06 -057 Pages from 297 Haydenville plan set 2018-07-24PROJECT DESCRIPTION Construction of a new utilty building housing equipment for the generation of private utility electrical power PROJECT LOCATION ZONING DISTRICT: RR APPLICABLE BUILDING CODE: MA 780 CMR NINTH EDITION, 2015 IBC APPLICABLE ENERGY CODE: 2015 IECC CONSTRUCTION TYPE: 1B BUILDING HEIGHT: 100 FT GROSS BUILDING AREA: 2,454 SF BUILDING USE: Non-habitable tower with non-occupiable equipment platforms to be accessed by personnel for maintenance of utility systems. C COVER ARCHITECTURAL A-100 FOUNDATION & FIRST FLR PLANS A-101 ROOF & ROOF FRAMING PLANS A-102 TYPICAL FLOOR & FRAMING PLANS A-200 BUILDING ELEVATIONS A-201 BUILDING ELEVATIONS A-300 BUILDING SECTIONS A-400 WALL SECTIONS A-401 WALL SECTIONS / INTERIOR FRAMING ELEVATIONS A-500 DETAILS A-600 SCHEDULES INDEX OF DRAWINGS THOMAS DOUGLAS, R.A. MA THOMAS DOUGLAS ARCHITECTS, INC. STRUCTURAL ENGINEER: ISSUE DATE 196 Pleasant Street Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com ARCHITECT: GENERAL NOTES 1. Contractor shall verify all dimensions and take own measurements at the job site before commencing work. Advise architect of any error or discrepancy. 2. Contractor shall coordinate work of all trades, and installation of all equipment, items, or assemblies prior to commencing work. 3. Contractor shall locate all existing utilities in areas of work. If utilities are to remain, provide adequate means of support and protection during work. 4. Contractor shall consult and obtain permission from utility owners prior to commencement of work. Cooperate with owner and utility company in keeping respective services and facilities in operation. Repair damaged utilities to satisfaction of owner. Secure approval of connections to existing utilities from appropriate utility company and notify local authorities prior to covering. 5. Under no circumstances shall any trench required for utility connections, etc. outside the property line be without protective barricades nor be left open at the end of a day's work. 6. No open excavations shall be left open at the end of a day's work without adequate protective barricades to assure public safety. 7. Install and maintain adequate bracing or shoring required to prevent filling-in or cave-ins of adjacent materials at all times. 8. Remove all water and disturbed soil from excavations prior to commencing further work each day. 9. Contractors shall not damage the site beyond project limit lines. Any damage beyond project limit lines shall be repaired immediately to owners' satisfaction. 10. Contractor shall maintain structural integrity of project during construction through bracing, guy wires, etc. See structural for any additional notes. 11. Contractor shall perform work in accordance with all applicable federal, state, and local codes. 12. Structural drawings to be completed under separate contract by MA licensed Structural Engineer. 13. Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm drawings to be completed under separate contract per design-build contractors. 14. Cathodic protection by others. 15. Submittals to Architect for review and approval: Product data, shop drawings, manufacturer's color brochures of standard colors, for all items to be constructed into project. 16. Spray foam insulation shall include integral fire barrier or be protected with intumescent paint or other fire barrier approved by authority having jurisdiction. LOCUST MAP OR AERIAL IMAGE PROJECT OWNERS: 7/24/2018 Client: Mark Maynard Flooid Power Systems, Inc. 58 Water Street Holyoke, MA 01040 Carlo Schneller, PE, Senior Structural Engineer EDM Architecture Engineering Management 100 West Street Pittsfield, MA 01201 888-336-6500 http://www.edm-ae.com 2 07/07/18 SCHEMATIC DESIGN REVIEW 1 06/19/18 INITIAL REVIEW 3 07/24/18 PERMIT DRAWINGS New Construction FPS Tower 297 Haydenville Road Leeds, MA 01053 SITEProject Address: 297 Haydenville Road Architects, Inc. 