Big Y World Class Market Site Northampton MA Meeting Minutes #32 dated 5-29-07 FINAL AR 6-4-07BIG Y WORLD CLASS MARKET / SITE IMPROVEMENTS
Hamp Plaza
142 – 188 North King Street
Northampton, MA 01060
cm&b Project #06349
Meeting Minutes #32
May 29, 2007
Attendees:
Frank Coe – Big Y Frank Aniello – E&K John Chatfield – cm&b
Joe Venie – cm&b Steve Follett – Gagliarducci Bill Kilpatrick – Bennington
Andrew Kahl - Champagne Tony Karella – Boulanger Bruce LaPan – A. Duquette
Ivan Yuen - Berkshire Bob Cadwallader – AIPC Steve Dagnese – CEC
cm&b Superintendent – John Chatfield Phone: (413) 582-0223 Fax: (413) 582-6109
Cell: (508) 509-7673
All field direction and communication must be addressed through John Chatfield.
Next Project Meeting Is Tuesday, June 5th.
9:30 am - Big Y Market / Site Meeting
All subcontractors with work ongoing or started/completed within one week of this meeting are required to attend.
CURRENT PROJECT STATUS
Site:
Binder pavement Phase I – complete.
Site lighting conduits – ongoing.
Prep grading work Phase II.
Big Y Market:
Decking and detail work – on-going.
Lintel clips – ongoing.
HVAC curbs layout – ongoing.
Form vendor ramp – ongoing.
Plumbing underground – ongoing.
Wood blocking roof – ongoing.
Duct hangers in palce.
Prep mezzanine slab.
Roof installation – ongoing.
Excavate and backfill plumbing – on going.
Electrical rough pipe mezzanine slab.
Refrigeration underground – on going.
Brick veneer “H” line – on going.
Layout storefront framing – on going.
SCHEDULE MILESTONES
Place mezzanine slab Wednesday, 5/30
RTU delivery Monday 6/18
Binder Phase II Tuesday, 6/19
Roof Weather tight Friday, 6/1
Slab #1 Prepared Foods Wednesday, 6/13
HARD HATS ARE REQUIRED
FOR ALL CONSTRUCTION PERSONNEL AND SITE VISITORS.
SAFETY
cm&b Safety Policies:
Written safety manual and applicable MSDS information to be provided to project superintendent prior to start of work and/or delivery of materials.
A SAFETY VIOLATION PENALTY POLICY IS IN EFFECT ON THIS PROJECT. ANY VIOLATION OF O.S.H.A. SAFETY REQUIREMENTS IS SUBJECT TO THE FOLLOWING ACTIONS:
FIRST VIOLATION – VERBAL NOTICE. EMPLOYEE RETRAINING REQUIRED.
SECOND VIOLATION – WRITTEN NOTICE. EMPLOYEE RETRAINING REQUIRED.
THIRD VIOLATION – $100 FINE TO THE COMPANY OF THE EMPLOYEE RESPONSIBLE. RETRAINING REQUIRED.
FOURTH VIOLATION – EMPLOYEE PERMANENTLY REMOVED FROM SITE.
Violations Assessed Within The Last Week: None.
Hardhats, shirts, long pants and work boots are required by all construction personnel through project completion.
All Subcontractors are required to hold weekly employee safety meetings (“Tool Box Talks”). Foreman must submit a copy of topic discussed, with signatures of employees in attendance,
to cm&b superintendent by Friday, 12:00 noon each week.
Weekly Safety Discussion: SLIP AND FALLS
Injury, accident, damage, theft or any other incident must be reported immediately to cm&b superintendent. NO EXCEPTIONS.
First Aid station located in cm&b field office.
cm&b Loss Control Guidelines.
GENERAL ITEMS
1/9 City Engineer to approve / sign off for new sewer pump station.
3/27 Complete submittal due in on 4/17 – pump information.
4/17 Jim Laurila email response, City is still reviewing revised pump design drawings.
5/8 Left message for drawing review update.
5/15 Called Jim’s office again – left message.
5/22 Meeting with city engineer Jim Laurilla scheduled for June 5th at 11:00 am.
ACTION BY: E&K
5/1 Appears new site grades at northeast corner site is higher than adjacent Sleepy’s property.
5/8 Provide spot grades of existing pavement and forward to E & K as soon as possible.
5/15 Heritage Survey to provide electronic “TOPO” of existing conditions to be forwarded to E & K.
5/29 Sketch sent to Gagliarducci for pricing.
ACTION BY: HERITAGE SURVEY
PERMITS
12/5 Traffic signalization plans are currently being evaluated by Mass Highway District 2 for approval.
4/10 Mass Highway is reviewing revised plans now.
5/1 Mass Highway issued 100% review comments. Edwards & Kelcey to revise drawings and submit for approval.
5/8 Final Mass Highway review drawings are updated and will be issued back to Mass Highway for record.
5/15 Final drawings went back to Mass Highway last week.
