Loading...
24D-001 LGA Office RenovationA.1012MULTIPUROPSE ROOM110LIBRARY111OFFICE115PRINCIPAL114STAFF PREP118CLASSROOM120MECH123OFFICE119STAIRWEST 1PANTRY?STORAGE?MEN105WOMEN104VESTIBULE102TUTORING112NEW 3-0 X 7-0 WD DOOR IN HM FRAMEALIGN WALL BETWEENEXISTING BORROWED LITESB1OFFICE115STORAGE?PANTRY?OFFICE115ANEW PARTITION WALLMTL RUNNERCEILINGB1203"41NONEU46501/2" GYPSUM WALL BOARD1/2" GYPSUM WALL BOARD16" O.C.3 5/8"3 5/8" MTL STUD16" O.C.MTL RUNNERRESILIENT SEALANTBOTH SIDES OFPARTITION4 5/8"NOTES1.2.3.4.ATTACH GWB LAYERS WITH BOARD LENGTH PARALLEL TOSTUDS.ALL GWB LAYERS ARE TO BE SCREWED AT 16" O.C. SPACING.USE FIBERGLASS TAPE AND JOINT COMPOUND TO FINISH GWBAPPLY SCHEDULED TILE ON TOILET ROOM SIDE WHENCONDITION OCCURSX1MAX HTGAUGEINSULSTCFIRE RTUL #REMARKS03 5/8" STUD RIGIDBRACE HEAD OFWALL IN BOTHDIRECTIONS8'-0" OCM A X 4 5 .0 0 °MAX45.00°DAVID WHITEHILL AIAdavidwhitehill@gmail.com347-514-256760 WASHINGTON AVENUENORTHAMPTON, MA 010607/18/2016 9:52:58 PMA.101As indicatedOFFICE RENOVATION PLANLander Grinspoon Academy257 Prospect StreetNorthampton MA 01060OFFICERENOVATION07/18/16 1/8" = 1'-0"1FIRST FLOOR PLAN 1/2" = 1'-0"2ENLARGED PARTIAL FIRST FLOOR PLAN 1 1/2" = 1'-0"3PARTITION B1 1" = 100'-0"4PLOT PLANZONING INFORMATIONPARCEL ID: 24d-001ZONING DISTRICT: URBLOT AREA: 154,638 SF(3.55 ACRES)NO CHANGE IN BUILDING USE, MASS, OR ENVELOPEOFFICE RENOVATIONLANDER GRINSPOON ACADEMYURB ZONING DIAGRAMSHEET LISTA.101 OFFICE RENOVATION PLANE.101 ELECTRICAL PLAN OFFICE115NEW DUPLEX RECEPTACLES;EXTEND OFF EXISTING CIRCUIT2' - 0"4' - 6"DAVID WHITEHILL AIAdavidwhitehill@gmail.com347-514-256760 WASHINGTON AVENUENORTHAMPTON, MA 010607/18/2016 9:52:58 PME.101 1/4" = 1'-0"ELECTRICAL PLANLander Grinspoon Academy257 Prospect StreetNorthampton MA 01060OFFICERENOVATION18 JULY 2016