Loading...
18C-042 2nd Floor Girder CalcsCS Structure™ 2.14.50 [Build 4] kmBeamEngine 4.13.4.1 Materials Database 1530 ContemporaryConservatoryRobert 9-25-15 7:11am 1 of 3 All product names are trademarks of their respective owners Copyright (C) 2015 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcG4 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 5.9 PLF Filename: C:\KMW\JOBS\ Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 7' 3.00" -142 -24 Live Replacement Uniform (PLF) Top 7' 3.00" 10' 6.00" -142 -24 Live 1 2 10 6 0 10 6 0 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Girder SPF Plate (425psi) N/A N/A 30# -802# 2 10' 6.000" Girder SPF Plate (425psi) N/A N/A 30# -802# Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Dead 1 -711# -90# 2 -711# -90# Design spans 10' 0.000" Product: 1-3/4x11-7/8 VERSA-LAM 2.0 3100 SP 1 ply PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 802lbs at bearing 1 and ensure that the structure can resist appropriately. Review gravity uplift reaction force of 802lbs at bearing 2 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 75.# 9574.# 0% 5.25' Total Load D Negative Moment 2007.# 10637.# 18% 5.25' Total Load D+L Shear 644.# 3948.# 16% 9.75' Total Load D+L TL Deflection -0.0739" 0.5000" L/999+ 5.25' Total Load D+L LL Deflection -0.0656" 0.3333" L/999+ 5.25' Total Load L Control: LL Deflection DOLs: Live=100% Snow=115% Roof=125% Wind=160% Minimum bearing length requirements at hangared connections depend on the connection style and are not included in this design. CS Structure™ 2.14.50 [Build 4] kmBeamEngine 4.13.4.1 Materials Database 1530 ContemporaryConservatoryRobert 9-25-15 7:11am 2 of 3 All product names are trademarks of their respective owners Copyright (C) 2015 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcG5 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 5.9 PLF Filename: C:\KMW\JOBS\ Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 3' 0.00" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.50" -53 -13 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.50" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.50" 40 13 Live Replacement Uniform (PLF) Top 3' 0.00" 7' 3.00" 27 7 Live Replacement Uniform (PLF) Top 7' 3.00" 12' 5.50" 27 7 Live Point (LBS) Top 0' 4.63" 89 0 Snow Point (LBS) Top 0' 4.63" 0 91 Live Point (LBS) Top 0' 4.63" 138 96 Live Point (LBS) Top 0' 4.63" 144 159 Live Point (LBS) Top 7' 4.50" -712 -50 Live 1 2 12 5 8 12 5 8 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall SPF Plate (425psi) N/A 1.500" 1364# -33# 2 12' 5.500" Wall SPF Plate (425psi) N/A 1.500" 736# -809# Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 -315# 89# 537# 2 -736# 0# 191# Design spans 11' 8.250" Product: 1-3/4x11-7/8 VERSA-LAM 2.0 3100 SP 1 ply PASSES DESIGN CHECKS NOTE: Pass-thru framing is required at point loads over bearings. Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 810lbs at bearing 2 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 2152.# 10637.# 20% 6.23' Total Load D+L Negative Moment 3137.# 10637.# 29% 7.37' Total Load D+L Shear 750.# 3948.# 19% 11.49' Total Load D+L TL Deflection -0.1370" 0.5844" L/999+ 6.23' Total Load D+L LL Deflection -0.1251" 0.3896" L/999+ 6.23' Total Load L Control: LL Deflection DOLs: Live=100% Snow=115% Roof=125% Wind=160% Point loads over bearings are NOT included in the Design calculations, but ARE included in the Reaction table CS Structure™ 2.14.50 [Build 4] kmBeamEngine 4.13.4.1 Materials Database 1530 ContemporaryConservatoryRobert 9-25-15 7:11am 3 of 3 All product names are trademarks of their respective owners Copyright (C) 2015 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcG6 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 5.9 PLF Filename: C:\KMW\JOBS\ Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 5' 2.50" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 9' 5.50" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.50" -53 -13 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.50" 40 13 Live Replacement Uniform (PLF) Top 5' 2.50" 12' 5.50" 27 7 Live Replacement Uniform (PLF) Top 9' 5.50" 12' 5.50" 27 7 Live Point (LBS) Top 5' 1.00" -712 -50 Live Point (LBS) Top 12' 0.88" 89 0 Snow Point (LBS) Top 12' 0.88" 0 91 Live Point (LBS) Top 12' 0.88" 206 96 Live Point (LBS) Top 12' 0.88" 144 159 Live 1 2 12 5 8 12 5 8 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall SPF Plate (425psi) N/A 1.500" 736# -809# 2 12' 5.500" Wall SPF Plate (425psi) N/A 1.500" 1432# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 -736# 0# 191# 2 -247# 89# 537# Design spans 11' 8.250" Product: 1-3/4x11-7/8 VERSA-LAM 2.0 3100 SP 1 ply PASSES DESIGN CHECKS NOTE: Pass-thru framing is required at point loads over bearings. Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 810lbs at bearing 1 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 2152.# 10637.# 20% 6.23' Total Load D+L Negative Moment 3137.# 10637.# 29% 5.08' Total Load D+L Shear 750.# 3948.# 19% 0.4' Total Load D+L TL Deflection -0.1370" 0.5844" L/999+ 6.23' Total Load D+L LL Deflection -0.1251" 0.3896" L/999+ 6.23' Total Load L Control: LL Deflection DOLs: Live=100% Snow=115% Roof=125% Wind=160% Point loads over bearings are NOT included in the Design calculations, but ARE included in the Reaction table