Loading...
Herrell's - Permit Set 12-28-15Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET EXISTING AND DEMO PLAN EX-101 DN DN CONFIRM REMOVAL OF VERTICAL PIPES REMOVE RAISED PLATFORM DEMO UPPER CEILING DEMO WALK-IN FREEZER DEMO UPPER CEILING REMOVE PARITIION WALL REMOVE PARITIION WALL EXISTING 21" PLATFORM TO REMAIN EXISTING 18" PLATFORM TO REMAIN CONFIRM EXISTING ELECTRIAL PANELS TO REMAIN CONFIRM EXISTING ELECTRIAL PANELS TO REMAIN REMOVE RADIATOR AND EXISTING BEADBOARD WALL REMOVE RAISED STAIRS DEMO BRICK TO CONNECT EXISTING WINDOW AND DOOR OPENINGS TO CREATE ONE LARGE OPENING REMOVE EXISTING WOOD DECKING AND FLOORING REMOVE EXISTING EXTERIOR WINDOWS REMOVE OVERHEAD DOOR EX. METAL PIPE TO REMAIN REMOVE CONC. AROUND PIPE EXCAVATE CONCRETE FOR GRADE BEAM & PIERS UPDEMO FACE OF WALL (STUDS TO REMAIN, IF POSSIBLE) DEMO DOOR AND PREP FOR INFILL EXISTING SEATING = 31 DN 6'-5.75" 7'-5" 8'-5.5" 6'-5.75" DEMO ALL SECOND FLOOR REMOVE EXISTING PIPE DEMO STAIRS EXISTING CIRCLE WINDOW TO REMAIN REMOVE EXISTING EXTERIOR WINDOWS REMOVE EXISTING INTERIOR WINDOWS OPEN TO BELOW OVERHEAD PIPES TO REMAIN OVERHEAD PIPES TO REMAIN EXISTING AND DEMO SECOND FLOOR 1/4" = 1'-0"1 EXISTING AND DEMO FIRST FLOOR 1/4" = 1'-0"2 Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET FIRST FLOOR PLAN A-101 DN DN D D D D D D D D 3'-0"STUD WALL, PLYWOOD, FRP (2 1/8”) ALLOW 2” ON ALL SIDES OF FREEZER TO ALLOW FOR IRREGULAR BRICK WALL 3'-6"11 1/8"WINDOW BLOCKING (FROM OUTSIDE): 1/2” PLYWOOD, 3-1/2” STUD WALL, 1/2” PLYWOOD, 3/32” FRP PAINT DARK BLUE (COLOR BY ARCHITECT) SEE DETAILS - A-302 UPNEW RAMP NEW DOORS D-01 GREASE TRAP RECESSED IN FLOOR 14” CLEARANCE REQ. EDGE OF FREEZER FLOOR BELOW FREEZER/COOLER TO BE RECESSED 4" 24" X 54" 24" X 54" 24"X27" 3/A-501 3/A-501 3/A-5013/A-501UP UP 24"X27"24"X27"NEW DOORS DNUP UPWALK-IN FREEZER D-04D-05 D-03 D-02 BUILT-IN BENCH BUILT-IN BENCH 1A-3023A-3022A-3028A-50 1 9 A-501 9A-501 FIRST FLOOR PLAN 1/4" = 1'-0"2 RETAIL FLOOR 2' 9" PLATFORM FLOOR 4' 6" KITCHEN FLOOR 0' 0" RAISE EXISTING 18” PLATFORM TO MATCH NEW 21” PLATFORM HEIGHT HYDRONIC HEATER/BLOWER GRILLES IN BASE OF PLATFORM FACE OF NEW WALL TO MATCH EXISTING WALL AT MEZZANINE LEVEL 12”x12” FLOOR DRAIN 12”x24” FLOOR DRAIN 11 A-501 7A- 5 0 1 10 A-501 12 A-501 12 A-501 PROPERTY LINE LOCATON OF HOOD EXHAUST, ABOVE METAL STUD WALL, 5/8” GYP, STAINLESS STEEL (EXTEND 12” MIN. EITHER SIDE OF HOOD) NEW PLATFORM AREA AT 21” AFF EXISTING TO