Loading...
31A-006 (3) 9 MASSASOIT ST BP-2019-1366 GIS a: COMMONWEALTH OF MASSACHUSETTS Mamillock:31 A-006 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildit DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Cateeory: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit a BP-2019-1366 Project# JS-2019-002197 Est.Cost:$21158.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor. License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sa.fn: 6011.28 Owner: JOHNSON KENNETH Zoning:URB(I00V Applicant. PIONEER VALLEY PHOTOVOLTAICS AT. 9 MASSASOIT ST Applicant Address: Phone., Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation - GREENFIELDMA01301 ISSUED ON:611712019 0:00:00 TO PERFORM THE FOLLOWING WORK:ROOF MOUNTED SOLAR, 11 MODULES, 3.8 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House a Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occuoancv signature: FeeTvpe: Date Paid: Amount: Building 6/17/20190:00:00 $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner Department use only City 0t 011 Ell V E D ISer/Septic e of Permit: BUi". De artment Cut/Driveway Permit 212 yin StnWAY 2 9 2019 AvailabilityOm00 rNvell AvailabiliNOrtha ptOn 0 Sets of Structural Plans phone 413-587- 2418 g*M-0.oPT TIONS ite Plans 0 NISped y APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION �j /'.. 1.1 Property Address Thls secfion tb bye4i by office Map _ Lot r) G Unit 9 MASSASOIT ST NORTHAMPTON, MA Zone Overlay District Elm SL District CB District SECTION 2.PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Ken Johnson 9 Massasoit St.Northampton,MA Name(Print) Current Meileg Address: 413-5864684 See Attachment A Telephone Slgnai 2.2 Authorized Anent: Pioneer Valley Photovoltaics 311 Wells St.Greenfield,MA 01301 Name(Ppm) Curren g Ad Mailindress: /7 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed bpermit applicant 1. Building $6,347 (a)Building Permit Fee 2. Electrical $14,810 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit I" 1/�C 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) $21,158 Check Number ovl This Section For Official Use Only Date Building Permit Num r Issued'. Signature: Building Commissioner/Inspector of Buildings Date buildingpermits @ pvsquared.coop EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING ALL Information Mus[Be Completed. Permlt Can Be Denled Due To Incomplete Information Existing Proposed Required by Zoning Thu vAm wbe filled in by Building Dcpa u Lot Sin Frontage Setbacks Front Side L:t_- 1 RJ LL— R:-- Beau- Building :RearBuilding Height O Bldg.Square Footage ==F/ F -I Open Space Footage (W area minus brig&paved padd-9) #ofParking Sperces ...._. I Fill: volw�e&lacarim A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Body Page, and/or Document#F-- B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 7 acre or is it pan of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Perms from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteratlon(s) ❑ Roofing ❑ Or Doors [: Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [p Siding[M] OMer[m] Brief Description of Proposed Insrallnlon ofvcking syum for solar PV Work: Alteration of existing bedroom_Yes x No Adding new bedroom Yes x No Attached Narrative Renovating unfinished basement _Yes x No Plans Attached Roll -Sheet ea. If New house and or addition to existing housing, complete the following: a. Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is them a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction 1. Is construction within 100 R.of wetlands?