Loading...
24D-070 2013_0222 Permit Set 10 of 19Install lights according toTenant's reflected ceilingplan.This wall can bedemolished. Does this need toweather treated? TT3"3"3"3"3"3"3"FIRE PROTECTION DEMOLITION PLANSCALE:18" = 1'-0"FIRE PROTECTION PLANSCALE:18" = 1'-0"GREAT CLIPS100H.C. BATHROOM101UTILITY ROOM102VACANT TENNET SPACE103104EXISTING STORAGE103105BATHROOM104107MECHANICAL106VACANT TENNET SPACE103104EXISTING STORAGE103105BATHROOM104107MECHANICAL106106BATHROOM105106BATHROOM105DN.DN.WD1DEMOLITION NOTES:EXISTING SPRINKLER SERVICE TO REMAINDISCONNECT AND REMOVE EXISTINGPENDANT SPRINKLER HEADDRAWING NOTES:PROJECT AREA: INSTALL NEW WET PIPE SPRINKLER SYSTEM IN THIS AREA.COORDINATE SPRINKLER HEAD LAYOUT WITH ARCHITECTURAL-CEILING & WALLPLANS, ELECTRICAL-LIGHTING PLANS & MECHANICAL-DUCTWORK & DIFFUSERPLANS. PROVIDE MASSACHUSETTS ENGINEERED PE STAMPED HYDRAULICCALCULATION, SPRINKLER PIPING, SPRINKLER HEADS, ESCUTCHEON COVERS ASREQUIRED BY NFPA. CONTRACTORS TO SUBMIT 6 SETS OF SHOP DRAWINGS FORAPPROVAL INCLUDING (1) COPY TO THE NORTHAMPTON FIRE DEPARTMENTGENERAL FIRE PROTECTION NOTES:1. CONTRACTOR SHALL VISIT SITE AND CAREFULLY EXAMINE EXISTINGCONDITIONS, BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIESAFFECTING EXECUTION OF WORK PRIOR TO SUBMISSION OF PROPOSAL.SUBMISSION OF PROPOSAL WILL BE CONSTRUED AS EVIDENCE OF A SITEEXAMINATION. LATER CLAIMS FOR EXTRA LABOR, EQUIPMENT OR MATERIALSREQUIRED FOR ENCOUNTERED DIFFICULTIES WILL NOT BE RECOGNIZEDBECAUSE CONDITIONS WERE PRESENT DURING SITE EXAMINATION.2. FIELD VERIFY EXACT LOCATIONS OF PIPING, STRUCTURAL AND ELECTRICALITEMS FOR COORDINATION OF WORK. SUBMIT COORDINATION DRAWINGS PERSPECIFICATIONS.3. CONTRACTOR TO DETERMINE PIPE SIZES BY HYDRAULIC CALCULATIONSBASED ON FLOW TEST DATA. INCLUDE HOSE STREAM ALLOWANCE INHYDRAULIC CALCULATIONS. PROVIDE SUBMITTALS ON PIPING SHOP DRAWINGSAND HYDRAULIC CALCULATIONS IN CONTRACT PRICE. INCLUDE WITHSUBMITTALS, SIGNED AND DATED PE SAMPED PIPING SHOP DRAWINGS ANDHYDRAULIC CALCULATIONS. PROFESSIONAL ENGINEER MUST BE LICENSED INSTATE. CONTRACTOR SHALL PERFORM A WATER FLOW TEST AND PAY FOR ALL4. SUBMIT COPY OF PE STAMPED SHOP DRAWINGS AND HYDRAULICCALCULATIONS TO OWNERS INSURANCE CARRIER FOR APPROVAL PRIOR TOSTART OF WORK.5. TAMPER AND FLOW SWITCHES SHALL BE PROVIDED AND INSTALLED BY THEFIRE PROTECTION CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.6. PROVIDE FIRE PROTECTION INSPECTORS TEST CONNECTION, PIPE AND DRAINTO OUTSIDE OF BUILDING PER AUTHORITY HAVING