Loading...
10D-019 HERS-418 167 Main St TBCmm'' ENERGY STAR Qualified Homes Thermal Bypass Inspection Checklist Home Address. \ >\!\ck\C\ 1. _City: ^mV-State Thermal Bypass Inspection Guidelines Corrections Needed Builder Verified Rater Verified N/A r Overall Air Barrier and Thermal Barrier Alignment RequirerT>ent8: / Insulation shall tie installed in full contact With sealed interior and exterior air barrier except (or alternate to interior air barrier under item no, 2 (Walls Adjoining Extenor Walls or Unconditioned Spaces} All Climate Zones: 1.1 Overall Alignment Throughout Home • 1.2 Garage Band Joist Air Barrier (at toys adjoining conditioned space) 13 Attic Eave Baffles Where Vents/Leakage Exist • • • • • Only at Climate Zones 4 and Higher: 1.4 Slat>-edge Insulation (A maximum of 25% of the slab edge may be uninsulated in Climate Zones 4 pnri F, 't Best Practices Encourage 1.5 Air Barrier At All Band Joi • le Zones 4 and higher) 16 Minimize Thermal Bridging (eg,, OVE framing, SIPs, ICFs) • • • • • • Walls Adjoining Exterior Wails or Unconditioned Spaces Requirements: • Fully insulated wall aligned with air barrier at both interior and exterior, OR • Alternate for Climate Zones 1 thru 3, sealed exterior air barrier aligned w^th RESNET Grade 1 insulation fully supported • Continuous top and tx)ttom plates or sealed blocking 2.1 Wall Behind Show«r/Tub 2 2 Wall Behind Fireplace 2.3 Insulated Attic Slopes/Walls -^o^i.f sVti^P. j'-^ ^O^-^i 2,4 Attic Knee Walls 2,5 Skylight Shaft Walls 2,6 Wall Adjoining Porch Roof 2.7 Staircase Walls 2.8 Double Walls • • • • • • • • • a a • • • • • • Floors between Conditioned and Exterior Spaces Requirements: • Air barrier is installed at any exposed fibrous insulation edges • Insulation is installed to maintain permanent contact with sutj-tloor above including necessary supports (e.g., staves for blankets, netting for blown-in) • Blanket insulation is verified to have no gaps, voids or compression. « Blown-in insulation is verified to have proper density with firm packing 3 1 Insulated Floor Above Garage 3,2 Cantilevered Floor • • • • • Shafts Requirements; Openings to unconditioned space are fully sealed v/ith solid blocking or flashing and any remaining gaps are sealed with caulk or foam (provide fire-rated collars and caulking where required) 4.1 Duct Shaft 4.2 Piping Shaft/Penetrations 4.3 Flue Shaft • • • • • El GD • • 5. Attic/ Ceiling Interface Requirements: . All attic penetrations and dropped ceilings include a full interior air tsarrier aligned with insulation with any gaps fully sealed with caulK foam or tape » Movable insulation fits snugly in opening and air barrier is fully gasketed 5 1 Attic Access Panel (fully gasketed and insulated) 5,2 Attic Drop-down Stair (fully gasketed and insulated) 5.3 Dropped Ceiling/Soffit (full air tarrier aligned with insulation) 5.4 Recessed Lighting Fixtures (ICAT labeled and sealed to dryvt^ll) 5.5 Whole-house Fan (insulated cover gasketed to the opening) • • • • • • • • • • • • Common Walls Between Dwelling Units Requirements: Gap between drywall shaft wall (i e., common wall) and the structural framing between units is fully sealed at all exterior boundary conditions 6.1 Common Wall Between Dwelling Units • Home Energy Rating Provider ^^\N^\r Inspection Date: H ^ tb T Builder Inspection Date: '\\ Home Energy Rater Company Name: fipoer ''^•-y-^. ^-V-^^^^ COiN^\Vk':\B^ilder Company Name: E.0 CJc^zyvg^ CAR?CV)T<^T Home Energy Rater Signature: ^axru\. J^D^O_ Buikter Employee Signature: ^^^^^^ • •