Loading...
30A-023 (8) 40 LEeXINGTON Av€. SP-2019.1283 r,Na: COMMONWEALTH OF MASSACHUSETTS Mso:Block:30A-023 CITY OF NORTHAMPTON Wt:•001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS PF_rp�ir Bulldina DO NOT HAVE ACCESS TO THE GUARANTY FUND (MOL c.142A) Cateaorv,SOLAR ELECTRIC SYSTEM BUILDING PERMIT Emillt# BP-2019-1283 PmltjtN .IS-2019.002074 Est Cost;S32384,0 $75.0 PERMISSIONIS HERESY GRANTED TO: Const.Class: Contractor: zleensel Use Group: PIONEER VALLEY PHOTOVOLTAICS 111268 Lit Sjg(sa.e.), 11194.92 Owner., MESCON CORY&BEN BAUMER Zor n&URBON)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT. 48 LEXINGTON AVE ADpIka tAddrefs: Phos n ar nc : 311 MELS ST - SUITE B _(413) 772.8788 Workers Compensation GREENFIELDMA01301 ISSUEV QN,,Ul 4/2019 0:00:00 TO PERFORM THE FOLLOWING WORK:SOLAR ON HOUSE - 16 PANELS & GARGE - 6 PANELS - 7,19 KW POST THIS CARa SO IT 11 VISIBLE,FROM TLJE STREET Impectorof Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Motes Faatiagal Rough: Rough: House ti Foundetlow Drlvee,py Final: Final: Final; Rough Fnemal Gael 'ee,. gartntont FireplatwlOhimaFYl Rough: Ias"liall Final: Final; THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certifica(e of Occupancy signature: FeeType: Date Paid: Amount: Building 5/14120190;00;00 $43.00 212 Main Streot,Phone(413)587.1240,Fax:(413)557,1272 Laois Hasbrouck--Building Commissioner C ty of Northampton Bi ilding Department Curb CuliDdve"y Permit MAY 13 2019 212 Main Street Se"r/Septic Availability Room 100 Water/Well Availability Norl iampton, MA 01060 Tm Sets of Structural Plans 87-1240 Fax 413-587-1272 Plot/Site Plans Other Specity APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 6 P- 10 - I t 13 1.1 Procertv Address: This section to be completed by office 48 LEXINGTON AVE, FLORENCE MA 01062 Map 3C111- Lot ii a,7 3 Unit Zone Gwrlay District Elm St Distrlp CB District - SECTION 2-PROPERTY OWNERSHIPIAUTHORRED AGENT 2.1 Owner of Rinxi MESCON CORY E&BENJAMIN S BAUMER 48 LEXINGTON AVE,FLORENCE MA 01062 Name(Prim) Cumant Mailing Address: 413.218.3900 See attachment (A) Telephone Signature 2.2 Authorized Agent Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Pril Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed bpermit applicant 1. Building $9,937 (a)Building Permit Fee 2. Electrical 22,447 (b) Construction Gam Cost of 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5.Fire Protection 6. Total=(1 +2+3+4+5) $32,384 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature c, Building Commissionedlnspector of Buildings Date a s PVSq 13-7 Solar) 1Fm.4s3-772- 668 Phone:413-771-87881 Fax:413-771-8668 *` 311 Wells St.Ste.81 Greenfield,MA 01301 MA Elec Lk.A737641 MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety,electrical,and building requirements as defined by their respective jurisdictional entitles. This Includes the work of people from multiple disciplines,including electrical engineering,structural engineering,civil engineering, electricians, construction supervisors, roofers,and their associated helpers. We are a company that values training and education.We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education,including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30,2009 Massachusetts Board of State Examiners of Electricians(BSEE)judgements,and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1;1 ratio. We also understand that non-electrical tasks associated with a Solar Installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Doe To Incomplete Information Existing Proposed Required by Zoning Thu column m be MW m by BuiNma Depanmeni Lot Size Frontage Setbacks From Side L: R: L:,. I R:I. i Rear C� Building Height Bldg.Square Footage Open Space Footagemmw b =l = /. IO tor arta bldg ffi parts #of Parking SpKes L— Fill: vodme ffi Locedon A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES,date issued::' IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Bode 1. _ _ Pagel and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size,type and location: I- D. Are there any proposed changes to or additions of slims intended for the property? YES O No O