifthe certificate holder Is an ADDITIONAL INSURED,the polk:y(ks)must haw ADDITIONAL INSURED provisions or be endo ed. If SUBROGATION IS WAIVED,subject to the farms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer fights to the certificate holder In/leu of such elldorsoment(s). PROWLM cUNTA Linda Powe..CRIS WebberSGrinnell Pax' (413)SM-0111 FAX.,,, (013)6Md481 B Norm King StreetimneK; Fmmrs®webbemndgnnno1Lwm OUREP48WFpIMNp COyM E NNLF Northampton MA 01060 YKRERA: Ohio CaeUeXyll-ibedy 24070 Ixsuse0 MIww,: Chb SeculltylLftny 24082 Pioneer Velkay PhotoVollaks Coopeebw,Inc. EMalpl O. Contra lal lndsmnVAUW AIN:Om Pinkham a0•alBl o; 311 Wells Street Suite B NMwaR e; G.BnfieM MA 01301 COVERAGES CERTIFICATE NUMBER: Maear Expl-MW REVISION NUMBER: THIS IS TO CERTIFYTHATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TOTHE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSMAIDINGAN REQUIREMENT TERM OR CONDITION OFANY CONTRACTOR OTHER DOCUMENT WITH RESPECTTO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO AIL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. POLITR TYPE OF INSUIANCE PIXICY MIYKR MIAO�WYYW YMN EFF POLICY EMP YYIM EAµ. ppgµ�gE 3 1.000,000 CLAIMS-MADE ®OCCUR f 300.000NEDEXv f 6.000 AripBKS57072282 O/01Y1019 01/01/2020 PERebwLaAw IxJURY f 1,000,000 6FILACABEtLATE UMTAPPMES PER ,.,._RMAGCAEWTE E 2000,000 POLICY Elm ❑IAc PROd1CT6-COMPATPAtSD 5 2.000,000 OMM: E ANpYgyK��yM IN®seseenSINCAEUM E 1,000,000 ANAU O SOpILr INMNIPN PYLmI E B (ANSI) WON.Y BAS6T0T2282 01011ID19 0106020 aOpLYNuNr(Pw — i MIAMI) NONOWIFD Rlr p ADrOSON.Y AUTONOMY s11(ccA $lKwmp UMarineumd needs IN Is 300,000 uYMeLw Lw ETCH OCCURRENCE f CCCU0. 3.000,000 A EXCEM Lw C... 0805]0]2282 010114019 0101/1020 AOOREWlE s 3,000,1)(10 ocD NWIDON s S WORKERS COYPFASAIMM R M AND EMPLOYERSL AINKIT' YIN C PAOFBTONPARTNER1ECMIYE MIA WCRBDMYR 01A111101B 01/Bi/ZO20 E.L.EACH AGOOEN E 1.000.000 OF EW FxCLU, D 1000000 ma."'...) E.1 -FAEIYIOYEE E H'R.Oum°e u,qe, IAO0.OD0 °ESCnIPrpNOFOPEMTX}6 MY.v EL p8FA4E-IVICYIINT S Commercial Pmperly :ftm Pmysrly 51.750.000 A BKS5T0T228b ft 01011/019 0101!10201=:.tlon 550.1X10 Tnemporlation $15,000 KCRVTYIN V OPEAAIgXelLOC910YBI W9EUH MCOIm 1at.AdYaMvl RwMM SLM1FdM,mq bearMa Emwr Eqw IF YE�kPN WarkeM1 compeneabm rcAIMs Me.CT BM NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DEL WERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUMORUEO AEPRESENATI a Illi. ') V'-- C)19WM15 - ®1988-2015 ACORO CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are mgisWmd marks of ACORD The Commonwealth of Massachusetts Department of InduldnalAccidents I Congress Street, Suite 100 Boston,MA 0211 4-2 01 7 %,%,alma rs gov/dia TWorkers'Compensation Insurance Affidavit:Builders/Contractors/Eimtricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organiuti.,A dividual):Pioneer Valley PhotpVohaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, Suite B City/State/Zip:Greenfield MA 01301 Phone#:413.772-8788 Arc yea..employer?Chark Ike appropriate We: Type of project(required): 1.E! 1 un.employa with 48 imPloyee(to,,mtd/or Petrofina).' 7. ❑Near Construction 2.[:]1 am a wle pwp.ietorm Partnership and have no employees working for me in 8. Remodeling any cepsciry.fNowoheri comp.i.ce requitedj l.�lemamm�wwmmdoing ell woh mywlr[No workera'comp.imurana raquisd.lt 9. ❑Demolition I0 Q Building addition 0.n1ro a hot all contractors will behiring contractors workers'caconduct91suraceor property. (will estrus that all contnctore either have workers'compensation insurance m an,wk I L[]Electrical repairs or BddltlOn3 proprietors with no employee. 12.[]Plumbing repairs or additions 5.07 am agmsral connector and l have hired the sub-contracharebaed on theamched these. I3.�Roof! IIS These sub-contractors have employees and have workers'comp.insureace.t 6.[]We ans.h and we h tool its omcep have o worker their right orence manretained] per MGL c. 14.QOther Solar PV 152,41(0),tool we have no employee.