2018-10-31 AAB amendment letterOctober 31, 2018 To: Massachusetts Architectural Access Board, RE: Amendment Application Docket # V 18 236 Thornes Marketplace LLC 150 Main Street, Suite 310 PO Box 686, Northampton, MA 01061 E-mail: jon@thornesmarketplace.com Telephone: 413.582.9970 ext. 110 Architect for this submission to the: Thomas Douglas Architects 196 Pleasant Street Northampton, MA 01060 413-585-0641 douglas@tdouglasarchitects.com RE: Lower Level 2, accessible route to existing passenger elevator. Dear Architectural Access Board, Attached is an amendment to our variance request Docket # V18-236. On August 1, 2018 the Board denied our variance request and we requested a hearing to submit more information. However, this request should have been submitted as an amendment to our May 13, 2015 (Docket # V 14-347) decision. Since the time period for submission of an amendment to V 14-347 decision expired, we are asking the Board to allow us to reopen V 14-347 so that we can appeal and submit the enclosed amendment information regarding the variance request. We understand this requires a vote by the Board. A. Submission History: On May 22, 2012 (Docket # V 14-347) the Architectural Access Board granted a variance to modify a main public entrance from the adjacent city owned parking garage into the rear of Thornes. The project created a vestibule with double doors on each end. The doors are power operated and provide an easy access from accessible, covered parking spaces into the main level (level 1) of Thornes Marketplace. On May 13, 2015 (Docket # V 14-347) the Architectural Access Board granted 15 variances. Regarding the amendment in our new 2018 application, the variance granted in 2015 was: On level LL2 there is a public entry to the building from the adjacent exterior parking lot. This entry leads to a hallway with an existing elevator which accesses all floors above. (Floors LL2, LL1, 1, 2, 3). In front of this elevator is a ramp with slopes exceeding 521 CMR. The slope varies between 9.5% and 19%. The floor slopes up to the elevator threshold and thus there is no level area in front of the elevator. There is a cross slope of 8.3% on one side. The Board granted a 3-year time variance (by May 1, 2018) to bring this ramped area into compliance. On July 12, 2018 (Docket # V18-236) Thomas Douglas Architects submitted a variance request asking the board to eliminate the requirement to bring this ramp into compliance, IE, to accept the existing ramp in its non-modified condition. The request was accompanied by a description of hardship- stating that the resulting work bringing the ramp into compliance would create a safety hazard at the surrounding employee doors. Current: October 31, 2018 Amendment Request (Docket # V18-236). Thomas Douglas Architects and the Thornes Marketplace LLC would like to submit further evidence clarifying the above-mentioned hardship. B. General Building information: Thornes Marketplace is a downtown former department store situated on Main Street in Northampton, MA. It was constructed as a small single merchant store and thru many additions over the course of 100 years, grew to a 76,000 square foot, 5 story building housing multiple retail and office tenants with entrances on 3 different facades at 3 different levels. It has a maximum occupancy of 380 people. There is a public elevator accessing all 5 levels of the building (LL2, LL1, 1, 2, 3). In the 1980’s the City of Northampton constructed a 4-story parking garage behind Thornes with a bridge connecting the two structures on Level 1 of Thornes for direct accessible entry. Additionally, there is 1 accessible entrance at Main Street (at grade), one accessible entry and one non-accessible entry on the rear parking garage side (at grade and via stairs), one non-accessible entry on an adjacent side street (via stairs). Level LL2 1) This is the lowest level of the building and is accessed on the rear façade of the building and from stairs/elevators above. There is an accessible public entry here into a hallway and stair. The existing elevator is accessed via a long hall that ends in an existing non-compliant (too steep) floor ramp up to the elevator entry. The passenger elevator measures 51 inches by 81 inches. 2) This entry functions as the main delivery area for all building tenants There is a freight elevator down the hallway near the passenger elevator. 3) This is a lightly trafficked public entry and is near a parking lot and garage. 4) This entry is adjacent to the 4-story city parking garage. The exterior entry to Thornes at this location is 173 feet or 53 steps from an elevator in the neighboring parking garage. 5) Our request, involving constraints to making this ramp compliant, are outlined below in section 2. Level 1 1) Also, on the rear façade of Thornes, two levels above LL2, there is a highly trafficked public entry (an enclosed bridge) to Thornes from the adjacent city parking garage. There are multiple accessible parking spaces next to the walkway to Thornes. This is the shortest and most direct route from Thornes to public parking spaces and it is constantly used for public entry. 2) There is an existing accessible front double door from the Main Street sidewalk to Thornes on this level. This entry accommodates more traffic than any other entry in Thornes. There are accessible parking spaces on Main Street near Thornes. C. Constraints, Why compliance is impracticable. Lower level 2, Accessible route from exterior entry door to existing passenger elevator: Ramp at Elevator. 