REMAIN EXISTINGSTEPSSIDEWALK6 A-501 2 A-501 4 A-500 1 A-501 D-06NOTES: ALL SPACES TO HAVE SPRINKLER AND FIRE ALARM SYSTEM. NEW WINDOWS WITHIN 18" OF FINISHED FLOOR TO BE TEMPERED. STACK W/D DN UPDN STRUCTURAL BEAM - EDGE OF PERMANENT FLOOR WALK-IN COMPRESSORS BOILER AIR HANDLER 1'-2"MIN.TEMP. FLOOR BEYOND STRUCTURAL BEAM AIR HANDLER DN MEZZANINE FLOOR PLAN 1/4" = 1'-0"1 INFILL WINDOWS HOOD EXHAUST RISING THROUGH FLOOR LADDER TO UTILITY SPACE Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET REFLECTED CEILING PLANS A-110 SMOKE C1 C1 C1 C1 C1 SMOKE HS SMOKE HS EMERGENCYSMOKE EXIT EXIT P EXIT P FE P2 P2P2 P2 P2 P2 P2 F1 P2 P2 P2 EXIT P2 P2 P2 P2 P2 P2 P2 P2 P2 EMERGENCY 1/2” GYPEMERGENCY WALK-IN FREEZER STAIR HS P2 EMERGENCY SMOKE LIFE SAFETY NOTES EXISTING SPRINKLER SYSTEM TO BE RECONFIGURED AS NECESSARY TO COMPLY WITH CODES. 1. EMERGENCY GFI GROUND FAULT INTERRUPTER ***ALL SWITCHES & OUTLETS BY GC ELECTRICAL NOTES 1. 2. GENERAL CONTRACTOR TO COORDINATE LOCATION OF THERMOSTATS WITH HVAC SUBCONTRACTOR. DIRECT QUESTIONS TO DESIGNER. ELECTRICAL REQUIREMENTS FOR ELECTRICAL / TELEPHONE / SERVER CLOSET TO BE CONFIRMED WITH TENANT. TO PROVIDE AND/OR RELOCATE, AS REQUIRED. ALL EXITS DISCHARGES ARE REQUIRED TO HAVE FIRE PULL STATIONS. GENERAL CONTRACTOR REQUIREMENTS. GENERAL CONTRACTOR TO COORDINATE. SMOKE DETECTORS ARE REQUIRED AS PER THE LOCAL FIRE DEPARTMENTS 3. 2. LIFE SAFETY LEGEND HORN STROBE FIRE EXTINGUISHER STROBE WALL MTD. EMERGENCY LIGHTING WITH BATTERY PACK BACK-UP. SMOKE DETECTOR CEILING MOUNTED, EDGE LIT LED GREEN EXIT SIGN WITH BATTERY BACK-UP. ELECTRICAL LEGEND S SMOKE EXIT FE HS PULL STATION NEW EMERGENCY LIGHT/EXIT SIGN COMBO WITH BATTERY BACK UP P EXIT EMERGENCY s s 3 s M SWITCH (ALL LIGHT SWITCHES TO BE DIMMING) SWITCH - THREE WAY SWITCH - MOTION DETECTOR POS/TELEPHONE/DATA JACK OUTLET - DUPLEX OUTLET - QUAD *** ALL LIFE SAFETY FIXTURES BY GC tD FIRST FLOOR REFLECTED CEILING PLAN 1/4" = 1'-0"2 AIR DUCT EXHAUST HOOD ROUND SPIRAL DUCT GALVANIZED UNPAINTED FIBER CEMENT SOFFIT 9’-6” AFF D-06 7'-5 1/8" NOTES: ALL SPACES TO HAVE SPRINKLER AND FIRE ALARM SYSTEM. NEW WINDOWS WITHIN 18" OF FINISHED FLOOR TO BE TEMPERED.4'-0 1/8" 6'-4 1/2" EMERGENCY SMOKEC1 C1P2 P2 C1C1C1SMOKE HS HS EXIT EF STACKED W/D TOILET RM AIR HANDLER BOILER EMERGENCY WALK-IN COMPRESSORS AIR HANDLER C1 DN MEZZANINE REFLECTED CEILING PLAN 1/4" = 1'-0"1 EDGE OF HIGHER FLOOR EXHAUST FROM BATHROOM 8X10 NEW 24”X24” KITCHEN