01100 - 2901Not For Construction01100-1 2901 - Northampton, Massachusetts - 1452013 April 21, 2015 UniSpec II - Store Planning 032709 SECTION 01100 - SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Definitions. 2. Work covered by Contract Documents. 3. Work by Wal-Mart or Separate Contractors. 4. Contractor use of site and premises. 5. Coordination with occupants. 6. Partial occupancy. 1.2 DEFINITIONS A. Furnish: Purchase and deliver to project site, ready for installation. B. Install: Unpack, assemble, set in final position, fasten in place, make final connections, clean, adjust, and leave ready for use. C. Provide: Furnish and install. D. Receive: Accepting a delivery. (Entity responsible for accepting a delivery.) E. Final Connections: Complete plumbing, mechanical, and electrical connections as required and recommended by manufacturer for optimum operation of equipment. 1.3 WORK COVERED BY CONTRACT DOCUMENTS A. Work of this Contract comprises the general construction required for a Wal-Mart Division 01 Store Remodel. B. Pharmacy Work may include, but is not limited to, minor demolition, construction of new foundation and piers, masonry walls, structural steel and joists, manufactured curbs, steel deck, canopy deck, roof system, doors (hollow metal, overhead coiling, finish hardware), millwork, interior finishes (paint, vinyl tile repair, resilient base, gypsum board, carpet, acoustical ceilings, FRP), sitework (bollards, stoops and stairs, ramps, flatwork, paving/paving repair), specialties, plumbing, mechanical, fire protection and electrical work for WalMart Stores, Inc. C. Convenience Addition Work may include, but is not limited to, minor demolition, structural steel, miscellaneous metal fabrications, masonry screen wall, chain link fence and gate, concrete slab repair/replacement, concrete flatwork/equipment pad, roof system repair, manufactured curbs, rough carpentry, flexible traffic doors, overhead sectional doors, interior finishes (paint, vinyl tile repair, resilient base, FRP, gypsum board repair, acoustical ceiling repair/replacement), loading dock equipment, plumbing, refrigeration, refrigeration equipment, fire protection and electrical work for WalMart Stores, Inc. D. The Division 01 Remodel Work may include, but is not limited to (including coordination of work by WalMart Separate Contractors), exterior sitework (ramps, stoops and stairs, bollards), minor demolition, construction of new walls, partitions with doors, interior finishes (flooring & base, painting, gypsum board, wall covering, FRP, acoustical ceiling, plastic laminate and trim, and glazing), exterior painting, bumper rails, aluminum entrances and storefront doors, automatic swing and sliding bi-parting doors, flexible traffic doors, sectional overhead doors, overhead coiling doors, Garden Center Work (shadecloth and truss, chainlink fencing or ornamental iron fencing), Tire/Battery Storage Area Work, plumbing, fire protection, refrigeration work, mechanical, electrical, and equipment for WalMart Stores, Inc. Not For Construction01100-2 2901 - Northampton, Massachusetts - 1452013 April 21, 2015 E. Office Remodel/Addition Work may include, but is not limited to, minor demolition, construction of new walls or partitions, rough carpentry, finish carpentry, manufactured curbs, roof system repair, hollow metal doors and frames, finishes (acoustical ceiling system, resilient flooring, base, paint, fire protection, mechanical, electrical and equipment for WalMart Stores, Inc. 1.4 WORK BY WAL-MART OR SEPARATE CONTRACTORS A. Wal-Mart has its own forces who will perform certain Work on the project, items noted 'NIC' (Not In Contract) which will commence as indicated on the Construction Schedule. B. Wal-Mart may award separate contracts for work at the Site, which will be executed concurrent with work of this Contract. Consult and cooperate with Separate Contractors to the full extent provided for in the Conditions of the Contract. C. During setup of equipment by the Owner or separate contractors, make crane service available to hoist equipment directly from trucks to final position. Coordinate schedule with Wal-Mart's Construction Manager. 1.5 CONTRACTOR USE OF SITE AND PREMISES A. Limit use of site to allow for: 1. Wal-Mart occupancy. 2. Work by separate contractors and by Wal-Mart. 3. Use of site and premises by the public. B. Confine operations at site to areas permitted by Law, Ordinances, Permits and to Limits of Contract as shown on Contract Documents. Verify with Wal-Mart Construction Manager acceptable locations where operations may occur so as not to disturb Owner operations or customer traffic. C. Do not unreasonably encumber site with materials or equipment. D. Do not load structure with weight that will endanger structure. DO NOT STORE ROOFING MATERIALS ON THE EXISTING ROOF. E. Assume full responsibility for protection and safekeeping of all products stored on premises whether purchased by Contractor or Owner. Move stored products, which interfere with operations of Owner or customer traffic. F. Carefully coordinate sequence of construction activity and operations with Wal-Mart Construction Manager. G. Maintain the following conditions at all times during the construction period until possession by Wal-Mart. 1. Maintain building weathertight and secure. 2. Maintain building security and fire alarm systems in operation. (In the event both systems should fail, the Fire Alarm System shall have priority over the Security System.) a. Contract with local alarm company to maintain service, and repair existing systems as required due to work relating to this Contract. b. Alarm Company: 1) Visit site and be familiar with existing conditions. 2) Respond to service calls within 24 hours. c. Provide on-site guard services in the event the existing system is disabled for 8 hours or more. d. Coordinate security alarm with Section 01500 - Temporary Facilities and Controls. e. Contact Wal-Mart Alarm Central Control at (479) 273-4600 for additional information and coordination relating to work associated with existing alarm systems. 3. Maintain access and egress from the building. 1.6 COORDINATION WITH OCCUPANTS A. Owner will occupy premises during entire period of construction for the conduct of Owner's normal, daily operations. Cooperate with Wal-Mart Construction Manager in construction operations to minimize delays, Not For Construction01100-3 2901 - Northampton, Massachusetts - 1452013 April 21, 2015 inconvenience, or conflict to Owner's daily business operations and customer traffic. The Contractor shall obtain permission from the Owner for interruptions of utility services to the building. Accidental interruptions shall be restored immediately. 1. Any Contractor work operations that may disrupt or interfere with Wal-Mart or building operation or function shall be reviewed and approved by Wal-Mart Construction Manager. 2. Submit written request for approval to Wal-Mart Construction Manager 14 calendar days in advance of date Contractor work operations are required to begin. 1.7 PARTIAL OCCUPANCY A. Wal-Mart will occupy any completed or partially completed portions of the Work. B. Cooperate with Wal-Mart to minimize conflict, and schedule the Work to facilitate Wal-Mart's operations. C. Prior to Wal-Mart occupancy in areas of new work, the following provisions shall be in place: 1. Illuminated exit signs are operational. 2. Exit doors, including required panic hardware, are operational. 3. Lighted, enclosed walkways and other temporary safety measures are in place if required by authorities having jurisdiction. 4. Fire sprinkler system is operational. 5. Doors required for Wal-Mart's security purposes are operational. D. After Wal-Mart occupancy: 1. Keep exit routes and exit doors free from obstructions. 2. Maintain exit signs and fire sprinkler system in operational condition. 3. Provide security for Wal-Mart's products, equipment, and operations. 4. Do not permit smoking in the building. PART 2 - PRODUCTS Not Used. PART 3 - EXECUTION Not Used END OF SECTION Not For Construction01100-4 2901 - Northampton, Massachusetts - 1452013 April 21, 2015