_Yes _No. Is construction within 1 D yr. floodplain_Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank_ City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Ken Johnson as Owner of the subjed property PV Squared (Pioneer Valley Photovoltaics) hereby authorize to ad on my behalf, in all matters relative to work authorized by this building permit application. See Attachment A See Attachment A Signature of Owner Date PV Squared as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Bill Killough-Hill Prins Name Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Hold.. Daniel Gomez Gonzalez License Number CS-111266 Address Expiration Data 03/14/2021 Signelue ,( Telephone / 413-772-8788 S._Raolatered Home Imorovement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 140077 Address Expiration Date 413-772-8788 Telephone 09/15/2019 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C.152,$26C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ City of Northampton s , +"/� .•I [QaB eachu9ette was O4( ` DNPAR==r OF BUILDING INBPNM'IONB ;y YS] Win St—t Wvlclpel Building � `C Mor'hCEamp[ou, W 01060 Ian a Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 9 Massasoit St. Northampton, MA (Please print house number and street name) Is to be disposed of at: PV Squared dumpster at 319 Wells St. Greenfield, MA (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) Signature of Permit Applicant or Owner Date If, for any reason, the debris will not be disposed of as indicated,the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. Attachment A AUTHORISATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract Pnce aocarding to the Terms of Payment I further agree to the Terms and Conditions attached hereto as a pan:of this Proposal and Agreement I hereby authorize Pioneer Valley PhotoVommcs Cooperative to proceed with the abov referenced Project in a,00rdance with this Agreement I further authorize Ploneer Valley PhotoVolteim Coopeative, or Its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment Is endosed and 1 am returning this Agreement within 21 days of the Proposal date. {LEN JoHNSk� i 30-19 Zk Date pNuM, Signalu Title Printed Name Date signature Title vrapoeoiem Apnumaaapal3xbx Pagesorlx Pap.Imman-awery ao,rola The Common wealth ofMassaehttseMs Department of7ndustrial Accidents 1 Congress Street,Suite 100 Boston,MA 02114-2017 wskm:mass.gosVdia VIV.rkers'Compenshation Insurance Affidavit:Builders/ContraMors/Eleetricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Orgmimtior✓lndividua0:Pioneer Valley PhotoVoltales Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street,SUMS City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Arasan:employer eaeek me appropriate hoc Type of project(required): 1.2]l sone smiley.with 4B employees(fid]andi/0"o-time).• 7. ❑New construction 2.❑lemamle propnetormperawrshipand lmv<no employem workivg fmmem 8. ❑Remodeling my capaity.[No workers'comp.insmance «cussed.] 3.❑l amahomeo ,doing all work myself lNo workers'eann.inmmnce requseed.]s 9. ❑Demolition 4.❑1 am a Iwanowmar mad will be lame,connacmrs an conduct ill work on my property. I will 10❑Building addition me wtan worm.eimer ha.o workers''compemalion inmunce or are so In 1 L❑Electrical repairs or additions psopriemn with no employes. 12.❑Plumbing repairs or additions 30 1 em a gawml c:vacta was l pave M1s an the a workers mra con,localonthe:ached ehcea. Theca sub-convenors have employees and have workers'comp.irnwaae.r 13.❑Roof repairs 6.❑We am acorpaatiov and is omcashave exercised their right ofexempion per MGL c. 14.❑! O[her Solar PV 152,g 116),:d we hive no employees.