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title project FPS TOWER 297 Haydenville Road Leeds, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North Sheet Title Scale: ##/##/#### SF TD 18-000 AS NOTED 2 07/07/18 SCHEMATIC DESIGN REVIEW 1 06/19/18 INITIAL REVIEW 3 07/24/18 PERMIT DRAWINGS BUILDING ELEVATIONS A-200 112.5° MIN. MIN. 4 1/8" MIN. 4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8" MIN. 4 1/8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. 4 1/8"4 1/8" Mechanical Level 1 -1" Bottom Of Base Plate 0" Mechanical Level 2 14'-8" Mechanical Level 3 28'-8" Mechanical Level 4 42'-8" W1 D2 D1 NORTH ELEVATION Scale: 1/4" = 1'-0"1 0 10 15 20 25 30 FT HEAVY DUTY ALUMINUM CAGED EGRESS LADDER AND PLATFORM WITH ACCESS AT EACH LEVEL. SUPPORT PER MANUFACTURER'S REQUIREMENTS.7'-8' ABOVE POINT OF ACCESS3'-6" TYP.VINYL SIDING AS SELECTED BY OWNER. COLOR: TBD ASPHALT SHINGLES AS SELECTED BY OWNER. COLOR: TBD SLOPE GRADE AWAY FROM FOUNDATION AT PERIMETER AZEK FASCIA BOARDS, TYPICAL. CONTINUOUS FLASHING AT TOWER / ROOF JUNCTURE Mechanical Level 1 -1" Bottom Of Base Plate 0" Mechanical Level 2 14'-8" Mechanical Level 3 28'-8" Mechanical Level 4 42'-8" EAST ELEVATION Scale: 1/4" = 1'-0"2 AZEK RAKE FASCIA AND RAKE BOARDS, TYPICAL. CONTINUOUS FLASHING AT TOWER / ROOF JUNCTURE 112.5° MIN. MIN. 4 1/8" MIN. 4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8" MIN. 4 1/8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. 4 1/8"4 1/8" Mechanical Level 6 70'-8" Tower Platform Level 84'-8" Ventilation / Window Level 89'-2 3/4" Top Plate 92'-0 3/4" W3 W3 L1 L1 ALUMINUM WIRE RAIL AND POSTS (WITH NO ACCESS TO TOWER PLATFORM LEVEL) COLOR: TBD ALUMINUM WIRE RAIL AND POSTS (WITH NO ACCESS TO VENT / WINDOW LEVEL) COLOR: TBD 25YR LOW-SLOPE STANDING SEAM METAL ROOF. COLOR: TBD 25YR LOW-SLOPE STANDING SEAM METAL ROOF. COLOR: TBD Mechanical Level 6 70'-8" Tower Platform Level 84'-8" Ventilation / Window Level 89'-2 3/4" Top Plate 92'-0 3/4" W3 W3 L1 L1 CURVED CORRUGATED METAL SIDING BY ATAS INTERNATIONAL OR APPROVED EQUAL. COLOR: TBD Mechanical Level 5 56'-8" 135°135°8"8"6'-10 5/8" TYP.Mechanical Level 5 56'-8" Architects, Inc. 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title project FPS TOWER 297 Haydenville Road Leeds, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North Sheet Title Scale: ##/##/#### SF TD 18-000 AS NOTED 2 07/07/18 SCHEMATIC DESIGN REVIEW 1 06/19/18 INITIAL REVIEW 3 07/24/18 PERMIT DRAWINGS BUILDING SECTIONS A-300 Mechanical Level 1 -1" Top Plate 9'-11"4'-0"BUILDING SECTION Scale: 1/4" = 1'-0"1 12 5 1 A-400 4 1/8" MIN. MIN.135° MIN. MIN. MIN. MIN. 4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8" MIN. 4 1/8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN.135°8"8" 8"8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. 4 1/8" MIN. Mechanical Level 1 -1" Bottom Of Base Plate 0" Mechanical Level 2 14'-8" Mechanical Level 3 28'-8"4'-8"TOWER SECTION Scale: 1/4" = 1'-0"3 TYPICAL MAINTENANCE UTILITY LADDER AT EACH LEVEL. BOLT TO FLOOR JOISTS AND TO WALL STUDS. 3 A-500 1 A-401 1'-0"1'-0" TYP.42" MIN.30" MIN. CLEAR 4 1/8" MIN. MIN.135° MIN. MIN. MIN. MIN. 4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8"4 1/8" MIN. 4 1/8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN.135°8"8" 8"8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. 4 1/8" MIN. Mechanical Level 6 70'-8" Tower Platform Level 84'-8" Ventilation / Window Level 89'-2 3/4" Top Plate 92'-0 3/4" 3 A-400 135°135°8"8"6'-10 5/8" TYP.Mechanical Level 1 -1" Bottom Of Base Plate 0" Mechanical Level 2 14'-8" Mechanical Level 3 28'-8"5'-0"BUILDING/TOWER SECTION Scale: 1/4" = 1'-0"2 0 10 15 20 25 30 FT CLOSED CELL SPRAY FOAM BETWEEN ALL ROOF TRUSSES AND LADDER FRAMING. FILL CAVITY. STEEL COLUMNS, GIRDERS, BEAMS AND CONCRETE FOUNDATION PER STRUCTURAL.135°135°8"8"6'-10 5/8" TYP.Mechanical Level 6 70'-8" Tower Platform Level 84'-8" Ventilation / Window Level 89'-2 3/4" Top Plate 92'-0 3/4"135°135°8"8"6'-10 5/8" TYP.Mechanical Level 4 42'-8" 4 1/8" MIN. MIN.135° MIN. MIN. MIN. MIN. 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" 4 1/8" MIN. 4 1/8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN.135°8"8" 8"8" MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. MIN. 4 1/8" MIN. Mechanical Level 5 56'-8"