IF YES, describe size, type and location: E. Will the construction activity disturb( enng,grading,excavation,or filling)over 7 etre or is it pan of a canon plan that will disturb over 1 acre? YES NO O IF YES,then a Northampton Storm Water Management Pennit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicablel New House ❑ Addition ❑ Replacement Windows FAIteretlon(s) ❑ Roofing ❑ Or Doom O Accessory Bldg. ❑ Demolition ❑ New Signa (0) Decks (p Siding(O] Other[C3] Brat Description of Proposed Work; Installation of solar array on house and garage roofs. Alteration of existing bedroom_Yes_No Adding new bedroom Yes x No Attached Narrative Renovating unfinished basement _Yes x No Plans Attached Roll -Sheet 5a. If New house and or addition to existing housing,complete the following a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stones? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction L Is construction within 100 R.of wetlands?_Yes _No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulabons? Ves_No . I. Septic Tank_ City Sewer Private well City water Supply SECTION 7a-OWNER AUTHOR17ATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT l Ben Baumer and Cory Mescon as Owner of the subject MOP" hereby auMprvs PV Squared to act cn my behalf,in all matters ratifies to work authorized by this building permit application. See Attachment A 5/6/2019 Signature of Owrw Date PV Squared ,ea@rmeNAuthodzed Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penaflles of pedury. Chris Krezmiem PrInt Name 5/6/2019 Slguture of OwnedAgent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable 17 Name of License Helder:Daniel Gomez Gonzalez CS-111266 Licame Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address ,W,,�,,./ Expiration Date '^"--0 413-772-8788 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable 0 Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B. Greenfield. MA. 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.O.L.e.162,§26C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes....... 0 No...... 13 11. - Home Owner Exemution The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or lwo(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,Provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 10835.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A Person who constructs more than one home in a two-year period shaB not be considered a homeowner. Such"homeowner'shall submit to the Building ficial,on a form acceptable to the Building Official,that hdahe shall be responsible for all such work Performed under the bu0dint Permit. As acting Construction Supervisor your presence on thejob site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusens General Laws Annotated,You may be liable for pcmn(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the Sante Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ATTACHMENTA - AUTHORIZATION TO PROCEED AND SERVE AS AUMM ZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVokaia Cooperative to proceed with the above-referenced Project in accordance with this Agreement.I further authorize Pioneer Valley PhotoVonalcs Cooperative,or its designated representative,to obtain required permits for this project on behaN of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVokaics Cooperative for marketing purposes.A check for the First Payment is enclosed andel I am returning this Agreement within 71 days of the Proposal date. Printed Name Date ` I1nL�re �.t Title xv �..z2 Prin[eON �� n__________ Date signtp Tisk PPoollefsa a.a ewmwr.A4at,ante ® Commonweallh of Massachusells Division Of Professional Licensure Board of Building Regulations and Standards Construction Supervisor CS-111266 Expires 03/1412021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner C4 Office of Consumer Affairs and Business Regulation One Ashburton Place- Suite 1301 Boston, Massachusetts 02106 Home Improvement Contractor Registration Type: Supplement Gard RegibiraBdn: 14W77 PIONEER VALLEY PHOTOVOLTAICS COOP Expiration: =1512019 311 WELLS ST SUITES GREENFIELD,MA 01301 UPIMa 1600.and Return Card. 7. ..................> onma of oen..—anal,.•.......B.Pnbu.. HOME IMPROVEMENT C0.1RPCTOn H,I.lralbn vallG for Individual use ONE TYPE:sumu.ne•R Ca-d before the expiration date. nloundmnrnto: RwIWMbn Expired, OMPo el GOnOumer Affairs Pat Business RqulN4n 140077 09x1512019 10 Para PIm-Sults 5170 PIONEER VAUUEYPHOTOVOLTACS COOP Bdsbn.i1901fa t CHRISTOPHER NRE2MIEN 311 WELLS ST SUITE B GREENFIELD.MA 01501 Undersecretary Ndf valla withoeft falifinaturr The Commonweahh ofMassaehusefts Department of IndustrialAccidents I Congress Street,Sufte 100 Boston,MA 02114-2017 www.massgov/die U,krkers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE RT D WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leaibiv Name(Business/Organiratior✓Individua0l Pioneer Valley PholoVotiaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SUMS City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Arcyoa es<mpbyert Chek the appreprbte hos: Type of project(required): 1.01 run.cmpbym with 48 employes(fullmNmput-time).• 7. Now construction 2.❑l un a sole pressieror or partnership and have no employer working for me in B. Remodeling any turned,[No worker' mountainp.mource "usi e.] 3❑1 on a homrownr doing 01 work myself.[No workersred]1 9. ❑Demolition wvP.imurance required] 4.[]l on a homeowner and will be hiring cors ebrs on conduct all wek as my progeny. I will 10❑Building addition mormcflao.11 conmctom either hive workers'compenmfnn immutce a are sole 11.❑Electrical repairs or additions propdemrs win m on loyces. 12.❑Plumbing repairs or additions 3.0 I am snared contractor and l have hired the sub-cantncmr lisad w theanachrN shot 13.�Roof repairs Thune sub-convenors Mve employers uM have waken'omp.iournu.l fi.❑Weerea),and ahand is offiershave.worketheurightofssic, ionper MGL.. 14.0Other Solar PV 152,41(4).end we have vee employees.pip wakes'rump.ivamaoetequiredd •Any applicmulat checks boa til most also fill out the section below showing their workers'compensation policy association. t Homeowner who submit this affidavit indicating they are doing all work and then hire outside contmebr must submit a new affidavit indicating such. Zaenors that chmk,his box mint attache as additional sheet showing the name of the mbaunnactor,and state whether or not those entities have employeeslfthe sub-con Tactors have employees,they must provide their worker'comp.policy number. I am an employer that is providing workers'compensation humane for my employees Below is the policy andjob site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Date:01/01r1020 Job Site Address:48 LEXINGTON AVE, Cit,/Stase/2ip:FLORENCE MA 01082 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well get civil penalties in the form of a STOP WORK ORDER and a fine of up en$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby c rte a' ndpenalties afperjury that the information provided above is true and correct Siena Date 5/6/2019 43- 8 Phone N: 17�"87 Official use only. Do not write in this area,or be completed by city or town oJfiriat. City or Town: PermfULicense# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: ACORU® CERTIFICATE OF LIABILITY INSURANCE °""'N"-- D280H8 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EKTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: N ft ceriM a holder Is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED proYMions or be endorsed. If SUBROGATION IS WAIVED,subject to fine terms and conditions of the policy,cartiiin policies may require an endorsement. A sbbnMM on this cendbate does not confer rights to the ceMnrate holder in lieu of such andornment(s). PRODUCER g�� LNda PANIs.CR S Webber3Gonnell PHONE (013)586-0111 ga (013)5888981 8 Nunn King Sheet AppREss: Ipovme®IwEENaM9dnnell.Wm AFF°RONOWVFA,ROE rNL0 NpMamptan MA 01060 NfVRERA: One Orear"YILlbarry 24074 INSUMD INBURER B: Ohio Se uft LItal 24082 Pioneer Valley PhgoVdlake Cospearm,Inc. NBuRER C. Conficandal Ind-OVIVAUW AM:Karn Plndral NSUMER 0: 311 Wells SMeM,Sake B mauRER E'. GMM6dd Mk 01301 INBURER F: COVERAGES CMnFICATENUMBER: Master Espt-2020 REVISION NUMBER: THIS ISTD CERIN YTHAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED M THE