[No workers comp,imamate required] *Ay=111 checks box#I mudidatfilloutthesatiun below showing meirworkers'wmpenmtion policy int ation. t Nomawvem who submit this affidavit indicating they ue doing all work and sued Ione oulide contractors muss submit a new affidavit indicating such. lComme"that check this box must attached an additional shat mowing me name of the subconhacmw andstate whole or ws mase entities lave employees. Ifthe suhconaacmrs have employes,they mons provide weir workers'comp.policy number. I am an employer that le providing workers'compensation insurance for my employees Below is the policy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lia M BKS57072282 Expiration Date:01101/2020 Job Site Address:B Massasoit St. City/State/Zip:Northampton, MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,$25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce t e nd penalties of perjury that the inform adon provided above is nue and correct Si ata - Date 5/2112019 pitting,#:413-7 -87 8 Oficial use only. Do not write in this area,to be completed by city or town dotal. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Towns Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: PROJECT INFORMATION: /N SQU4q • Owner. Peg&Ken Johnson -(--}-f a ^,fid • Address: 9 Massasoit Street 444// `• —•f Northampton,MA 01060 •, • .� • Phone: (413)586-4684 (413)250-8749 vvsy�.,me.Na 311 Welk Sve 5utte0 GreMW,MA 01301 • Email: ken.johnson@hs.utc.com 1 aeygnappnsgN+«amep pegry@comcast.net ® .1a.mrrze • System Size: 3.96 kW DC-STC 100. Johnson iArray • Modules: SunPower SPR-X22-360 SITE: 9M.. .s sweet • Rail: Ironridge XR100 NoMan m.WA 01M • Bases: Ecofasten Quikfoot • 0.FASpNS: Snow Load: 40 lbs; 1. ce,ma.Ny«Me«a on «Hers Wretlucec kjlry . • Wind Speed: 117 mph Center Array ROOF STRUCTURE: East Array 45"2"x 4-3/4"full rafters @ 24"O.C. ROOF MATERIAL: A xos«e Asphalt shingles PROJECT NOTES: 1. Framing location to be verified on site. 2. Slide rail assembly as needed to avoid Part Make/Model Qty- interfering with splices or bases. Base Ecofasten Quikfoot 28 3. Unless otherwise noted bases are staggered Flashing Ecofasten Quikfoot 28 and spaced not more than 48"O.C. L-Foot,Black Ecofasten SCL-101-3 28 E. Site Plan 4. Additional or alternative bases may be used Fastener GRK RSS 5/16"X 3-1/8" 56 to meet actual roof conditions. Sealant Geocel 2 14'XR100 Rail,Black Ironridge XR-100-1686 5 FON.: 4210 17'XR100 Rail,Black Ironridge XR-100-204B 2 BY w Rail Clamp,Black Ironridge UFO-CL-01-B1 32 Orre. v13rz019 Rail Stopper,Black,46mmIronridge UFO-STP-46MM-B 20 S E: Nam Rall Cap Ironridge XR-100-CAP 10 ALE: 61/1x11• Optimizer Bolt Ilronridge MI-BNW 11 PV-01 B Mechanical Balance of System(MBOS) 611eet 1 Of 21 I - +f -177"to chimney ,M- 16" SQU4q -}— Array 124a/e" —a` r 2" x 43/4"full 41 126N" = +� • ao. rafters @ 24"O.C. ry symrm solar throughout N '� 311 WtlB$Vee"—e - - - GreeMeld MA 01301 Q 4(3-males 1 i 1t Alv li(46mm) loe: Johnson $IIII o 0 416" $m: 9MMSMOX S. Nw .mm,MA 01060 WC 1(-1 _ X22-360 Dimensions FJVKKWdal.bay remerea on neersmreMa unMaer. ry W F Eastern Array Rush with Ridge it and centered on skylights. Array 122%" �- Roof-143" ,f Roof-264" Central Array pushed to Southern gable and roughly centered on rafters #— Array 82 " to minimize cantilever. A East&Central Array Layout Array Layout RAIL SPECIFICATIONS a= ( R17 -84 wxr 13319 Make&Model: Ironridge XR100 ; W Clamp Torque: 80 ln4bs `o L-Foot Torque: 250 in-lbs s0 oA'r' s'019 Max Span: 79" a p Xy sin 3nn.X11. Max Cantilever. 26" '(`X� slz6: s1rz•x 1r MODULE ake&.M del: CATIONS: y PV-02 Make&Model: SunPower SPR•X22-360LLL Western arra roughly �+V Clamp Range: 2"to 16'on all sidesWiest Anay Layout centered on rafters. Module Size: 61-5/16"x41-3/16"x 1-13/16"(46mm) `J 6'=+'a' (Sheet 2fn New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.mgg@Ne nglanGConslmdionEngineering.cam May 8,2019 Mr. Bill Killough-Hill Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re:Johnson residence, Northampton, MA PV Squared Project No. 12218 - N ECE Project No.19-001 T30 Dear Mr. Killough-Hill, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared) provided on the roof and supporting structure of the Johnson residence at 9 Massasoit Street, in Northampton, MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV)array.The information that you provided is attached to this letter for reference. The house is a two-story Victorian with an unfinished attic and gable roofs with intersect with valleys. The roof is supported by full sawn 2x5 rafters at 24"O.C.These rafters span a maximum of 7'-6"on the horizontal.The roof pitch is 45-degrees. One intersecting roof is framed over the other to form the valleys.The roof deck is solid board sheathing and plywood. The roof has asphalt shingles. NECE's analysis of the existing structure considered the controlling roof gravity load combination(live load and snow load). Lateral loads(wind and seismic)are excluded from this report. Conclusion: Based on the information that you have provided, I conclude that,the roof will adequately support design loads and your proposed PV array. I base this opinion on the following assumptions. I assume that owing to their smooth surface,the proposed PV panels will shed snow more readily that the existing asphalt shingles. I further assume that the proposed PV panels will be installed parallel to the existing roof,eliminating any additional wind load.The New England Construction Engineering, PLC PV Squared-Johnson Residence Jonathan Rugg, P.E. Northampton. MA Page 2 of 2 ground snow load (Pg)for Northampton is 40psf. Based on information you have provided on similar projects; I assume that the PV panels weigh approximately 2.3 psf. In summary, in my opinion,and predicated upon the assumptions stated herein, the roof will adequately support your proposed roof mounted PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. Sincerely, ��pxorwT� �Q�- JO TH M A Yn / W. xs S x . vn: r, Jonathan Rugg, P.E. New England Construction Engineering, PLC. 19 Attachments: -Building information Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration 140077 311 WELLS ST SUITE B Expiration: 09!1512019 GREENFIELD. MA 01301 Update Address and Return Caro. office of Consumer Affalra 8 amino5s RegWauan HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Suooktment Caro before the expiration date. If found return to: Registration EmindIon Office of Consumer Affairs and Business Regulation 140077 09115/2019 10 Park Plaza- Suite 5170 PIONEER VALLEY PHOTOVOLTAICS COOP Boston.M 0 116 V CHRISTOPHER KREZMIEN 31' WELLS ST SUITE 8 GPEENFIELC. MA 01301 Undersecretary N t valid withotit sranature Commonwealth of Massachusetts ®� Division of Professional Licensure Board of Building Regulations and Standards Con st ructioo'Supe ry i sor CS-111266 Expires: 03/1412021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner v/""� ACORba CERTIFICATE OF LIABILITY INSURANCE DATEBIIADpnYm 16.11111.— 1 2na zeta THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,E1(TEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT. H Me cart icate holder is an ADDITIONAL INSURED,Me pollcy(lea)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,..i to the terms and conditions of Me policy,cenaln policies may require an endoreement. A statement on MIB certificate does not confer rights to Me cert10wte holder In lieu Of such endonshomm s). PRODUCER NAME: Linda Powers,CRIS Webber&Grinnell SONE (413)586-0111 I FAX W: (413)5866481 8 Norm King Stroet AoeRE99: IMoviers®webberaMgrinnell Com INSUREADH AFFORDING COVERABE Nape Northampton MA 01060 INBURERA: Ohio C.GeOftylitelty 