[No workers'camp.immance sgtdsdJ Any applicant that checks has#1 must also fill out the section below showing their workers'comprnstion policy information. s Homeowners who submit this affidavit indicating they ere doing all work and then hire outside contractors most submit a new affidavit mit,,ing such. :C'ontracwrs that check this boa must attached an additional shed showing the name of the sub-contractors and sam whether or not those emhies have emplovees. If the sub-contractors have employees,they most provide their workers comppolicy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:SKS57072282 Expiration Date:01/01/2020 Job Site Address:256 Pleasant Street City/Stste/Zip:Northampton,MA 01080 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a time up to 51,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce e ndpenoldes ofleerjury that the information provided above is true and rorreca Simian Date:4/18/2019 Phone#:413-7 -87 8 Officialuse only. Do not write in this area,to be camp/efedby city or town oftwiat City or Town: Permh/Li e # Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/To"Clerk 4.Electrical Inspector 5.Plumbing inspector 6.Other Contact Person: Phone#: ao LUMBERYARD - NORTHAMPTON a rrrourded rarretanner t •.� cors- _ .. t _ - - h Eaenor AC utility % i.nnect S.ch k led p �- i rade level ecaeaeible tall bores by Ni ••� i �. r ain electrical room.grou •• ..!� .. i r,with 4 Inverters, w •�.:�: -�- i 1 avenue grade meter,AC mbiner,main distribution •\ "-1 `. ,{I L_ -----J anal with generator breaker �+�•'-� f� Y STREET ROeTE S i plU5GN1 Owner: Lumber Yard Limited Partnership c/o Way Finders, Inc Cont; Rudy Perkins, Project Manager/Attorney Phone: (413)233-1726 e-mail: rnerkins@haphousing.ore 2m: 256 Pleasant Street, Northampton, MA 01060 System Size : 74.16 kW DC/57.6 kW AC PV Array: (206)SPR-X22-360-COM as indicated in ► layout attached .Setbacks and roof access landings in line with safety requirements to provide proper roof access. Y4 Mountin Ecolibirum EcoFoot2+ ballasted tilt-up t racking. See attached datasheet. Roof Structure: Engineered Trusses. PV Array has been reviewed and approved by structural engineer-of-record—see attached PE Letter. Roofing Material: TPO membrane. ® 265 liMme:tree4l hind Floor Waltham, assadwseRs 02451 Telepphone:(617)92641100 Email:s atrueQso ftw.cum A.LOUDERBACK, PE ERRY SOUZA, TRUE T)EROME A YURKOSKI,PE AND PARTNERS, INC. LISA A.BOHLIN, PE STRUCTURAL ENGINEERS TODD P. BLAKE, PE January 8, 2019 Davis Square Architects, Inc. 240A Elm Street Somerville, MA 02144 Attention: Mr. Cliff Boehmer, AIA Reference: Northampton Lumber Yard—Roof Capacity for PV Arrays 256 Pleasant Street Northampton, Massachusetts Dear Mr. Boehmer: Souza, True & Partners, Inc. (ST&P) is the structural engineer-of-record for the new construction of the Northampton Lumber Yard Apartments project located at the above- referenced address is Northampton, Massachusetts. As requested, we have reviewed the design and construction of the recently completed roof framing system of the residential structure to determine if it is capable of supporting additional loads from a proposed PV array system. The proposed PV arrays are defined on a drawing prepared by Ecolibrium Solar of Athens, Ohio dated August 8' , 2018. The maximum equivalent distributed load of the PV array system is specified as 6.71 pounds per square-foot on this drawing. The recently completed roof structure is constructed of pre-fabricated wood roof trusses supported on conventionally framed wood stud bearing walls. The as-bui8 roof trusses are generally spaced at roughly 24" on centers and are approximately 20" deep. The roof trusses typically spanning between 20 feet and 32 feet, but the span is 24 feet typically in the areas of the proposed PV arrays. Based on our review, we have determined that the recently completed roof framing in the area where new PV arrays are proposed is capable of supporting the additional loads from the new PV arrays