INSURED NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTANTHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANYCONTRACT OR OTHER DOCUMENTWITH RESPECTTO WHICH THIS CERTIFICATE MAYBE ISSUED OR MY PERWN,THE INSURANCEAFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECTTOALLTHE TERMS, EXCLUSIONSAND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MY NAVE BEEN REDUCED BY PAID CLAIMS. Lm TYPE OF INWRYICE Pakagatesla LOMMEALML GEXFAKLWaITY EALH°CCURRENLE B 1,000,000 CL,k. OF ®OCCUR FREMI B '000 EEDEV f 5•0110 A BKS570Y1282 011012019 DIMIQ020 PERSOMLBAwINJURY f IM,M GNIA P WLIMTAWUMPER: GENERALAGGREGATE f 2'000'0DO pAICv❑M ❑LDL PROXCT3-00I `AGO f 2,DDD.DCD o ER S AMMOMLE LIABILITY CMMI I I I N G L E L I M T S 1,OM," ANYAUIO BCOILYINJURY(P/Wrull B g ..E. eclEnueO B1S5TOT2282 011012019 011012020 eCOILYI.RY1 ANM1 f A'a"c arANO3 HIRED xplAMlm y ALTO a ONLY ANOBOKY 51Kcall $1KWmp Underinsuad motarMt Bl s 300.000 GNBRELULW gpWg FALN OCCURRENCE f 3,000000 A ExcEfeuw IXAal4MALE USO51012282 011012019 011012020 ABGMoATE 3,000,OW OED RETENTION S f aaaaras sL01NEXBATION Am EMPLOYER!'IlMNl1Y Ke"PFGPRIETCWNRIrAAAImVINE YIN E1.FACHIGCIDwT f 1.IIDD.D00 C OFFOE EMEREXCLULEW ❑N NIA WCRBDMYR 011012019 011012020 IWgMOry M NH) EL DISEASE-FA EM0.0YEE f 1'DOD'OW 'ye assate NN 1,ogD,DDo DESCPoPTMM OF CPEMTIONS Labe E1.DISEASE-POLICY LIMIT f CWNnercell PmpNN BUMneee PNS PIgNdy $1.250,000 A BK55707MONYR 011012019 011012020 XMMselbn $50.000 Trsnsponefian $75,000 MKRIPTOX OF CPEMTIXIa I L°L.R I WHILLFH WORD 101.MaNMM MMB WIMMa sure NM0.l X MM rpo Is lgMral WNkels aanpenee60D Wages Me.CT.and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRES MATME X11- 0 l9W2D15ACORD CORPORATION. All rights reserad. ACORD 25(2016103) The ACORD name and logo are registered marks Of ACORD PROJECT INFORMATION: OCU44 • Owner: Ben Baumer ^ C Cory Mescon y/ • Address: 48 Lexington Ave. �s��I//�•f Northampton, MA 01062 Garage •. , ••` • Phone: (413)218-3900 311 We65bM.SWeB • Gremfiekl IM 01301 Email: amber.consume@gmail.com �ac mredc p cory.mescon@gmail.com a3.nMM • System Size: 7.19 kW DC-STC 1a: Baumer&Mescon • Modules: SunPower E20-327 WE: '^r�•'� .^ • Rail: Ironridge XR100 rvwB•n.Mn.MA03as3 • Bases: Ecofasten Quikfoot • uvBwus: Snow Load: 40 lbs • Wind Speed: 117 mph House ROOF STRUCTURE: • House:30.2x5 rafters @ 24"O.C. • Garage:35"2x5 rafters @ 24"O.C. ROOF MATERIAL: N.Saik � V w Asphalt Shingles PROJECT NOTES: 1. Framing location to be verified on site. Part Make/Model Qty- 2. Slide rail assembly as needed to avoid Base Ecofasten Quikfoot 50 interfering with splices or bases. Flashing Ecofasten Quikfoot 50 3. Unless otherwise noted bases are staggered L-Foot Ecofasten SOLA 01-3 50 3me Site Plan and spaced not more than 48"O.C. Fastener GRK RSS 5/16"X 3-1/8" 100 _ 4. Additional or alternative bases may be used Sealant Geocel 3 to meet actual roof conditions. ww m3s 14'Rail BLK Ironridge%R-100-1688 7 17'Rail BKL Ironridge XR-100-2046 5 n. A Rail Splice Ironridge XR-100-SPLC-M7 4IIlonn, vrsrm3s Rail Clamp BLK Ironridge UFO-CL-01-Bt 54 SC&L Rail Stopper ELK,46mm Ironridge UF0.5TP-46MM-B 20 '�' •'�-"rt' Rail Cap Ironridge XR-100-CAP 10 Optimizer Bolt Ironridge Ml-BHW 22 PV-01 B Mechanical Balance of System(MBOS) rsn.M r an SouoA Roof-339" 3 ^Q Array 332Y•" „�" °� .6 1-4 °. . iv rS Squared satyr 3++waN Sueso-eec sm+e e _ Lreer"d MA 01301 C ryO 0es16MpvsNuap N tl}M]R-878d]e8 1 r 0-4 co xr: Baumer&Mescon a` — 7)- 04' ( 41-1 • M a6 Lexrn nAn. NpOumpMn,MA 01062 Array centered aeraas between hips and-6"from House Array Array d In edges. A y16'•1'O' South-acing roof South-facing roof of house. Use blocking or "• decking attachments ryat edges as needed. m 1 m F < C .. ( 21 ) Array centered between hips • and-6"from um, edges. n S ry Me Array Layout `o T C — RAIL SPECIFICATIONS Mw. 12+N Make&Model: Ironridge XR100 #II Clamp Torque: 8O 1n-lbs pA1E IMM19 L-Foot Torque: 250 in-lbs se.,a. Aa Sn Max Span: 63' Ste: N/Ya11' ,r-- Array 124Y4' —}'- Max Cantilever. 