1/30 District 2 (District Permit Engineer Kenneth J. Crochiere (413) 582-0535) Traffic Signal Plan submittals review comments:
1/9 Traffic warrant for Cooke Ave. and Hatfield Street will add 4 way stop sign. Still needs city approval.
4/10 E & K to submit final drawings Monday, 4/16.
4/24 Cooke Avenue drawings currently being reviewed.
5/1 Need follow up call to City Engineer on drawing review status.
5/15 Left phone message for City Engineer last week.
5/15 E & K schedule meeting with City Engineer for Tuesday, June 5th at 11:00 PM.
ACTION BY: E & K
PERMITS (continued)
3/27 E&K to provide update for Cooke Ave. sidewalk widening design drawings (Bridge St – Hatfield St.)
4/17 Cooke Avenue revised drawings need City approval.
5/8 City Engineer has not reviewed drawings as yet.
5/15 Left message for Jim Laurilla for update.
5/29 City issued memo outlining comments relative to Cooke Ave. sidewalk. Need to address city concerns at meeting next Tuesday.
SUBMITTALS
Big Y World Class Market Pending Submittals:
DESIGN
Current drawing rider is attached. All subcontractors please verify current drawings for field and office use. All cost issues must be documented and quantified with labor and material
breakdowns. Updated drawings are available through Service Point, Woburn, MA (781) 933-8700 phone / 781) 935-3926 fax.
5/29 QC room is deleted; mezzanine layout per drawing bulletin #2 layout will be followed.
ACTION BY: CHAMPAGNE DRYWALL
RECORD DRAWINGS
Mark-up plan set is in field office for all trades. Record drawings must be updated weekly. CLEAN, MARKED-UP PLANS ARE REQUIRED.
SCHEDULE AND PHASING
3/6 Expedited Big Y Construction Schedule Rev. 3 dated 1/9/07. (Substantial completion – turn over date October 26, 2007)
5/22 Big Y provide F1 plan marked up with equipment delivery dates.
SECURITY
SIGNAGE
5/29 Provide pylon sign shop drawings for coordination.
ACTION BY: BIG Y
TESTING
UTILITIES
ELECTRIC:
MASS ELECTRIC (contact is Rogers Canoville (413) 582-7473).
Service to new Big Y:
Work order has been initiated.
Loads are based on Big Y – Ellington, CT.
1/9 Mass Electric issued service request numbers:
Temporary electrical service (construction) - #423031
Permanent electrical service (Big Y) - #287505
1/9 Mass Electric meter department contact – Bob Noel (413-582-7493). The following needs to be re-confirmed by Mass Electric.
Meter socket will be located on transformer not switch gear in building.
“Hot” sequence metering, CTs, PTs and meter provided by Mass Electric.
Provide communication wire required for transformer.
5/21 Need date for temp service power turn on.
ACTION BY: CEC
WATER:
5/8 Need to set date for water service work on Route 5.
5/22 Correction water connection at Pine Brook Curve.
ACTION BY: GAGLIARDUCCI
5/15 Need temporary construction water feed reconnected for masonry.
5/22 Add dual value for second hose connection.
ACTION BY: BOULANGER PLUMBING
PHONE:
VERIZON (contact is Fran McManus (413) 247-0560).
5/29 Confirm that Mass Electric called Verizon to set up date for relocation of overhead wires behind Big Y Building.
GAS:
9/14 Gas company contact is Bay State Gas (413) 788-9200.
5/8 Need to schedule meeting with Bay State Gas for new gas service work.
5/22 Gas company looking into new 2” service feed Cook Ave. behind retails to new Big Y.
5/22 Gas service agreement requires Big Y signature and deposit check as soon as possible.
ACTION BY: cm&b
UTILITIES (continued)
SEWER:
ABATEMENT
DEMOLITION
SITE WORK
3/27 Draft paving sequence for review and discussion by next meeting.
5/1 Set up paving meeting – Warner Bros. paving this week.
5/8 Draft paving schedule this date.
5/15 Paving schedule drawing to be posted in field office.
ACTION BY: GAGLIARDUCCI
5/22 Prepare area behind building compactor pad as soon as possible.
ACTION BY: GAGLIARDUCCI
5/29 Coordinate precast light pole bases – ship anchor bolts direct.
ACTION BY: GAGLIARDUCCI / CEC
5/29 Move storage trailer and equipment off Sleepy’s property.
ACTION BY: GAGLIARDUCCI
LANDSCAPING
BUILDING EXCAVATION
5/22 Pre Concrete Slab Meeting
Attendees:
Frank Coe – Big Y Frank Aniello- E&K Joe Venie – cm&b
John Chatfield – cm&b Ralph Olds – Construction Services John Frances – Pioneer Valley
Zack Borriasov – Apex Walter Verbork – Apex Karim Lakhani – Apex
Luigi Fusco - UTS
Minimum 1” concrete cover over electric walker duck.
Email mezzanine slab concrete mix design for the A/E approval by end of day.