1) In our 2014 variance request, we originally thought we could extend the ramp leading to the elevator in this area We would create a new floor with a lower slope and have a compliant ramp. To create an accessible route to the elevator, we need a longer ramp in this hallway; however, there are multiple doors in the hallway which severely limit a longer ramp in any location. With detailed investigations and closer consultation with the Thornes staff, we found that compliance is impracticable due to building elements that we are unable to alter. They are: 2) Boiler room door. This door allows access into the boiler room and is adjacent to the mechanical room. It looks like you could gain access thru the Boiler room into the mechanical room and avoid the problem stated above, however this is not possible. The main electrical service equipment in this room prevents us from installing a new door leading to the mechanical room. 3) Janitor Closet door. This door would not be negatively affected by a ramp in front of it. 4) Freight Elevator door and freight elevator machine room doors. A ramp cannot be placed in front of these doors. A ramp would require the freight elevator cab and door to be raised. Currently the door head has steel framing around it and it would be cost prohibitive to alter if the floor was raised for a ramp in front of it. See photo C. 5) Mechanical room door: If we extended the ramp to make a lower slope, a dangerous condition for employees would be created at the mechanical room door and steps. i) The ramp would pass in front of the mechanical room door and be a sloping stepped entry to this already steep mechanical room stair. The existing stair inside the mechanical room cannot be moved because of the boiler room location and multiple mechanical systems. ii) Originally, we felt this would not be a problem, however the owner realized that there is constant foot traffic to this mechanical and storage area by the building staff. The trade-off for making a more accessible and safer entry to the elevator was the creation of a dangerous condition for the staff. iii) The owner decided this was not an acceptable risk for the employees. The owner’s opinion was that the benefits for improved safer accessibility were outweighed by the sacrifices to employee safety. iv) We feel that there are other options outlined below that would maintain a safe accessible route to the upper floors. Therefore, we would like to amend our 2014 promised work for this area and ask that we be allowed to keep the non- compliant existing conditions in place. v) The existing conditions at this ramp do not comply with MAAB sections: (1) 20.1 lack of compliant accessible route (2) 24.2.1 Lack of compliant ramp slopes (3) 24.4.5 Non-compliant ramp landings D. Solutions Since it is impracticable to locate a new longer ramp in the hallway to this LL2 elevator we would like to request relief from the accessibility requirements here. We can however make viable improvements. 1) We propose adding way-finding signage at this exterior Thornes entry. The public elevator in the neighboring garage is easy to access and there is direct entry from the garage exterior which is the side facing Thornes. There is no vestibule or building door to go through. The walk to the garage elevator is on a flat concrete sidewalk and is almost visible from the Thornes entry. From the lower level Thornes exterior entry, we could easily direct people to the garage elevator and they can go up 2 levels to enter Thornes thru the accessible bridge connecting the two buildings. We can add signage at multiple locations around the rear of Thornes directing people to the garage. Please see the attached site plan for signage locations. 2) We propose the installation of a continuous handrail on one side of the ramp (the inside and shortest path to the elevator), and another handrail (not continuous) on the opposite wall. See drawings. 3) We propose painting the floor a lighter color so that the sloping areas are more visible. We will also a more extensive walk off mat that covers the smooth surface of the existing concrete floor. We feel a more textured surface will give a wheel more grip. E. Work completed since the 2012 request. 1) All accessibility upgrades that have been promised to the board have been completed with the exception of reconfiguring the level 2 Women’s bathrooms to make them accessible. We ask for 1 more year to complete this work. 2) Additional accessibility upgrade: In 2014 we requested a variance for a non- accessible, stepped route to the Men’s bathroom on the main level 1. The variance we requested is not required. We decided to remove the floor in this area to examine the underlying structure and found that we could ramp this area of floor allowing a compliant ramped entry to the Men’s bathroom. This was an expensive reconstruction but resulted in an important accessibility upgrade to the heavily used bathrooms on this main level. Thank you for your consideration of this proposed amendment. Tom Douglas Thomas Douglas Architects 196 Pleasant Street Northampton, MA 01060 413-585-0641 douglas@tdouglasarchitects.com