21' ,r Roof-262" —T MODULE SPECIFICATIONS: SunMakePower E2O-327 PV-02 B Garage Arrays Clamp Range: 2"to 16"on all sides 3n6-•ra Module Size: 61-5/16"x 41-3/16"x 1-13/16•(46mm) y,eN1 wa 9� New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction,VT 05001 Jonathan Rugg, P.E. 603-903-9798 1.mgg@NewEnglaMCmstmcbonEngineering.cam September 25, 2018 Ms. Madeleine Geschwind Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re: Baumer& Mescon Residence, Northampton, MA PV Squared Project No. 12138 NECE Project No. 18-001 T-158 Dear Ms. Geschwind, At your request New England Construction Engineering, PLC(NECE)has reviewed the information that Pioneer Valley PhotoVoltalcs Cooperative, Inc. (PV Squared)provided on the roof and supporting structure of the Baumer&Mescon residence,at 48 Lexington Ave.,in Northampton, MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic (PV)array.The information that you provided is attached for reference. You are proposing to erect PV panels on one side of the house roof and on two roof surfaces of a detached garage.The house is a two-story residence with a gable roof.The main house measures approximately 18'x26.The roof has a 30-degree pitch and is supported by full sawn 2x5 rafters at 24"O.C.These rafters span approximately 9'on the horizontal.There are ceiling joists approximately 30"below the peak.The house appears to be balloon framed and the exterior wall studs cannot be observed without destroying finishes.The photographs that you provided suggest that the roof and walls are straight and performing well.We assume therefore,that the balloon framed walls resist the outward end reaction of the rafters and transfer the outward force to the second-floor joists.Our conclusions are predicated on this assumption.The roof has solid board sheathing and asphalt shingles. The garage measures approximately 20'x21.The garage has a hip roof.The roof pitch is 35- degrees.The garage is supported by full sawn 2x5 rafters at approximately 24"O.C. 3x8 ties at the top of walls resist the outward end reaction of the rafters.The roof has solid board sheathing and asphalt shingles. NECE's analysis and review includes the controlling gravity load combination (snow and dead loads). New England Construction Engineering, PLC PV Squared—Baumer&Mascon Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 Conclusion: Based on the information that you provided, in my opinion,the house and garage roofs will adequately support the design snow load and the additional dead load of the proposed PV array. I base this opinion on the following assumptions. I assume that owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles. I also assume that PV panels will be installed parallel to the roof, eliminating any additional wind load. The ground snow load (Pg)for Northampton is 40psf. According to information that you have provided,the proposed PV panels weigh approximately 2.6 psf. In summary, in my opinion,and predicated on the assumptions above,the house and garage roofs will support the proposed PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. is Sincerely,onathan Rugg, PE. e New England Construction Engineering, PLC. Attachments: -Building Information SOLAR PANELS HIGH PERFORMANCE & EXCELLENT DURABILITY a SERIES • 20.4%efficiency Ideal for roofs where space is at a premium - or where future expansion might be E20-327 PANEL needed. • High performance HIGH EFFICIENCY° Delivers excellent performance in real world Generate more energyper square foot conditions, such as high temperatures, clouds and low light.t'-3 E-Series residential panels convert more sunlight to electricity producing 36%more power per panel,' and 60%more energy per square foot • Proven value over 25 yearsT4 Designed for residential rooftops, E-Series panels deliver the features, value and HIGH ENERGY PRODUCTION' performance for any home. Produce more energy per rated waft High year one performance delivers 7-9%more energy per rated watt.' This advantage increases over time, producing 20%more energy over the first 25 years to meet your needs.' Iso% 20% Mw•Energy 1 110% - Per Rated Won Maxem•Solar Cells:Pund...i ty better. 