EXHAUST DUCT INTAKE FOR BOILER 6” DIA.EX. 7”X20” KITCHEN EXHAUST DUCT TO BE TIGHT TO CEILING EX. PIPES TO REMAIN ROOM AIR EXCHANGER 8X10 EXHAUST FROM DRYER 8X10EXHAUST FROM BOILER 6” DIA. EDGE OF HIGHER FLOOR EX. PIPES TO REMAIN Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET FLOORING PLAN A-120 NON-SLIP RUBBER TREADS SHEET VINYL 416 SQ FT CERAMIC TILE 181 SQ FT LVT, 200 SQ FT FLOORING KEY QUARRY TILE 443 SQ FT ** CONFIRM QUANTITIES IN FIELD TBA BY ARCHITECT EXISTING TO REMAIN D-01 FLOOR BELOW FREEZER/COOLER TO BE RECESSED 4"5' -0 " M IN . DN D-04D-05 D-03 D-02 NON-SLIP RUBBER TREADS SHEET VINYL 416 SQ FT CERAMIC TILE 181 SQ FT LVT, 200 SQ FT FLOORING KEY QUARRY TILE 443 SQ FT ** CONFIRM QUANTITIES IN FIELD TBA BY ARCHITECT EXISTING TO REMAIN5' -0 " M IN . DN FEFE FIRST FLOOR FLOORING 1/4" = 1'-0"2 ALIGN TO COUNTER AS BUILT D-06NOTES: ALL SPACES TO HAVE SPRINKLER AND FIRE ALARM SYSTEM. NEW WINDOWS WITHIN 18" OF FINISHED FLOOR TO BE TEMPERED. DN UPDN 1'-2"MIN.DN MEZZANINE FLOORING 1/4" = 1'-0"1 HOOD EXHAUST RISING THROUGH FLOOR Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET BUILDING SECTIONS A-3017'-6"± V.I.F.AA AAB C CCCCCCC D D D D DD WORK TABLE STOR. BINS REACH IN UNDERCOUNTER REFRIG.WORK TABLE W/BLENDER ICE CREAM HARDENER REACH IN FREEZER ICE CREAM MACH. HOSE REEL HAND/ UTIL. SINK BLAST CHILLER WORK TABLE W/SINK METRO SHELF CART CART BLODGETT OVENS HOBART MIXER ± 4'-1 1/8"SINKS, HOBART DISHWASHER, DRYING RACK 8'-6"7'-5 1/8"6'-4 1/2"WALK-IN FREEZER 4'-0"WINDOW INSERT - SEE 4/A-501 WALK-IN FREEZER AIR HANDLER AIR HANDLER EXISTING FLOOR EXISTING FLOOR HAND SINK 6'-4 1/2"AIR HANDLER COMPRESSORS FOR WALK-IN SUPPLY DUCT SUPPLY DUCT MAKE UP DUCTEXHAUST DUCTEXISTING EXHAUST DUCT - REROUTED 12'-5"8'-4 1/2"SECTION: EXTERIOR WALL AND WINDOW BLOCKING - SEE 3/A-501 FRP ON WALLS HOOD 11"7"TREADS - 11" TYP 16 RISERS @ 7" GOOSENECK EXTERIOR LIGHTS NEW DECORATIVE PVC CORNICE NEW FLAT PANEL SIDING PAINTED EXISTING PAINTED BRICK NEW MDO PANEL WITH PVC QUARTER ROUND SCOTIA & TRIM FUTURE SIGNAGE AREA CLEAR GLASS TRANSOM ABOVE PAINTED FIBERGLASS DOOR WITH FULL LIGHT. PANIC HARDWARE. MASONRY SILL WITH STUCCO FINISH. TEXTURE TO MATCH EXISTING SILL. FLAT PANEL INTERIOR PVC TRIM CLEAR STOREFRONT WINDOW 2'-9"INFILL WINDOWS CONNECT EXISTING DOOR OPENING BELOW TO WINDOW OPENING ABOVE INFILL DOOR OPENING BELOW STEPS - SEE SECTION 2/A-302 38”x11” VERTICAL CHASE 4” WASTE PIPE SECTION: SOUTH WALL 1/4" = 1'-0"1 SECTION: NORTH WALL 1/4" = 1'-0"2 INFILL WINDOWS NEW 4” CONC SLAB WITH THICKENED EDGES, WITH 2” RIGID INSULATION BENEATH & AT EXT. WALLS LEVEL EXISTING FLOOR TO BE FLUSH WITH GRADE AND SOUTH STREET ENTRYRFP ON WALLS INFILL EXISTING WINDOW - SEE 5/A-501 STAINLESS STEEL BEHIND OVENS EXTENDING 6” EITHER SIDE OF HOOD FRP ON WALLS NEW STAINLESS STEEL DIAMOND PLATE COVER FLUSH WITH NEW CONCRETE SIDEWALK BELOW WALK-IN -0'-4" FIRST FLOOR 0'-0" MEZZANINE 9'-3" ABOVE WALK-IN 12'-8" EX. CEILING 16'-8 1/8" FIRST FLOOR 0'-0" MEZZANINE 9'-3" REMOVABLE FL. 10'-3 5/8" EX. CEILING 16'-8 1/8" RETAIL FLOOR 2'9" FIRST FLOOR 0'-0" RETAIL FLOOR 2'-9" MEZZANINE 9'-3" REMOVABLE FL. 10'-3 5/8" EX. CEILING 16'-8 1/8" BELOW WALK-IN -0'-4" FIRST FLOOR 0'-0" MEZZANINE 9'-3" REMOVABLE FL. 12'-8" EX. CEILING 16'-8 1/8" EXHAUST FROM BATHROOM 8X10 INTAKE FOR BOILER 6” DIA. (THRU BRICK) ROOM AIR EXCHANGER 8X10 EXHAUST FROM DRYER 8X10EXHAUST FROM BOILER 6” DIA. NEW 24”X24” KITCHEN EXHAUST DUCT EX. 10” DIA. KITCHEN EXHAUST DUCT TO BE TIGHT TO CEILING EX. PIPES TO REMAIN EX. PIPES TO REMAIN RECESS FLOOR OF WALK-IN - FINISHED FLOORS TO BE FLUSH INFILL WINDOWS TO BASEMENT SURFACE LIGHT FIXTURES SURFACE LIGHT FIXTURES NEW 4” CONC SLAB WITH THICKENED EDGES, WITH 2” RIGID INSULATION BENEATH & AT EXT. WALLS LEVEL EXISTING FLOOR TO BE FLUSH WITH GRADE AND SOUTH STREET ENTRY EX. PIPES TO REMAIN 2 A-500 1 A-500 Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET BUILDING SECTIONS A-302 STAIRS (BEYOND SECTION PLANE) 2 1/8"3'-9 1/2"5'-10 1/4"2 1/8" 6"±4'-1 3/4"10'-0" WALK-IN FREEZER BLODGETT ZEPH-200E CAPTIVEAIR HOOD EXHAUSTS THROUGH TOP OF HOOD 18”X12” DUCT TO 2ND FLOOR WINDOW OPENING SURFACE MOUNTED PIPES (LARGEST @ 4” DIA.) 2 1/8” WALL (1 1/2” STUD, 1/2” PLYWOOD, 3/32” FRP) SURFACE MOUNTED PIPES (LARGEST @ 2” DIA.) HOOD EXHAUST VENT FIRST FLOOR 0'-0" RETAIL FLOOR 2'-9" ABOVE WALK-IN 12'-8" EX. CEILING 16'-1/8" MEZZANINE 9'-3" 2 1/8” WALL (1 1/2” STUD, 1/2” PLYWOOD, 3/32” FRP) SURFACE MOUNTED PIPES (LARGEST @ 4” DIA.) STAIRS LANDING CONNECTS TO RETAIL FLOOR STEPS TO RAISED FLOOR WALK-IN -0'-4" 10'-0" 2 1/8"3'-7 1/2"6'-0 1/4"2 1/8" TOP OF FRP WALL MATCH TO TOP OF LOWER SASH CONNECT WITH SILL/SHELF 1'-3" NEW INFILL WALL BENEATH STEPS THROUGH EXPANDED WALL OPENING 1'-6 1/8"2X6 JOISTS TO ACCOMMODATE HOOD 1” FIRE WRAP BEHIND AND OVER HOOD HOOD MAKE-UP AIR INTAKE SUPPLY DUCT HVAC OVEN NEW CONC. SLAB EXHAUST MAKE UP NEW CONC. SLABNEW CONC. SLAB