JURISDICTION AND WHEREREQUIRED. RELOCATE EXISTING INSPECTORS TEST AS REQUIRED7. CENTER SPRINKLER HEADS IN CEILING TILES, IN AREAS WITH SUSPENDEDCEILINGS8. PROVIDE SPRINKLER GUARDS FOR SPRINKLERS LOCATED IN STORAGE AREAS,JANITOR CLOSETS, MECHANICAL AREAS AND IN ALL OTHER AREAS WHERESPRINKLERS ARE SUBJECT TO CHANGE.9. PROVIDE PUMPER CONNECTION AS REQUIRED TO MEET NFPA AND LOCAL FIREDEPARTMENT REGULATIONS.10. PROVIDE EXPANSION JOINT ON STRAIGHT RUNS OF FIRE PROTECTION PIPEOR AT BUILDING EXPANSION JOINTS PER NFPA AND PER THE AUTHORITY HAVINGJURISDICTION REQUIREMENTS.11. PROVIDE ACCESS DOORS FOR VALVES LOCATED IN NON ACCESSIBLESPACES, INCLUDING INACCESSIBLE CEILINGS. ACCESS DOORS SHALL MATCHSURROUNDINGS ( COLOR BY ARCHITECT ) AND SHALL HAVE FIRE RATIING TOMATCH WALL OR CEILING SERVING.12. PROVIDE AUXILIARY DRAINS ON ISOLATED TRAPPED PIPING SECTION AS PERNFPA-13.13. PROVIDE NON-COMBUSTABLE SHIELD TO PROTECT ELECTRICAL EQUIPMENTFROM WATER DISCHARGE.14. SEISMICALLY BRACE AND SUPPORT PIPING.15. ROUTE ALL CONCEALED WET SPRINKLER PIPING IN HEATED AREAS.16. DO NOT INSTALL WET TYPE SPRINKLERS OR PIPING IN NON-HEATED AREASOR IN AREAS SUBJECT TO FREEZING.17. FIRE PROTECTION PIPING SHALL NOT RUN ABOVE ELECTRICAL SERVICECLEARENCE AREAS AND ELECTRICAL ROOMS.18. STORAGE ROOM LOCATIONS-PAINT 1" THICK LINE LOCATED 8'-0" ABOVE FINISHED FLOOR-PAINT STENCILED NOTE "NO STORAGE ABOVE RED LINE PER CODE" LOCATEBETWEEN CEILING AND 8'-0" PAINTED LINE ( LETTERS TO BE NO LESS THAN 4"HIGH AND 1" THICKNOT TO SCALEBRANCH LINEPIPE HANGERPROVIDE INVERTED "U" PIPECONNECTION EXTEND PIPE TOAVOID LIGHTS AND DIFFUSERSCEILING COVER PLATEPENDANT HEADFINISH CEILINGRECESSEDPENDANT HEADFT FEES ASSOCIATED WITHT HE FLOW TESTDrawing NumberDescriptionDateNo.Drawing TitleRevisionsDescriptionDateIssuesProject Manager:Issue Date:Key PlanProject No:10 9 8 7 6 5 4 3 2 1ABCDEFGHScale:SealsProjectConsultantNotice:This drawing is the property of Tecton Architects | inc Theuse, re-use or reproduction of this drawing for any purposewhatsoever without an expressed written agreementbetween Tecton Architects | inc and the user is prohibited.Rights to use the information on this sheet are nottransferred until payment has been received for servicesrendered. Any rights so granted are non-transferable toother parties without the prior expressed written consentof Tecton Architects | inc© 2012 Tecton Architects | incABCDEFGH10 9 8 7 6 5 4 3 2 1Project Architect:Production Leader:Peer Reviewer:OwnerFIRE PROTECTIONPLANSFP2.201