Loading...
32C-058 2017_0420 061000-10 2nd Floor Wall Panels R1 - EXCERPTX3/01/17 Architect to verify alldimensions and elevations.*BKBWhere posts start on headers, verify thatbelow the post and above the header are fullyblocked. Typical at all similar conditions.GC to verify that all LVLs have beenprovided per contract documentsVerify that structuraldetails are followed.Note - At shear walls, verify panel edges arefully blocked per contract documents. Verifythat nails at intermediate supports havebeen provided per structural draiwngs2-2x10At stairs, provide P5post (coordinate withI-joist submittal)At stairs, provide P5post (coordinate withI-joist submittal))At stairs, provide P5post (coordinate withI-joist submittal)