49 -040 Behrens PERMIT-Layout kitchenREF.D/W5049UP25'-1"11'-6"
PANTRY
ENTRY
TILE
STAINED
GLASS
WINDOW
LS
REFRIG
HOOD
PATCH
HRDWD
KITCHEN
OFFICE
LIVING RM.
HRDWD
HRDWD
NEW
HRDWD
HRDWD
MICRO
LSLS
48" GAS RANGE
BEV.
FRIDGE
DINING
NEW (3) 1 3/4" x 9 1/2"
EXPOSED LVL HEADER
BEAM 'A' OVER.
SEE CALC SHEETS
NEW HALF WALL
UNDER COUNTERTOP
HRDWD
ICA2139 ICA2139
ITDH2656 2W
NEW 2x COLUMN TO
BEAR ON BASEMENT BEAM
NEW WINDOW & BUILT-IN
CABINETS THIS AREA
NEW TOE-KICK
HEATER UNDER
NEW CASEMENT
WINDOWS
BY MARVIN, TYP.13'-6"12'-6"2x10s @ 16" O.C.
OVER, TYP.D/WREF.5049UP
OFFICE
ENTRY
TILE
CARPET
REPLACE TILE
FLOORING
THIS AREA
REMOVE
CARPET
FLOORING
CANTILEVERED
BALCONY ABOVE
REMOVE THIS WALL &
INSTALL NEW
(3) 1 3/4' x 9 1/2" LVL BEAM 'A'
KITCHEN
REMOVE THIS
WINDOW & INFILL
REMOVE THIS
WINDOW & FRAME
FOR NEW, WIDER ONE
DINING RM.
LIVING RM.
HRDWD
HRDWD
REMOVE TILE
FLOORING
THIS AREA
HRDWD
FLOOR PLAN - EXISTING CONDITIONS
SCALE - 1/4" = 1'-0"DADMUNFLOOR PLAN - PROPOSED
SCALE - 1/4" = 1'-0"
EXISTING CONDITIONS
INTERIOR PERSPECTIVES
EXTERIOR:
REMOVE WINDOW TRIM AND SIDING AS NEEDED TO INSTALL NEW WINDOWS
AS PER PLAN.
BASEMENT:
DRAIN & CUT COPPER WATER LINES AS NEEDED TO REPLACE THE DINING ROOM
BASEBOARD HEAT WITH A NEW, UNDER CABINET TOE-KICK HEATER.
KITCHEN:
REMOVE ALL ITEMS & FINISH MATERIALS, INCLUDING COUNTERS, CABINETS,
DRYWALL, BACKSPLASHES, APPLIANCES AND FIXTURES, ETC. LEAVING ONLY
EXPOSED FRAMING AND HARDWOOD FLOORING. REMOVE THE INTERIOR
WALLS AND AS PER PLAN TO ACCOMMODATE THE NEW LVL BEAM AND KITCHEN
LAYOUT. REMOVE THE DH WINDOW AT THE RANGE AND PROVIDE TWO NEW.
INCLUDE ALL ELECTRICAL AND PLUMBING DEMO AS NEEDED.
DINING:
REMOVE ALL FINISH MATERIALS, INCLUDING CABINETS, NON-LOADBEARING
COLUMNS, DRYWALL & TRIM, ETC. LEAVING ONLY EXPOSED FRAMING AND
HARDWOOD FLOORING. REMOVE THE BASEBOARD RADIATOR IN PREPARATION
OF NEW TOE-KICK HEATER. REMOVE THE DH WINDOW AND OPEN THE EXTERIOR
WALL & INSTALL A NEW HEADER BEAM FOR A NEW WIDER DOUBLE DH WINDOW.
ENTRY:
REMOVE TILE FLOORING AND UNDERLAYMENT AS NEEDED TO PREPARE FOR
NEW TILE FLOORING. REMOVE BASEBOARD TRIM AND SAVE FOR RE-USE.
LIVING:
REMOVE THE TILE FLOORING AND PREP FOR NEW ASH HARDWOOD TO MATCH
THE EXISTING. CHERRY WAINSCOTING IS TO BE CUT DOWN TO A LOWER HEIGHT,
TBD.
OFFICE:
REMOVE CARPET FLOORING AND PADDING TO PREPARE FOR
NEW HARDWOOD FLOORING. REMOVE BASEBOARD TRIM AND SAVE FOR RE-USE.
DDEEMMOOLLIITTIIOONN NNOOTTEESS::
NEW (3) 1 3/4" x 9 1/2" LVL BEAM 'A'
1
EXISTING
&
PROPOSED
PLANS699 PARK HILL RD.NORTHAMPTON, MA 01060Design + ConstructionBEHRENS/ROLOCUT RESIDENCE -KITCHEN REMODELCLIENT INFO:PROJECT:DRAWING TYPE:Design . Build . RemodelSHEET:
SCALE: AS STATED
ALL DRAWINGS, PLANS, & DESIGNS ARE PROPERTY OF THE TUCKER GROUP, LLC60 SCHOOL STREET, HATFIELD, CT 01038DRAWN BY: T. DADMUNDATE: 03/17/2015PERMITDRAWING PHASE: