CCD5 Narrative of ChangesWALMART STORES, INC. STORE NO. 2901 10/14/15 PROJECT: NORTHAMPTON, MA CONSTRUCTION CHANGE DIRECTIVE #5 PROJECT NO. 1452013 Page 1 of 2 NOTE: The General Contractor shall obtain approval of the Walmart Construction Manager before beginning the Work defined in this Construction Change Directive. SCOPE: The scope of this Construction Change Directive is to revise the originally issued contract documents of Northampton, MA dated 04/21/15, and all subsequent contract modifications, to reflect the following: SUMMARY OF CHANGES:  (OD) Owner Directed Change 1) Reface and minor structural repairs to adjacent tenant per DM approval on 10/7/15. GENERAL SHEET C1 – COVER SHEET STRUCTURAL 1. Add Sheet S4 – FOUNDATION PLAN AND DETAILS to set. (OD1) ARCHITECTURAL SHEET D1 – DEMOLITION PLAN DETAIL 1 – DEMOLITION PLAN 1. Add storefront graphic and doors to the Adjacent Tenant front wall. (OD1) 2. Add interior CMU inside Adjacent Tenant and related dimensions and notes. (OD1) DETAIL 2 – ADJACENT TENANT DEMOLITION ELEVATION 1. Add detail to sheet. (OD1) SHEET A1.2 – INTERIOR FINISH PLAN AND DETAILS DETAIL 7 – ADJACENT TENANT WALL SECTION 1. Add detail to sheet. (OD1) DETAIL 8 – PARAPET DETAIL 1. Add detail to sheet. (OD1) DETAIL 9 – ENLARGED DETAIL 1. Add detail to sheet. (OD1) DETAIL 10 – SPLICING DETAIL 1. Add detail to sheet. (OD1) SHEET A2 – EXTERIOR ELEVATIONS DETAIL 7 – ADJACENT TENANT ELEVATION 1. Add detail to sheet. (OD1) STRUCTURAL SHEET S4 – FOUNDATION PLAN AND DETAILS 1. Add entire sheet. (OD1) SPECIFICATIONS SECTION 00007 - SEALS PAGE 1. Resign and seal per change. (OD1) WALMART STORES, INC. STORE NO. 2901 10/14/15 PROJECT: NORTHAMPTON, MA CONSTRUCTION CHANGE DIRECTIVE #5 PROJECT NO. 1452013 Page 2 of 2 SECTION 06100 – ROUGH CARPENTRY 1. Revise section at 1.1; A; adding “Framing with Dimensional Lumber” to summary. (OD1) END OF NARRATIVE