without the need for structural reinforcement Sincerely, IQF SOUZA, TRUE AND PARTNERS, INC., + �: JEROME A. a MURK 6 SR TR v No.368536852 Jerome Yurkoski, P.E. Senior Principal www.souzatrue.com FOUNDED IN 1959 BY RICHARD W. SOUZA AND EDWARD K. TRUE Point Load Characteristics Northampton Lumberyard, MA 01060 EcolibriumSolar Date:8/3/2018 Subject: Point load characteristics of the proposed photovoltaic array The tables below show the point loads for each category of point load EcoFoot2+Array-Component Weights Component Weight(lbs) EF2+ Base 4.04 Universal Clamp and Clevis Pin 0.49 Wind Deflector 6 Ballast Block 32 Panel 41 Point Loads at Bases Throughout Arrays Category of Base M of Ballasts on Tray Weight(lbs) Corner Base- High Tower Connected 1 50 to Panel 2 82 Corner Base-Low Tower Connected 1 47 to Panel 2 79 1 64 North Edge Base- High Tower 2 96 Connected to Two Panels 3 128 1 58 South Edge Base- Low Tower Connected to Two Panels 2 90 3 122 East or West Edge Base- Low& High 1 61 Tower Each Connected to One Panel 2 93 Interior Base 1 85 2 117 507 Richland Ave,Suite 207,Athens,OH 45701 1 ecolibriumsolaccom 1 740-249-1877 SunPoommercial Solar . 1 • HeliXTM Roof Compatible Modules High Performance & Exc lnt Reliability Factory-installed clips enable tool-free panel installation,decreasing installation time and j( minimizing business disruption.' SERIES More than 22% Efficiency Captures more sunlight and generates more power than conventional panels. Maximum Performance Designed to perform in demanding real-world conditions of high temperatures,partial shade SPR-.223rD COM from overhead wires,and low llght'AS c Highest Efficiency Commercial Grade Generate more energy per square foot Intended for commercial sites where maximum X-Series commercial panels convert more sunlight to electricity by producing energy production is critical. 38%more power per pane12 and 70%more energy per square foot over 25 years.13A Highest Energy Production' Produce more energy per rated watt More energy to power your operations.High year-one performance delivers 8-10%more energy per rated wattaThis advantage increases over time, producing 21%more energy over the first 25 years to meet your needs! Maxeon°War Cells Fundamentzlty Getter a i2o% 21% Eneretl glnefor pertormance,beaigned for reliability. ;' MPer ILrerVererneree IIOM E 'm% Engineered for Peace of Mind $ ,d% 1 %e_ Designed to deliver consistent trouble-free gj m% � a energy over a very long lifetime,0 O% Designed for Reliability a. n 1° 11 :° II The SunFrower Maxeon Solar Cell is the only cell built on a solid copper foundation.virtually 1a. mamam Hlah impervious to the corrosion and cracking that e% Pei elgh Tempa degrade conventional panels.' s bbae`r'Wamuo'Jfe° a X.gh x"enge WM[i Same excellent durability as E-Series panels. #1 Rank In Fraunhofer durability test.' peam P`% Bene,tip,lamane on 100%power maintained in Atlas 25r 2% Hlan.veao<,rdn. aid. fiernal Glass comprehensive durability test." o% _ '•werr X -oi—nerdal Solar ' • 1 • Power Warranty Product Warranty 1. o leedia, o s 1P is zo xs More guaranteed power 95%for first 5 years, Combined Power and Product defect 25-year coverage" —0. all to year 25 a SPIV 360 COM Standard Tests" UL1703(type 2 Hre Rai IEC 61215,IEC 61730 Homs nal Power(Pnomp' 360W QualityCens 1509001:2008,150140012004 Powertolerance, +5/3% EHSCompllance ROHS,0HS/5111IX11:2007,lead free,REACH Aye.Panel Efficiency' 22.2% SVHC-163,PV Cyche Rated Voltage siffil 59.1 V Ammonla Test IEC 62716 Rated Current 0m ) 6.09A Desert Test 10.1109/PVSC.2013.6744437 Open-Circuit Voltage Noq 69.5 V Salt Spray Teo IEC 61701 maximum server ) Short-Circuit Current fisc) 6.48A PID Test Potential Induced Degradation free:1000 Vto Max.System Voltage 1000 V UL 81000 V IEC Available ListingsUL TW, .CEC Maximum Series Fuse 15A Power Tem COef. -0.29%/°C Volt eTem Coe(. -167.4 mV/°C Temerasure -4C7 0'Fto a18V F(-,10*Cto 185° Curcent Tem Coef. 294 mV/ ImpactResistance Iinch(25 mm)diameter hail at 52mph(23 m/s) ApIpseareence Class REFERENCES. Solar Cells 96 Monachistailline,Widen Gen 111 Hdxcargariole Imatas nuyml he empal MlhmlrmarWa Wssm¢ ]Nmmparepr¢are SPRx313a5riarepesmalM cmernmal pond:250.,thermal bre. Tempered Glass Hi -MaMmI55iM tem red anti-reflective 153%eMCeoy junction Box IP 65,TE PV45) 3 Tyeally iii more erergylerwly BEWNlwEnflusenr,,riwever riela Report'1an 2013. Wel ht 41 los(18.fi a Suix.'025W,degxNmn ss.I Derry,mm.morel.Campeau 2.it.1 SUMonx MOWk kZ oegmdammst Rate:sunPmer etae paper.Sell M13.pmean He SunPorer men Report.