32C-149 Project Meeting Minutes 120828The Office of P E T E R F R O T H I N G H A M Registered Architect 181 Main Street, Suite One Northampton MA 01060 USA 413 585 5910 29-Aug-12 M E M O R A N D U M Re: McCarthy Properties Façade Reconstruction Subject: 28 Aug 12 Project Meeting Present: Name:Organization:Initials: Susan Hewett McCarthy Properties, Inc. SH Louis Gallinaro TCI LG Michael Fitzgerald TCI MF Chris Burkhardt TCI CB Ryan Hellwig RHPE RH Peter Frothingham PFRA PF ITEM DESCRIPTION ACTION PERSON NEW BUSINESS: 1 Meeting relocated to Watering Hole lounge PF to note in meetings that future meetings also relocated All 2 CB reports TCI has started mobilization, confirming existing conditions, beginiing layout for new roof support structure. None 3 Sidewalk removal scheduled to begin Thursday morning, begin at Beehive end, cutting for a few hours, removal follows. MF to arrange for TCI staff on hand to redirect pedestrians, SH notify tenants Wednesday MF, SH 4 Parking arrangements reviewed. TCI using McCarthy overflow parking lot, Zuli's lot, and street parking. MF indicates that TCI dump truck will overnight in McCarthy lot. SH will get recycling bins recently placed in front of jersey barriers relocated to create another parking space. SH 5 Installation of temporary protection walls is beginning. Due to need to cut gypbd in order to get attic beams in and still have maneuvering room, at first temporary walls in third floor apartment will be taped poly, once beam in place, then plywood temporary wall installed. CB will notify Northampton Coffee of temporary wall installation, probably Tuesday next week maybe the next day. SH to confirm notifiction w/ tenant CB, SH 6 CB reviewed roof support post details, RH confirms attachment at bottom of post on plate on existing 6x6 beam on masonry wall; splicing the post, stagger by a foot, close to floor or ceiling. CB & RH will review in field after meeting CB, RH Page 1 of 3 7 CB reviewed roof support beam bearing details. RH confirms not splicing the beam, beams begin and end on centerline of post, suggests lapping 2x6 down sides for lateral bracing and attachement; no bearing plate/saddle needed. None 8 CB points out there is barely enough room above third floor false ceiling and under attic ceiling joists for beams, both in terms of depth of beam and to accomdate out-of-level condition of existing building. Conclusion to keep as designed, slope beam to existing conditions. RH will determine allowable amount to be trimmed if/when necessary; confirms no saddle shop drawing submittal required. RH 9 CB indicates staging installation is scheduled to occur on Tuesday and Wednesday next week. MF notes this may slide a day or two, depending on foundation inspection requirements. None 10 TCI anticipates sufficient sidewalk removal Friday to provide three foundation inspection pits: 2'deep, 2' wide, and 3-5' long. CB will notify RH & PF when ready, RH will inspect and if needed indicate locations for further excavation and inspection. CB, RH, PF 11 MF explains once foundation trench is complete in an area, trench will be partially filled w/ membrane installed at an angle with excess collected above fill placed on top of membrane, to povide base for scaffolding. TCI to sumbit and PF to review membrane shop drawing immediately.TCI, PF 12 MF notified SH that McCarthy Properties or HPMG need to submit request to Gas Company for relocation of gas meters within next few weeks. SH to contact HPMG SH 13 PF & CB reviewed detail 6/A4.2 None 14 CB indicates single electrical outlet in basement is insufficient for temporary needs. CB will contact Beaulieu to arrange for temporary power from basement CB 15 EWS is removing baseboard heat at third floor apartment Wednesday. CB has reviewed with tenant. CB to confirm if this removes heating from entire apartment or just front rooms.CB 16 CB reports the dumpster will be placed in parking spaces in center of building day after scaffolding is complete. None 17 LG noted to SH that third floor tenant contacted TCI for an update, CB is in touch with him each day. None 18 SH announced that second floor apartment is rented as of 1 Sept.TCI to install temporary wall before move-in. CB 19 LG asked PF to review draft submittal schedule to confirm items needed.PF to review PF 20 PF reported that price quoted to Beaulieu for light fixture "A" is well over estimate provided by distributor in Boston. PF is attempting to contact distributor. PF suggested we may wish to consider an alternative approach, particularly if it coordinates with business tenants' requests for vertical signage above awnings. SH indicated McCarthys are not enthusiastic about banners. PF to follow up with distributor. PF Page 2 of 3 21 SH requested that when soil is removed for foundation inspection, samples be taken for submittal to Umass extension service for analysis to determine if there is something in soil that is killing trees in sidewalk. SH will coordinate w/ Bill McCarthy to be available on Friday with three buckets to receive samples. SH NEXT MEETING: 1pm, 4 Sep 12 at Watering Hole Please bring to the architect's attention errors or omissions in these minutes by replying all to this email within 48 hours. cc: Susan Hewett Louis Gallinaro Michael Fitzgerald Chris Burkhardt (via MF) Ryan Hellwig Louis Hasbrouck Peter Frothingham Page 3 of 3