100% Engineered for ped°ruranre, designed for durability, 90% 35%more, mr 25 Engineered for peace of mind �% 1 Designed to deliver consistent, trouble(ree 7g% Conventional energy over a very long lifetime.4s 60% Designed for durability r so% The SunPower Maxeon Solar Cell Is the 0 5 10 Yoan 15 20 25 only cell built on a solid copper foundation. g lox Virtually impervious to the corrosion and 3 ta'n'nin•High E crocking that degrade Conventional ez -'�Power m High Tempa r� 5 No rig cuicut ed ororr panels 4'5 6% r Degmd°Bon r n #1 Ranked in Fraunhofer durability test.1O I High A.emge W°na 100% power maintained in Adas 25' 4% Bener i—H,hr end comprehensive PVDI Durability test." Specrrel Usti 2% J Hiph-P h rrxnm $ AtirRit i.e Glaa www.sunpower.com SUNPOWFR SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY IOOx 95% BS% BO% 0 5 10 IS A ]5 0 5 10 IS >0 ]5 Ym vwn Mora guarommd power:95%1.,lint 5 years, Combined Power and Product defect 25 Year coverage -0.d%/yv b year 25! that includes prowl replacement cosh.° ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA E76777 E19-870 Temperaron -40°Fb+185°FI-40°C b+85°Cl Nominal Power's(Pnoml - -327 W 320 W Max load - Wind:50 pd,2400 Po,245 kg/ms ham 8 back Power Tolerance +5/-0% +5/-0% Snow: 112 pd,5400 Pa,550 kg/m'hon Avg.Panel Efficiency's 20.4% 19.8% Impact nsistanot 1 inch 125mm)diameter hall at 52 mph 123 m/sl. Rased Voltage lVmpp) - - 54.7 V 54.7 V APPealonce Chu A Rased Current(lmpp) 5.98 A 5.86 A Solar Calls 96 Mon«rysblline Motion Gan II Open-Circuit Voltage(Vocl 64.9 V 6d.8 V Tempered Glass High samrriuion tempered AnfAReBecOw ShotCircuit Current hsc) 6.46 A 6.2d A Junction Box IP-65 Rated Mo..SysMm Voltage 600 V UL 8 1000 V IEC Con majors MC4 Compatible Conllxtos Maximum Series Fuss 15 A Fama _ Clan 1 block anodised(highasl AAMA rating) Power Temp Coef. -0.38%/C Weight _ 41 lbs 116.6 kgl Voltage Temp Coal. -176.6 mV/°C - TESTS AND CERTIFICATIONS Current Tamp Cmf. 3.5 mA/°C Standard roste UL7703 ITy m 2 Fire Rating),IEC 61215,IEC 61730 REFERENCES: Quality tem ISO 9001:2008,ISO 14001:2004 1 Al ocnpordson am SPR-E20-327 n.a represent moliw comamional pard:250W, EHS Compliance, R.1/S,OHSAS 18001:2007,lead From appro%. 1.6 m2, 15.3%efficianc,. Ammonia ten IEC 62716 2 MEically n h6s'SunP. Shading Study;Fab 2013. Solt Spw" IK 61701 1possed mo%imum es,.M R Tom,'Jlan 2017-9%3 y per sors, /DNV Ergirleerilg'SullPowv Yield PID test PdentiaHnduced Degmdafion fine: IODOY" A Shu Pewer 0.25%/yr degradalien w. 1.0%/yr mm. parol.Campeau, Z. N al. Amilable listings UL,CEC,CSA,TUV,JET,KEMCO,MCS,FSK 'SunPowar Module Degradation Rab;S.W.whit paper,Feb 2013;lorden, Dirk°STen Repot;NREL,Ori 2012. T 5°SunPwareer.er ModuledOYear Useful LWSunPw.ar whit paper,Feb 2013.Useful life is 99 out of 100 poneb opera ting a mom than 70%of rated power. co 6 Serd highest, after SunPoear RSerin, d crew 3,200 silicon dor panels, Pham Module Sur9my,Fab 2014. E 1046 mm 7 8%mora i mrgy+an Lha enrage of Ete by 10 poral mrn,mies luted in 2012Imo`--' [41.2 in] 1151 parole, 102 companies),Photon Imuratbnol,Feb 2013. 8 Campoed with the rep 15 manufacturers. SunPowr Wormary Renmw, Feb 2013. 95om t8 p ro usapply.See warnydetails. 10 5 offby 6 poral momanufacturersFromom 2013 myon ware bslsd, 3 additiam46 mml -14 1.- 1558 mm silicon solar pods hr the 2014. Femoro, C., at al. °Fraunhder PV Dum6didy [1.8 in] 161.4in] Initafive for Solar Modules:Pan 21.Phob9obatrs International,77-85. 2014. 11 Canpomd with the rmdWeed comm[ parol. Atlas 25+ Durability test repot, Fab 2013.hom 2013 repot ware tested, 3 additloml eil*.n sol r pomis for Rhe 2014. Ferran, C., 0 al. "Fmunhdes W Durability Infiiotim for Saler Modukx Pan 2°.Phaodbice Imonotbnal,77-85. 2014. 12 Standard Test Conditions 11000 W/m' modarae,AM 1.5,25°C). 13 Bawl on osarage of measured'power vduss during production tor NV-dool,.asso fw mondni4reefndMdeesM1.a......,w+'�.�Mde°.A..s.via dW//ad i.abw....w.�wN bd°i.°ary d:.fAa.r. Wamb�laleSWawr Ion.Nl, An rweewl.EUN10Wf9.d°SVNiOWEAI WWW.IYnpOWM.Mm IodeneArdSniew CepeYm.SFwlFeenane indudW In eta dabdu as wbl�'Iadung.