•ell Wed.SD ps(2400 Pa 244 kgomlzfrar%B bark or.1, Max Load Snow:112 pdr,5400 Pa 550 Offirriez front s-SunPonemmmrne He Year useful We SunPwrer erre paper,May 2015.useful Yfe is 99 an of Frame Class 2 silver anodized:stacking Ins 1 Cogelsoperatlrgai nyxevner] orramex —or 6 Highest of oxer 3310 sa[an soar pyM;Rwan AbaE S nee,Feb 2014 71%mqe enter than f Shen,PainPL[el6 one erarg/than do,average of an,top la lWel - ISets 61.6120 � rnnplenly,amen m 20121151 paree,IM corrparriesl Pham lmhenatdvl tell 2013. 1R6Rmm16tAp1-- FRAME PROFILE B contained wTh the lop 15 manne.ners,Sunew,er Wei Reval May X115 95o eresYrreemarepexdrypnsmryaFgy Seewamranly(p eeWh. { Pines in 21 aEhC.x,A tap BpsM nawessid,l her MA.3,Pan (aeh n 201<.rmturn C.tt N.'kaunfMem W WradFry Inluaee Ip kNr Wali Pan Y. Phoerrvoi 11 mmmparm Stn the fun:me::-te:rw anmvmnl panel.xsemie:same az E xrlex lezlea In alas 1S.WnWly Less mrynb FM 2m3 dC as 12 5rnrrMrd Tess cmaNpmu 0000 w/m'amaaay.Ma 1%25'c1.1AEL aaWaoon suMae. -ME 3 SOMSmore,FFaee. . / JI piswfinii 1on aversmeasured powvalues eunngpoe7l4 Tel fire ratexperULl]03]m3.Creas Cfire mining r UL1o3'Xg2 Ws'm'ryerna aoaaamm 1poemr.elRmlwm'nn°en.%^ Its.]INW Please read the suety am industrial gcol clips Installed on Helix pool rompallde modules only. Clips are not removable and may Her be Shensi Win rear Helix branced mocking See vmw.sutroxer mnJlaus for more reference lniormaron. her more Mialls,see extended Wsehoxt wxrv.zuryw.ercmn/earsshehx Wcmnent x 51 W38 Rex C'iR_US EcoFoot2+ hack in black PV installation Professionals use EcoFoot2+ to complete their projects in record time. The refreshed EcoFoot2+ design is now available in Black, along with a comprehensive UL2703 certification. J Base Preassembled Universal Clamp Wind Deflector Our new UL-Listed ASA based The new preassembled universal Corrosion-resistant wind resin is a durable material commonly clamp achieves integrated grounding deflector on every module helps used in automotive and construction without the use of grounding washers. minimize uplik,reduce ballast applications.The material is requirements and carries UL2703 class A fire rated as part of validated ground path from our UL2703 Certification. modules and racking components. 507 Richland Avenue, Athens, OH 45701 740-249-1877 1 www.ecolibriumsolarcom Our design enhancements help you master the most challenging site and rooftop conditions .If System Ben Low part count Rapid system deployment ount . - . Universal Clamp Increased design ballastMore p Simplified logistics :. per Validation modules— Certified to UL2703 Fire Class A for Type I and 11 — Certified to UL2703 Grounding and Bonding — Wind tunnel tested to 150mph SEACC seismic compliant and structurally tested DNV GL rated at 13.5 panels per SpeciRcations Dimensions: 26.5L x 1825"W x 8.3-H Module inter-row spacing: 89" Typical System Weight 3.5-6 lbs. per sq. ft. Roof pitch: 0° to 7° Module orientation: Landscape/Portrait Ballast requirements: 4" x 8" x 16' Tilt angle: Landscape 10°/Portrait 5° Warranty: 25 years 507 Richland Avenue,Athens, OH 45701 1 740-249-1877 1 www.ecoiibriumsolar.com Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §53 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Eouioment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall,hang plywood o Stickers • Interconnection o Stickers • Monitoring o Will options o Any"plug and