240ret INSURED INSURER.: Ohio Sedurltyl itoony 24002 Pioneer Valley MotoVWMlos CooPeretive,Ind. INSURER L: Continental Indemnity/i Audi Kim PlnMlem INSURER D: 311 Wells Street,Suit B IXWREA E: Greenteld MA 01301 INNRM F: COVERAGES CERTIFICATE NUMBER: Masts'Pxp t-2020 REVISION NUMBER: THIS IS TO CERTIFYTHAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTOTHE INSURED NAMEDABOVE FORME POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECTTO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL ME TERMS, EXCLUSIONSAND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MY HAVE BEEN REDUCED BY PAID CLAIMS. INE0. TYPE OF INNRWICE Ms. MAND P ICYNUMMR 1A9pIYYYY — RAMITIS COYMERCML°ENEMLMBIUW MIAOCCURRENCE f 1.01)(D.000 Ofee MRpE ®OCCUR PREMISE. Eaawnua f '� MEDEXP 3 Som A. BK35]0]2282 011012019 olffid 2 PERSONALa ADOWILRY 3 1.000.000 GENLAOOREGiIELIMITAPPLIEBPEIt GENEMLAG°REGATE f 2,000,000 POKY ElJPEcTT F-1 LCC PRODUCTS-COMPAPAGG S 2.000,M) or'EN f AUTOMMILEMBIUW YMINEDSI ELMIT $ 1000 QCG X ANYAVT BCOILYINURY(Pxpalem) $ B OWNED SCHEDULED BABS]Q12282 D1101/1019 Q1/D11202Q BCOILYINURY(Pxa Helq $ AUIOSONLY AUTOS X HIRED NON-OWNED PROGRENOYCAMIME S AUTOS ONLY AUTOSONLY )( E1KW E11(comp Uddimmuredn .tM 3 300,000 x UMBREUA WB aCON FJLCHOCCI.RNENCE a 3'000,000 A EXCESS LIAR CUIENti USD5]QT22a2 Q1ID112D19 01/0112020 AGGREGATE 3 31000.000 DED RETE.C.a s WpR MS COMPENSATION PER OTRW AND EMPLOYERS'LIA NUTY AXYP�PPJETOIUPARTNERE%ELIITNE YIN E.LEACHACODEM f 1'�•� C OFFCEWLEWIPAICLUOEOi O III WO/TBD/T'(YR 01101,2019 QtIQ112Q2Q MM Xeensi El OBEASE-EAEMPUHEE f 1'atmom Ir arced Uaam I'mig 00 CEBCPoPTpN OF OPERATIONS tNn E.LpSEPSE-POICYLIMM 3 Commenclal PropeM Business Pere Property $1.7W.WO A BKS510]229211i 011012019 0110112020 Installation E50.000 Tmnsponatlon $15.000 DESCRIPTION OF OPEMTKaS I LOCATIONS IMBECLES(ADOND 101.A ftoM RMMNS UTA ME,aF XMhW N mon some Is lapulradl Workers comoensetion nciudes Me,CT,est NY CERTIFICATE HOLDER CANCELLATION SHOULDANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF.NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTN°RMED REPRESENTATIVE AL O 193&3015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD nems and logo ala re9Mered mart of ACORD �L\ The Commonwealth ofMassachusefis Department oflnduslrial Accidents 1 Congress Street,Suite 100 Boston,MA 02114-2017 www.fnass.gov/dia Wil.arkers'Compensation Insurance Affidavit:Bu0ders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leeibly Name(Business/OrganizatioNlndividuaq:Pioneer Valley PhotoVdtaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street,SuheB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are yon an employer?Check me appeaprhte hoe: Type of project(required): I.O l we employes with 4B employees(Nll aad/m pert-wrc).e 7. []New construction z.❑Iamesole preprietm or farmaship avd hevememplorea working freeiv g. ❑Remodeling any capacity.[No workai comp.insumnee required] 3.❑I an a homeowmr doing all work myself[No workers'cam,insumnw requhed.]t 9. El Demolition 4.❑I m a Iwaeowver mW wnl be hvinB wnwcrors m conduct VI work on my popery. I will 10❑Building addition gimme nut all correctors either have workam'wmpensation montane or ere sole 11.❑Electrical repairs or additions proprietors with w employees. 12. Plumbing repairs or additions 5.❑I ane gavelwvhectarIhave hiran theseb-wnwmorslistedwthe ennchvlsbev. nese wm havee esub-caactomDloyecs and have workers'comp.insurance: 13.❑Roofrepairs 6.❑We are a eoryomtion and re omwm have exercised thelrright ofowoupdov per MGL c. 14.❑7 Other 152,§I(4),end wehave w employsas[No workers'comp.immavwsequir d.] 