EX. BRICK WALLEX. BRICK WALL EX. BRICK WALL SECTION: AT WALK-IN FREEZER 1" = 1'-0"1 SECTION: AT DOORWAY TO RETAIL SPACE 1" = 1'-0"2 SECTION: AT OVEN AND EXHAUST HOOD 1" = 1'-0"3 SOUTH ELEVATION 1/8" = 1'-0"4 NEW HOOD EXHAUST & MAKE UP AIR EXISTING PIPE PENETRATIONS NEW PENETRATIONSNEW PENETRATIONS Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET STOREFRONT DETAILS A-5004'-5 1/2"9'-11 1/4"15'-1 7/8"GOOSENECK EXTERIOR LIGHTS NEW DECORATIVE PVC CORNICE NEW FLAT PANEL SIDING PAINTED EXISTING PAINTED BRICK NEW MDO PANEL WITH PVC QUARTER ROUND SCOTIA & TRIM FUTURE SIGNAGE AREA CLEAR GLASS TRANSOM ABOVE PAINTED FIBERGLASS DOOR WITH FULL LIGHT. PANIC HARDWARE. MASONRY SILL WITH STUCCO FINISH. TEXTURE TO MATCH EXISTING SILL. FLAT PANEL INTERIOR PVC TRIM 5'-0 1/4"3'-2"1'-6"7'-0"3'-6"1'-3"1'-0"9'-7"CLEAR STOREFRONT WINDOW 6 3/4"ELEVATION @ SOUTH WEST CORNER STORE FRONT 1/2" = 1'-0"3 UP SLOPE FROM SIDEWALK TO DOOR (NO STEP)1A-3012A-3011A-5002A-500AIR HANDLER HAND SINK 6'-4 1/2"SECTION @ STORE FRONT NORTH Scale: 1/2" = 1'-0"1 CONCRETE FOUNDATION FIRST FLOOR 0'-0" RETAIL FLOOR 2'-9" MEZZANINE 9'-3" REMOVABLE FL. 10'-3 5/8" EX. CEILING 16'-8 1/8"FACE OF GRANITE AND BRICK PIER (HIDDEN) FACE OF EXISTING FACADE PAINTED MDO SIGN BOARD THERMALLY BROKEN STOREFRONT GLAZING & FRAME DOUBLE 2X8 HEADER, CLAD WITH PAINTED MDO 2X6 PT KNEE WALL, CLAD WITH PVC TRIM LINE OF EXISTING CEILING PAINTED PVC CROWN MOULDING GOOSENECK EXTERIOR LIGHTS - ON PHOTOCELL AIRSEAL & FILL CAVITY WITH CELLULOSE INSULATION - R-42 CONTINUOUS INSULATION, AIR SEALING AND VAPOR BARRIER ACROSS BASE OF SPANDREL COPPER FLASHING 1 S-101 X AIR HANDLER SECTION @ STORE FRONT SOUTH Scale: 1/2" = 1'-0"2 CONCRETE FOUNDATION FACE OF GRANITE AND BRICK PIER (HIDDEN) FACE OF EXISTING FACADE PAINTED MDO SIGN BOARD THERMALLY BROKEN STOREFRONT GLAZING & FRAME DOUBLE 2X8 HEADER, CLAD WITH PAINTED MDO 2X6 PT KNEE WALL, CLAD WITH PVC TRIM LINE OF EXISTING CEILING PAINTED PVC CROWN MOULDING GOOSENECK EXTERIOR LIGHTS - ON PHOTOCELL AIRSEAL & FILL CAVITY WITH CELLULOSE INSULATION - R-42 CONTINUOUS INSULATION, AIR SEALING AND VAPOR BARRIER ACROSS BASE OF SPANDREL COPPER FLASHING DN UPRAMP 1:12 LANDING UP RAMP 1:12 30'-0"5'-0"6'-0" STOREFRONT 1'-0"6'-2"4'-11 3/4"UP NEW RAMP 1/2" = 1'-0"4 TO HERRELL'S TO THORNES' SECTION: EXT. WINDOW BLOCKING AT FREEZER 1" = 1'-0"4 WINDOW SASH 1/2” PLYWOOD WITH 1/2” HOLES FOR VENTILATION PAINTED DARK BLUE (COLOR BY ARCHITECT) WALL OF WALK-IN