Loading...
32C-029 11 Brewster ct 2009_01_06 N'Hamp Brew. Site Visit Notes ■ 16 Call Rd Colrain, MA 01340 ■ 413.624.9669 413.624.9635 fax ■ office@austindesign.biz Architect’s Site Visit Notes Construction Control Northampton Brewery - Lift & Dormer 11 Brewster Court Northampton, MA 01060 visit date: 6 January 2009 visit by: Chris Farley (CF), Austin Design Inc. copy to: Louis Hasbrouck (LH), Local Building Inspector Janet Egelston (JE), Owner Sean Jeffords (SJ), Beyond Green Construction Ryan Hellwig (RH), Structural Engineer _____________________________________________________________________________ This site visit was made to check on the status of demolition work and the east dormer framing. The following items were noted - 1. The east side of the main roof was stripped of roofing and sheathing. All HVAC ductwork within the existing rafter bays was removed. The new dormer wall was framed and rafter installation was beginning. The dormer header height had been increased to 7’-2” in order that both east and west dormers could be identical and the egress door height on the west side would be adequate. SJ intended to have the new roof framed and sheathed prior to the incoming storm. 2. The ceiling on the first floor was removed and wiring work was ongoing. 3. SJ is coordinating with RH on the reinforcement requirements for the existing roof beam. RH will provide documentation on the required LVL sistering and connections. 4. Due to equipment and ducting needs, the window in the equipment room may need to be eliminated. SJ will confirm. 5. A signed and wet-stamped Construction Control affidavit and an updated set of drawings was delivered to SJ on site. Items have been recorded as seen and understood by this writer. Please notify Chris Farley if you note any omission or if you have a correction. Unless notified to the contrary, these notes are assumed accurate and complete. Respectfully submitted. Chris Farley, Austin Design Inc. MA lic. # 11043