'any applicant flair checks box#1 must alw fill am the saeon below showingtheir workers'com,somatiav policy informavov. r Homeowvvs who submit thu amdnvit vMicativg iheY are doing ell wosk andNw M1ire outside wntmcmrs mus s,danit a new eRWnvit mdicmmg aucM1. mploycmrs Wtcheckon boxmustettrnploeeeddiaoval sheetide lbeg therams ower, ealconvectors aM strtewhether or not Nase rntiries Imre emplryws. If the wbsonhagors have employees,they mus[provide their workers'wrap.policy number. I"an employer that is providing workers'compensation insurance for no employees. Below is the policy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Egpimtion Date:01/01/2020 Job Site Address:9 Massasoit St. Cit,/Stetdyip:Northampton,MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL a 152,§25A is a criminal violation punishable by a fine up in$1,500.00 and/or one-year imprisonment,as well Its civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce r t e ai s e d peaaldes ofp erjury that the information providedabove is true and correct Si mu . - Date:5/21/2019 Phone#:413-7 -87 8 Official use only. Do notwrite in this area,to be completed by city or town off7eld City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4,Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Residential . . 0 More than 22% Efficiency High Performance & Excellent Durability Ideal for roofs where space is at a premium or where future expansion might be needed. X Maximum Performance SERIES Designed to deliver the most energy In demanding real-world conditions,in partial shade and hot rooftop temperatures."' Premier Technology Engineered with the newest and most powerful spa X22 360 Maxeon technology,X-Series brings unmatched power and performance to your home. Highest Efficiency' Generate more energy per square foot X-Series residential panels convert more sunlight to electricity by producing 38%more power per panel'and 70%more energy per square foot over 25 years."' WOO Highest Energy Production' Produce more energy per rated watt Maxeore solar cells:Fundamentally better High year-one performance delivers 8-10%more energy per rated watt.' Engineered for pardsorance de:isred for durab'uiry. Th is advantage increases over time,producing 21%more energy over the first 25 years to meet your needs.' Engineered for Peace of Mind Designed to deliver consistent,trouble-free e 21% energy over a very long lifetime.34 �'.�w ioax Designed for Durability The SunPower Masson Solar Cell lsthe onlycell a builton a solid copper foundation,Virtually 7 0IL% impervioustothe corrosion and crackingtha[ wa degrade conventional panels.-` o s m 11 io Same excellent durabilityas E-Series panels. .: #1 Rankin Fraunhofer durability tests . 100%power maintained in Atlas 2S+ comprehensive durability test.ln • lip SunPower" Residential • . ' . 1 Power Warranty Protluct Warranty More guaranteed power 95%for first 5 yeas, Combined Power and Product defect 25 year coverage -0 496/yr.to year 257 that includes panel replacement costs SPR-X22-360 Standard Tests'3 UL1703Type 2 Fire Ratio ,IEC 61215,IEC 61730 Nominal Pmver(Pnom)11 360 W quality,Certs 1509001 2008,150 14001 2004 Power Tolerance +5/096 EHS ComplianceROHS,0HSA5180012007,lead free,REACH A _Panel Effin nc 12 22.2% Si 63,PV C le Rated Voltage(V. ) 606V Subtainability Cradle to Cradle(eligible for LEED pouni Rated Current(Im ) 594A Ammonia Test IEC 62716 Open(irNit Volta eNoc) 69.5V Desert Test 10.1109/PVSC.2013.6744437 Short Circuit Current(Isc) 6.48A SaltSpray Test IEC 61701(maximum severity) max.system Voltage WO UL&1000 V IEC PID Test Potential Induced Degradation free:1000 V° Maximum Series Fuse 157Available Listings U4 TUV,JET CEC Power Temp COef. -0.30%/eC Voka eTem Coe[ -1674 ne/ C Current Tem Coe[ 3.6 mA/°C Temperature -40.Fto+-185°F(-40°Cto+85-Q IEFERENCfS