FREEZER WINDOW SILL EX. BRICK WALL Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET DETAILS A-501 PLAN DETAIL: WALL & WINDOW BEHIND HOOD PLAN VIEW 1" = 1'-0"1 METAL STUDS 1-5/8”X3-5/8” 1/2” PLYWOOD WITH 1/2” DIA. HOLES FOR VENTILATION METAL STUDS 1-5/8”X3-5/8” 5/8” SHEETROCK 3/32” STAINLESS STEEL (BY EQUIP. SUPPLIER) 1” FIRE WRAP BETWEEN STUDS NOTE: STAINLESS STEEL TO EXTEND 6" MIN. BEYOND EDGES OF HOOD GREASE TRAP RECESSED IN FLOOR 14” CLEARANCE REQ. PLAN DETAIL: WINDOW BLOCKING PLAN VIEW 1" = 1'-0"2 2X4 STUDS 1/2” PLYWOOD 3/32 FRP 1/2” PLYWOOD WITH 1/2” DIA. HOLES FOR VENTILATION PAINTED DARK BLUE (COLOR BY ARCHITECT) SECTION: EXTERIOR WINDOW BLOCKING 1" = 1'-0"3 WINDOW SASH 1/2” PLYWOOD WITH 1/2” HOLES FOR VENTILATION PAINTED DARK BLUE (COLOR BY ARCHITECT) 2X4 STRUCTURE 1X SILL EXTENDING INTO WINDOW WELL - MATCH HEIGHT TO TOP OF LOWER SASH 1/2” PLYWOOD 3/32” FRP 4” PIPE (LARGEST OF PIPES SURFACE MOUNTED ON WALL) WINDOW SILL EX. BRICK WALL METAL STUDS 1-5/8”X3-5/8” 1” FIRE WRAP BETWEEN STUDS 5/8” SHEETROCK 3/32” STAINLESS STEEL SECTION: WALL AND WINDOW BEHIND OVEN 1" = 1'-0"5 EX. BRICK WALL D-01 ±2% - V.I.F.EX. SLOPED SIDEWALK0.000 0.000 0.000 -5.900 3.225 1.275 -0.525 ±2% - V.I.F.EX. SLOPED SIDEWALK0.000 0.000 0.000 -5.900 3.225 1.275 -0.525 PLAN DETAIL: STOREFRONT 1" = 1'-0"6 PROPERTY LINE NEW CONCRETE WITH STAINLESS STEEL DIAMOND PLATE COVER OVER EXISTING EMBEDDED PIPE FLUSH WITH CONCRETE STUCCO FINISH OVER CONC. FOUNDATION TO MATCH EXISTING NEW CONC. FOUNDATION NEW STOREFRONT9'-11"2 1/8"7 5/8"3'-6"1'-10"6 3/8"3'-0 7/8"2 1/8"1" 4 1/2" 9 1/2"1"4 1/2"2 1/2"3 1/2" 4 1/2" 3 1/4" SECTION: HALF WALL AT RAISED FLOOR 1" = 1'-0"10 6"1'-3"4'-0"1'-9"2'-7 3/4"1'-4 1/4"4 1/2"1'-7 3/8" SECTION: BENCH & RAILING AT RAISED FLOOR 1" = 1'-0"9 1'-9"3'-6"5'-3"4 1/2"1'-7 3/8"3'-3"SEE 12/A-501 FOR MATERIAL NOTES SECTION: STAIRS AT RAISED FLOOR 1" = 1'-0"81'-9"11"7"3'-6"4 1/2"1'-0"3'-3"SECTION: RAILING AT RAISED FLOOR 1" = 1'-0"7 5'-3"3'-6"1'-9"4 1/2"3'-3"SECTION: BUILT-IN BENCH AT WALL 1" = 1'-0"12 1x5 PAINTED WOOD CAP 1x4 HARDWOOD SEAT AND SEAT BACK STAIN AND SEAL AS SCHEDULED BY ARCHITECT PROVIDE HARDWOOD EDGING TO MATCH PAINTED WOOD APRON 4'-0"3'-4"1'-4"8"94°1 1/2" 3/4" PLYWOOD BACKING GALVANIZED STEEL BASE 79°3/4" PLAYWOOD BACKING AT SEAT AND BACK STRIP LIGHTING 1/2"SECTION: BUILT-IN BENCHES AT PLATFORM 1" = 1'-0"112'-8"1'-4"1'-9"1'-9"2'-8"1'-4"1'-6"6 1/4"1'-7" SEE 12/A-501 FOR MATERIAL