Loading...
Revised and to address CBAC 2016.05.11_CBAC Live 155 Pres Final_reducedLive 155 155 Pleasant Street NORTHAMPTON, MA 5/11/2016 - ORDER OF CONDITIONS PRESENTATION Design Updates: Pleasant Street Elevation 2014 Submission 5 story building, 60’ tall 2016 Updated Design 4 story building, 51’ tall Design Updates: Pleasant Street Elevation 2014 Submission 5 story building, 60’ tall 2016 Updated Design 4 story building, 51’ tall Design Updates: Pleasant Street Landscape 2014 Submission 2016 Updated Design East Elevation: Pleasant Street East Elevation: Pleasant Street East Elevation: Pleasant Street Pleasant Street Landscape South Elevation: Manhan Rail Trail bike path West Elevation: Bike Path North Elevation: Courtyard East Elevation: Pleasant Street Landscape Illustrative Plan ADDITIONAL DRAWINGS Construction Drawings: Building Elevations Construction Drawings: Building Elevations Construction Drawings: Building Elevations Construction Drawings: Detailed Elevations Construction Drawings: Detailed Elevations