Impact Resistance 1 inch(25 mm)diameter hail at 52mph(23 m/s) I all wm SPR x21315 r5.a re be mmenuonal 1:25D w.a IaIr Appearance Class A+ pamm�s are presenrel Pane rgoc 11106.11 i09 Solar Cells 96 MDnoc [attire Maxeon Gen III nyaral-.2SWume rdo adall pxwaviopea,an Fr�parel ng•wnpeebl n,Iel as luctuay,zol3 Tempered Glass HIhtransmisson tem retl anti reflactbe ] sumbror O,Pa poen,am vs.per Da 2ol wand.Campeau c el al.'Sun111 poor, Degraaarmn bele;s,nPoarvmepaper Fee zm3:(organ Dtrf sunpower cell pepvm eRfL, Junction Box IP65,Mi com2atible on m15 Weight 411bs H86k 4 YonPovrer MMJe 40 Year Useful Like sunPwrer vfi,a pope,May 2015.Useful Idea 99 car d me parelzoperalxgal moreman/0goludepo..er. Max.Load Wind:62 psi,MOO Pa,305 WW famr,&dark s wgle4M beer 3,are suicm sdn pare$PIKKon pi carver Feb 2014. Snow:125 psf,6000 Pa,611 legacy front a Ib are crew man E.Serea park,gM mae energy man he menage o1 me me la parer ompanles rented In 2.2n Si mne.INmrrpanmA Pbolm lewommonal Feb 2013. Frame Casst backanod zed(hi hes[PAMA ratio ) 7 mrrpareaMm Ire top Is manufanurem sunPovrer warrant'Feairt May 2015 aA.nererallonana saexmvons mm mayappy.see..armngla aelalb. mm [46_Ip1 8 ion 9 x ks sere act F sere,5 01 rap a panel mmufarmrers rested m 2D13 repot 3 a er ecal [55 15588 in) —I Pi In 2D14.Foram C,at al.'kaunM@r N 6ampai Ibraare In M solar Moles',Pa12". - %n.11 L20 FMMf PROFILE 10 Ccnryx tl... lM1 -5 ed Ip Se me a5 E5e' LeJ'n Nac 6Iry po F b2a13 a 11 v 11 Aaea n i c a (loww rN e RM 1.5 25 c.MRFL[alio zlanaaa'. 1046 mm fz 11. MCS My g 1260 a 'g f u 11c r. tl gV eurUm. [4L21n] 13 Tyre 2 fl,ern ng R'r It 1ID32013,C1as5C fir—ung no,011 Pec ecam 30mm 14 w saksperson tortkla R. 11 ml Please react l In are andimrallanm guide. _ seew«w.mnprwa.romnar,lo.an.......erremmllaavrn. Da mmehmlk,cee caendal da—heal wwn.SmiPo c.com.a9nels. Document 514618 Rev A/LTR VS IRONRIDGE XR100 Rail See Descri tion / Length Rai Sect bon Pro erties Property - Vok1e Total Cross-Sectional Area 0.582 in' .66 Section Modulus(X-a&) 0.297 in' .46 Moment of Inertia (X-axis 0.390 ins Moment of Indic (Y-ozi5 0.0&5 ins Torsional Constant 0.2140 Polar Moment of Inertia 0.126 in' 1.99 APPROVED MATERIALS: 2,44 6005-T6,6005A-T61,6105-T5,6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) 58 1.25 Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-1061328 XRI00, Rail 137(11 Feet( 7.50Ibs. XR-100-168A XR-100-168B XR100, Rail 168" 14 Feet 60065eries 9.55Ibs. XR-106204A XR-1062048 XR100, Rai1204"(17 Feet( Aluminum 11.60 lbs. v1.1 IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KR, XR100 BONDED SPLICE � 2 1) Splice, XR100, Mill 12" long 2) Screw, SeH Drilling 1.24 I +II .63 1.93 .31 T .15 .93 0.42 812-14 TYPE"B"THR D Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish MIN rirish Clear .va © � QuikFootPRODUCTGUIDE \ \\ Exploded Installation. - : . \ ^ i : . / !§ : \ , / Cut Sheets -3 it \ ƒ! \1' ■ . sten Sola � � < ) QuikFoot— Product Guide Exploded Product View, Bi II of Materials Materials Needed For Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 3 QuikFoot Flashing 1 4 EPDM Washer 1 5 L-102-3"Bracket*(other options available) 1 .L. Q 6 5/16"EPDM Bonded 18.8 SS Washer i r.