NOTES Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET FIRST FLOOR PLAN EQUIPMENT & FURNITURE A-1001 DN DN TRASHTRASH 3'-6"11 1/8"D-01 FLOOR BELOW FREEZER/COOLER TO BE RECESSED 4" 24" DIA. 24" X 54" 24" DIA. 24"DIA. 24" DIA. 24" DIA. 24" DIA. 24" X 54" 24"X27" COFFEESERVICE 24"x72" 24" DIA.24"X27"24"X27"DN D-04D-05 D-03 D-02 BUILT-IN BENCH BUILT-IN BENCH UP UPUP FE 7 MagnaWaveTM E1 19 18 15 14 16 1288 22 23 21 24 26 27 28 36 39 43 38 30 29 42 34 35 41 29.1 29.2 40 44 45 40.1 46DAED FIRST FLOOR PLAN 1/4" = 1'-0"2 RETAIL FLOOR 2' 9" PLATFORM FLOOR 4' 6" KITCHEN FLOOR 0' 0"7A-501FACE OF NEW WALL TO MATCH EXISTING WALL AT MEZZANINE LEVEL 12”x12” FLOOR DRAIN 12”x24” FLOOR DRAIN D-06NOTES: ALL SPACES TO HAVE SPRINKLER AND FIRE ALARM SYSTEM. NEW WINDOWS WITHIN 18" OF FINISHED FLOOR TO BE TEMPERED. STACK W/D DN UPDN STRUCTURAL BEAM - EDGE OF PERMANENT FLOOR WALK-IN COMPRESSORS BOILER AIR HANDLER 1'-2"MIN.TEMP. FLOOR BEYOND STRUCTURAL BEAM AIR HANDLER DN MEZZANINE FLOOR PLAN 1/4" = 1'-0"1 INFILL WINDOWS HOOD EXHAUST KITTREDGE EQUIPMENT KEY Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title Herrell's Thornes Marketplace 150 Main Street Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 4/25/2014 Existing Sheet Title Scale: 12/28/2015 SL TD 14-006 AS NOTED 2 10/06/2015 SCHEMATIC LAYOUT 3 12/28/2015 PERMIT SET PERMIT SET FOUNDATION PLAN S-100 FOUNDATION PLAN 1" = 1'-0"1 NEW CONC. FOUNDATION COVERED IN STUCCO TO MATCH EXISTING TEXTURE PROPERTY LINE EXISTING MASONRY WALL EXISTING EMBEDDED METAL PIPE 4 S-100 2 S-100 3 S-100 EXISTING MASONRY WALL 1'-3"8"CONC. FOUNDATION AT DOOR 8" 3 1/2"3'-7 3/4"2'-4 1/8"5'-8"FOUNDATION SECTION WITH PIERS 1 1/2" = 1'-0"2 KNEE WALL BELOW STOREFRONT WINDOW CONC. FOUNDATION WITH STUCCO ON EXTERIOR TO MATCH ADJACENT BASE - SEE STRUCTURAL NOTES FOR REBAR 2” VERTICAL RIGID INSULATION EXISTING AND/OR CLEAN COMPACTED FILL NEW CONC. SLAB GRAVEL 20” X 12” CONCRETE FOOTINGMIN. 4'-0"FOUNDATION SECTION WTH PIERS 1 1/2" = 1'-0"3 KNEE WALL BELOW STOREFRONT WINDOW CONC. FOUNDATION WITH STUCCO ON EXTERIOR TO MATCH ADJACENT BASE - SEE STRUCTURAL NOTES FOR REBAR 2” VERTICAL RIGID INSULATION 20” X 12” CONCRETE FOOTING EXISTING AND/OR CLEAN COMPACTED FILL NEW CONC. SLAB GRAVELMIN. 4'-0"FOUNDATION SECTION WITH PIERS 1 1/2" = 1'-0"4 STOREFRONT DOOR CONC. FOUNDATION AT DOOR 2” VERTICAL RIGID INSULATION DOOR SILL EXISTING AND/OR CLEAN COMPACTED FILL NEW CONC. SLAB 20” X 12” CONCRETE FOOTING GRAVELMIN. 4'-0"