�EONN.e109F ENERGY.iCA ViF.,and 51GNANAf en lmd°mmW wrgirYM Nv�nieaWea4r a/IItW //r IRONRIDGE XR100 Rail See Description/ Leng9 Rai Section les Prowy VOWS Total CrossSectanal Area 0.582m .66 Section Moduke X-apt 0.297h .46 Morrent of Inertia X-om 0.390h Moment of Inertia Y� 0.085 in TORanal Constant 0.214h Polar Moment of Inertia 0.126 h' 1.99 APPROVED MATERIALS: 2.44 6005-T6.6005A-761,6105-75,6N01-76 2.34 (34.000 PSI YIELD STRENGTH MINIMUM) 1 _ 58 1.25 Number Number ClearParl Black Pap NumDescription/Length Material Weight XR-100-132A XR-100.1328 XRI00. Rail 132'(11 Feet) 7.50 lbs. XR-IM160A XR-1061688 7fRIMRa116B'(14Feet) 600D."1es 9.55 bs. XR-106204A XR-1062048 XRIOD, RaRMC(I7Feet( Aluwke (1.60 bs. 'IA E /lr IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE dr 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling as 63 1.93 31 0.42 IS 93 #12-14 TYPE"B"THREAD PropMy Value hopeAy Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mi Finish Clear v1.0 Ln L F z Q u i kFOO t PRODUCT GUIDE O Exploded Product View/B.O.M. - 1 Installation Instructions-2 Cut Sheets-3 Specifications-4 Q V Q W w W a0 EcoFasten Solar V i QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 l� 6 2 Fastener(Length to be determined) 2 5 3 QuikFoot Flashing 1 �y 4 EPDM Washer 1 0 5 L-102-3'Bracket•(other options available) 1 T ^ Q 6 5/16'EPDM Bonded 18.8 55 Washer 1 7 3/8'Stainless Steel Hex Nut 1 3 Required Toots w Z - o W 1 f r 877-85&3947 EWFaskn SoWAY wn proeded under capyrigM.N1 dgMs mm .18188/14 1 E.FM SWrg .art golecttl Wtlroklpnp U.S.PNen6:8.151Sn S2 8.153,7W B28.181]98828.1%713828.146399 B2 8,M,914 B28246A54828272.174828n5,557 62 QuikFoot—Product Guide Cut Sheets: QF-AL-Base 2X 0.33in [8.38mm] 00 £ N h M N A�A N i M CiC w 1.50in O [38.l 0MM] 3/8"-16 Stud E E P n h P L QF-M : 1 .5' QF.-L : 1 .7Y _ 877-859-399] EwFBstm Solna Plw Mpralm w rcopyMgM.AingMBmse i .lMW14 3.1 EaF S arpoa an Vma tlBy BnhAO%wgU.S.PaYfM:B151,522828,153.]00828,181,398828.188.]t3 B21.ib.299828,208,919828.245.959828372,1]l B281]5.557 B2 QuikFoot- Product Guide Cut Sheets: QFL-812 R.38in �[9.53mm] .032in [0.81mm] V1 9 i�l it 12.00in [304.80mm] i, 3.00in [76.20mm] .50in 8.00in _ [ 12.70mm] [203.20mm] 8))-859-3947 EcoFatlen Sda�'AI mMeM proledetl intler mgM.p/rAp rlgMs reeervetl.10.g9/1a 31 EmFrbn SdrpWcb�npcYrYl Ly Ne Mawsi8 U.5.Ptlenb:B.151.5II B28.15J.)00 Bt 8.18t,J8l B28.168.)1]928,1K3W B3 J.MB.81�B3 J.NS.M' Bf!2)2.1)4 B3l.t]5.55)B2 QuikFoot—Product Guide Cut Sheets: Bracket Options- SCL-101-3 i 3/8 --1 A I - 46 SERRATIONS ih I T �O h � – — 1 7/8' R1/16' 1/4" — `m r7 3/4„ 1/16" —y r 1 - R.005 R.010 C 2X R.01 4 60.000 D� 0 3/8"± 006.002 1/ -- 1/9' 0 7/9' X 820 DETAEA SCALE M 877-85&3947 EWFMa SdarOPlcoMBntyoMdMU eopyrgM.AlriBMateaerve0.IUM14 17 E=Fpwn Sdrpma anprtbpb8By Melo) MU.S.P-M :8,151,522B2B.153,788828,181,388B28.168,713B2B,1K,288828,283814828245,454828,272,174B2B,225,557B2 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A WORK INCLUDES A. Submit manufacturers written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket thatPEM Type Press-In Stud 18.8 SS. B. Submit standard product cut sheets attaches directly to the roof deck C. Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. .� ultimate and allowable load values specific to as shown in bad test data. S. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500.Roofing 1.4 QUALITY ASSURANCE plate O 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.DMsion7:Thermal and Moisture Protection the area of project. 1.2 SYSTEM DESCRIPTION A Bracket is mill finish aluminum 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted J A. COMPONENTS: (^-1' 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)Stainless Steel within 24 hours y,any red,and offsdetectivegroup ms. PART 3-EXECUTION Stud,(1)stainless steel nut(1)EPDM washer Keep material dry,covered,and off the ground untg II and(1)bonded stainless Steel and EPDM installed. 