play'devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Mist o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities CRY Aa10 1of Louis Hasbrouck<Iasbrouck@northamptonma.gov> 256 Pleasant St 1 message Louis Hasbrouck<Hasbrouck@northamptonma.gov> Thu, Apr 25, 2019 at 6:49 PM To: Daniel Gomez<danielg@pvsquared.coop> Cc: Kevin Ross<kmss@northamptonma.gov>, Laura Baker<lb@valleycdc.com>, Kim Carson <kcarson@northamptonma.gov> Daniel, The permit set plans for 256 Pleasant St don't show a solar PV system.You've provided an engineering review but we'll need more complete plans,including approval by the project architect, before we can issue the permit. Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413)587-1240 office (413)587-1272 fax igiviv of Louis Hasbrouck<lha;omuck@northamptonma.gov> 256 Pleasant St solar 1 message Louis Hasbrouck<Ihesbmuck@inorthampsxnma.gov> Mu,May 3D 2019 at 10:31 AM To.D end Vreeland�dweeland@vedxon.neh Cc:Kevin Ross<kmss@northamptonme.gov> Dara. Here's a copy of the permit application for sdar on the building at 2%pleasant St.We asked for construction control because We a large building,theyre ballasted (heavy)retia,and We a fairly large army.We want plans:something more than we got with the application. I've got a full set of building plans,and none of them show or rear to solar.I'm not very worded about the structure,but we need to sea at least a line dmaxng and ,mummers spur for the electrical. Let me know a you want copies of the plans;mey'm too big to email but I could probably pull out the sWduml and electical pages. Louis Hasbrouck gaining Commissioner City of Nprlbamplon Town of W llumsbmg (413)587-1240 once (413)587-1272 fax ON-f Louis Hasbrouck<meaUrvuck@nonhamptonnei Re: 256 Pleasant St, Northampton •Constmetion Control for solar installation 1 message Lauth Hasbrouck<IlrasbrburF@northamVtonme gov> Thu,May 30.2019 st 10:08 AM To Might Gates<miirag@pvsquared.coop> C.:Kevin Rasa<kmss@northamptonma.9ovs,David Vreelend<dvhmsmd@verizon,m1s Plans.I'm sure you have them.Sena them electronically. Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413)687-1240 office (4131887-1272 fax On Thu.May 30.2019 at 9:47 AM Mims Gates<miirag@pvsquared.coi wrote: Hi Lous. Dave Vreeland,of Vreeland Design Associates,will be providing construction control for Me solar Installation at 256 Pleasant Sl.Narthampon.I've attached to this email the construction conbol document with his signature.He preferred to use Me state Women rersua the version that was available on the City of Northampton website.Once Me Lumber Yam team has their Cedlficete of December,I think we how have,everylhitg in order for our miss,peeril Please tat me know 8 you now have everyMing you treed to iawe the With,pared once the CO is issued. Many thanks, Miire ll Gates I m_irag@pv,umacl goo, PV Squared I www.pvequered.p0pp 311 Wells Street,She.B I Greenfield,MA 01301 Office:413-772-87813 x.1281 Fax:4137724668 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Ulf Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Northampton Lumber Yazd Date:5/29/19 Property Address: 256 Pleasant Street,Northampton,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:I will be providing Construction Control for the installation of 101 PV solar panels on the flat roof of the newly constructed residential development The solar panels will be secured to a ballasted rack assembly on the flat roof of the development I will also provide guidance on the placement and load limits for craning materials and equipment onto the roof. I, David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical X Other.Construction Control for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Control Document'. OF Enter in the space to the right a"wet"or t4,'��a electronic signature and seal: $ DAVIDA. a 3 VREEUND Y� u CIVIL No.48317 FOI TEP Phone number.413-6240126 Email:dwr land@verimn.net Building Official Use Only Building Official Name Pecanit NO, Date: Version 01_01_2018