� 7 3/8"Stainless Steel Hex Nut 1 �. Required Tools 1wZ � u f 877-859-39M7 EmFasko Solar M cootent protecfetl under oopyngN.Al rgl s reserved.10109/14 1.1 E.FaMeo Sder proluN are pmhc4N by g Nlomo,U.S.Pabft:0.151.522 B28153,700820181]98 B20.166,7131328,1",2M B28,209,014 82 0 245 656 82 8 2]2174 32 a.225,55762 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0.33in [8.38mm] ei 'rl V1 � Ec . . O M Nj3 E In 1 .50in t [38.10mm] 3/8"-16 Stud E E ' P ^ M a V n QF-M : 1 .5, I OF-L : 1 .7F 877-859-394] EcoFasten Solar°All content protected under wpydgh.All ngnts reserved.101OW14 3.1 EwFasten SdarumdumarepmledeE W"Mla U.S.Pmen6:0.151522 828.153,700820.181398 B20166,713828.146299B28,209 914 B28,245,454 82 8,272.174 B28225,557 B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] .032in [0.81 MM 12.00in [304.80mm] 3.00in [76.20mm] avm� 50in 8.00in [ 12.70mm] [203.20mm] 877-859-3947 EcoFasten SolaOM content pro de untl copyngM.M ngh s re9e .lMW14 32 Eo Fasmn 5dar pr uM am pmbchH by Ne Waving U.S.Panne,8,151,522 B2 8 153 700 82 8,181,398 B28.1%713 B28,14299828209,914828.M.AU 828272,174820.225557 B2 QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8" -D /A 46 SERRATIONS M �o N � 1 7/8" R1/16" 1/4" 5, 3/4" 1/16"� R.005 R.010 2X R.OI -- - - c` 60.000 0 3/8"+'002 Y 1/8" 0 7/8" X 820 DETAIL A SCALE 3:1 877-859-3947 EwFasten S r`All content pmtected under wpyngft All rlgh reserved,1�14 3.7 ECOFdaten Sdatprotlucb are pmt Ey Memel ,U.S.PNnw 8.151,5221328,153,700 328,181,398B28,166,713 B28,146,299 328,209,9141328.24SAM U8,272,174 B28,22555762 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A WORK INCLUDES A. Submit manufacturer's written specifications. B. Base plate is 6000 series aluminum with one 1. CORE=base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. ultimate and allowable load values specific to as shown in load test data. B. RELATED SECRONS the roof deck specified for the project. D. Counter flashing is.032gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4,Division 77hermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTIONA. Bracket is mill finish aluminum A. COMPONENTS: 1.S DELIVERY/STORAGE/HANDLING B. Base Flashing-Black-kynar painted i. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel `"'thin 24 hours of any missing or defective items. PART 3-EXECUTION stud,(1)stainless steel nut(1)EPDM washer Keep material dry,covered,and off the ground until and(1)bonded Stainless steel and EPDM installed. 3.1 EXAMINATION washer. - A. Substrate:Inspect structure on which brackets 2. Fasteners PART 2-PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B.Fasteners should be selected for compat- EcoFasten Solar• ibility with the roof deck. 289 Hamel Street Morrisville,VF 05661 B. Notify General Contractor of any deficiencies C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensdlaccom stem.See test data at C correctlyfy prior priofingr to material has been installed sr' 2.2 MATERIALS correctly prior to installing solar attachment wWant fif required prom brackets. 3. Sealant(d required by roof manufactured: A. Attachment Bracket to be roof manufacturer approved. 6000 Series Aluminum(choose one) P 3.2 INSTALLATION 4. Aluminum counter-flashing LCP-SQ-Slotted A. Comply with architectural drawings and project 5. Aluminum attachment bracket 2.P-111-A engineers recommendations for location of 3.P-3-CSK system.Comply with Manufacturer's written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5.L-102-3" project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8,Custom assess existing structures to make sure that they can withstand retained loads. 877-859-394] EwFasten SolaPAll wnteM proteged order wpydgM.AA rights resermd.10109114 4.1 EmFestm Sdarpro udserepmlecRNby Mefdw WUS.Pate 8,151,522B26153,70OB28181,398B28,186]AB28,1"299828,299,914828,245,4UB28,272,14828,225,55]B2 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall,not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements - • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy# 9 Installation Crew Operating Policy Pioneer Valley PhotoVoitaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a,licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy# 9 Installation Crew Operating Policy