3.1 EXAMINATION washer. A. Substrate:Inspect structure on which brackets stand bracket.t. 2. Fasteners PART 2-PRODUCTS are to be installed and Verifythat it will with- 0.Tobe metal compatible with QuikFoot 2.1 MANUFACTURER any additional loading that may be incurred. _ W B.Fasteners should be selected for compat- EcoFasten Solar 289 Harrel Street Morrisville,Vr 05661 N General Contractor of a degdencies Taste with the roof deck. �Y M O C.Fastener strength should exceed or be (977)859-3947 before installing EcoFasten Solar brackets. tial to that of the allowable load of the 1wwv.ecofastensolarcom U C. Verify that roofing material has been installed system.See test data at cart for to installs velar attachment www.ecofastensolarcom 2.2 MATERIALS correctly M n8 3. Sealant(if required by roof manufacturer): 0. Attachment Bracket brackets. to be roof manufacturer approved. 6000 Series Aluminum(choose one) PP 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted 5. Aluminum attachment bracket 2.F-111-A A. engineerComply s recommendations fand project 3.P-3.CSK engineers ply with Manufacturers stun of B. DESIGN REQUIREMENTS: 4.SCL-101-3 System,Compywith Manufacturers Sun la iu 1. Bracket spacing to be recommended by S.L-102-3' stalWtion instructions for installation and layout. project engineer. 6.L-102-6' 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It Is Important to design new structures or 8.Custom assess existing structures to make Sure that they can withstand retained loads. 877-85111 EcoFasten SoW Al mnlint lxol tl under copyright N rights reamed.10109114 4.1 EmF86n 5drt pOlVb eR iM0Yf1V 0y tlN Nronq U.S.Pa :8.151.MR 8.153,700828.181.398926.188.718828.145399830,209.914920.245454928,272 174 US 225,657 M - 3/8" FO A 46 SERRATIONS Th � r T LO R1/16" 1 71W 1/4" 60 3/4" R.005 R.010 2X R.OI 4 4 60.00° 3/8"±.002 X = +/- .1 U OJ 7/8"X 82° SCALEETAIL A 3:1 .XX= +/- .01 .XXX= +/- .005 289 Harrel Street i p Morrisville, VT 05661 SCL-101 -3 �C EcoFasten Solar T°°Free Phone 1.888.859.3994 -- – — — Toll Free Fax 1.888.788.9994 MATERIAL: D c 6000 SERIES ALUMINUM O web www.ecofastensoler.com e-mail info@ecofastensolar.com SCALE:1:1 - 1/6/2012 SHEET 1 OF 1 i Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This polity applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, leamer/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this polity sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 SS3 through SS60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy#9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicine of Installed Eauipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy ff 9 Installation Crew Operating Policy Non Electrical Work at atypical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift setup o Laddersetup o Trash/recycling removal and sorting • Structural improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not Including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching rooflng/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not Including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall,hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifl options o Any"plug and play"devices - o Programming of monitoring devices o Computer based activities • Installation completion o Final building Inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑Check if owner-installed Interconnecting Customer:Cory McScon Contact Person: Mailing Address:48 Lexington Ave City,.Florence State: MA zip Code:01062-2712 Telephone(Daytime):413.218.3900 (Evening): Facsimile Number: E-Mail Address:cory.mescon@gmail.com Address of Facility(if different from above): Electrical Contractor's Name(if appropriate): FN Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD State: MA Zip Code: 01301 Telephone(Daytime): 413-772-8788 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: interconnection@pvsquared.coop License number: A13764 Date of approval to install Facility granted by National Grid: 1/29/2019 Application ID number: 00197077 Inspection: - The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed(Local Electrical Wiring Inspector,or attach signed electrical inspection): Name(printed): Date: License#: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Atm:Distributed Generation 40 Sylvan Rd Waltham,MA 02451 E-mail: distributed.eencmtion(ilnationalmrid.com Mewchusous:htto'// nat' Nidus M 1 t /h rwJ ff/distributed eeneration asp Nantucket:htto,//www nationaleridus com/nantucket/home/enerneff/distributed eeneration.aso Page 1 of 1