06 -057 297 Haydenville Engineer Tower 2018-05-16April 19, 2018 Mark Maynard Flooid Power Systems, Inc. 58 Water Street Holyoke, MA 01040 Re: Tower Review for Sheathing Installation edm Project # FPS-4507 Dear Mark: As requested, edm has performed a structural review of an existing tower structure located at 297 Haydenville Road, Leeds, MA. The review of this structure relates to the proposed installation of a new sheathing enclosure. The existing tower is 88 feet tall and 18 feet in diameter. The structure consists of a two (2) inch diameter by ¼ inch thick wall structural tube legs. There is diagonal bracing forming a lattice/truss system around the perimeter of the structure. The foundation consists of eight (8) 24-inch diameter reinforced concrete piers and five (5) foot square reinforced concrete footings. It is proposed to provide a wood framed cladding* around the outside of the structure creating an enclosure that is 88 feet tall and 21+/- feet in diameter. The wood enclosure shall consist of the following: Wall framing consisting of 2x4 nominal wood studs installed at 16 inches on center with a ½ inch wood panel sheathing. The sidewalls shall be constructed in section with a maximum height of 14 feet and each wall section carrying a floor framing consisting 2x8 nominal wood joist. In addition, the existing floor framing of the tower structure shall be reinforced with two (2) steel joists, installed at 90 degrees to the wood joist, at each floor framing level spanning between the new wood wall sections. The wall sections shall be strapped together with steel strapping carrying uplift and lateral loads across the joints for the wall section. This shall include the floor sections across the adjacent wall sections around the circumference forming a continuous wall system. * The wood enclosure, new floor frame at 14 feet levels, and new foundation for the new enclosure design, and engineering has been prepared by others. The floor sections are only to facilitate access for maintenance of the proposed equipment. The proposed equipment is not to be supported in any fashion from the existing tower structure or the proposed wall sheathing or floor framing. April 19, 2018 Flooid Power Systems, Inc. Tower Review for Sheathing Installation edm Project # FPS-4507 Page: 2 of 2 The existing tower structure and the proposed wall and floor framing systems have been analytically evaluated for compliance with structural requirements of the 2015 International Building Code and the 9th Edition of the Massachusetts State Building Code. The analytical review was performed based on the following materials: Structural Steel Tubing – ASTM A500 Grade B. Miscellaneous Steel Components – ASTM A36. Wood Framing Elements – Spruce Pine Fir (SPF). Concrete 28 Design Strength – 3,500 psi. Reinforcement Steel Design Strength – 60,000 psi. Based on the frame and enclosure structure as described above, it is the opinion of edm that the existing tower frame structure is adequate to carry the additional loads of the framed wall sheathing with out any modifications. It should be noted that for the purposes of this review, the vertical loads from the new floor framing were transmitted to the new wall framing system and carried to the new foundation below. Only lateral loads were transmitted in the existing tower structure. Should the vertical floor loads be transmitted into the existing tower frame, the tower frame would require reinforcement. The existing foundations are adequate to carry the additional loads associated with the enclosure and floor framing. Feel free to contact edm with any questions or comments you may have. Sincerely, edm Carlo Schneller, PE, Senior Structural Engineer enclosure 20180417/cs