ACTION BY: CONSTRUCTION SERVICE
Submit floor hardener alternate material manufacture than specified product.
Boulanger to verify plumbing drains and clean out cover elevations prior to slab placement
Saw cut “pin wheel” slab at columns.
Provide light tower for mezzanine slab placement.
F.F. and F.L. readings will be taken by Pioneer Valley but are not for record.
Fiber mesh is required in all slab on grade placements. Both Construction Service and UTS will verify fiber mesh in concrete mix at time of all slab placements.
Cure sealer will be used as slab curing method. Pioneer Valley to submit cure sealer manufacture for approval.
Mezzanine slab schedule moved to Wednesday May 30th (weather permitting).
CONCRETE
5/15 Form farmer’s pit for Monday, 5/21.
5/29 Week of 5/29.
ACTION BY: PIONEER VALLEY
PRE-CAST CONCRETE
5/15 Embedded plates for girder support “knife” connections are missing. cm&b to follow up with Fabcon ASAP.
5/22 Fabcon panels were not designed for bottom cord girder “knife” connections.
5/29 Fabcon requires girder end cards connected so bottom cord “moment” does not take place. Fabcon and Bennington to coordinate issue.
ACTION BY: BENNINGTON
MASONRY
5/29 Need temporary power for mason’s saw.
STRUCTURAL
5/15 Embedded “knife” plates for girders locations missing.
5/22 Bennington and E&K working on solution.
5/29 Bennington and Fabcon to review.
ACTION BY: E&K / BENNINGTON
5/29 Hoist beamivat installed. Mechanical mezzanine is too long. cm&b to do RFI to E&K for direction.
ACTION BY: BENNINGTON
MISC. METALS
CARPENTRY
ROOFING
CAULKING/SEALANTS
5/29 Need to release caulking contractor for submittals.
ACTION BY: cm&b
DOORS/WINDOWS
5/8 Need doors / frames / hardware submittals as soon as possible.
5/29 Submittals due this week.
ACTION BY: DAVID HORWITZ ASSOCIATES
5/29 Door frames are due on site within two weeks.
ACTION BY: cm&b
ALUMINUM STOREFRONT
AUTOMATIC DOORS
5/29 Verify that all hardware mounted on swing doors are “bone white.”
ACTION BY: AUTOMATIC DOORS
DRYWALL
5/29 Building Inspector requires a 24 hour notice for inspection.
ACTION BY: CHAMPANE DRYWALL
5/29 Exterior frame material is due today.
ACTION BY: CHAMPAGNE DRYWALL
FLOORING
CEILINGS
PAINTING
5/1 Need paint “swatch” samples, wallcovering and paint material data submittals as soon as possible.
ACTION BY: BARBIERI PAINTING
SPECIALTIES / MISCELLANEOUS ITEMS
5/15 Vierfy mezzanine floor hatch delivery date.
5/22 Floor hatch ship date Thursday, May 24 via UPS freight.
5/29 Floor hatch delivery delay due to holiday, slab will be bond out hatch install at a later date.
ACTION BY: cm&b
LOADING DOCK EQUIPMENT
5/8 Need loading dock submittals as soon as possible.
ACTION BY: FROMMELT DOCK & DOOR
FIRE PROTECTION
5/22 FM Global requirements for sprinklers densities will be achieved at no additional cost.
ACTION BY: HFP
PLUMBING
5/22 Need roof drains coordinated with roofing work next week. Piping will need to be installed so water run out of building.
ACTION BY: BOULANGER
5/22 Indirect plumbing pipes affected by rain last week were removed and reinstalled on dry compacted soil.
ACTION BY: BOULANGER / GAGLIARDUCCI
5/29 Coordinate layout changes on bathrooms per SKP-2 dated 5/23/07.
ACTION BY: BOULANGER
5/29 Standard water cooler will be used as per the original plumbing submittal.
ACTION BY: BOULANGER
HVAC
5/29 Duct conflict with ceiling heights in sales area is being reviewed by E&K. Sales duct install work on hold until further notice.
ACTION BY: BERKSHIRE
REFRIGERATION
5/29 (3) copies of updated refrigeration pit plan will be sent overnight to A. Duquette at cm&b field and office for Thursday.
ACTION BY: E&K
ELECTRICAL
5/29 Schedule electrical underground for prepare foods as soon as possible.
Equipment Ship Dates:
Square D – SB-A – QED Stitchboard 6/20/07
Square D – SF – NQOD MB Panelboards (INT) 6/4/07
Square D – BK – NQOD MB Panelboard (INT)-A 6/25/07
Square D – Dishwasher – HU363DS 5/30/07
Square D – Dishwasher – HU362RB 5/22/07
Square D – CT Pump – H361RB 5/17/07
Square D – BK – Special Panelboard Enclosure 5/29/07
Square D – BK – Special Panelboard Trim 6/19/07
Square D – BK – NQOD MLO Panelboard (INT)-B 5/29/07
Square D – OS – MH62 (BOX) 5/13/07
Square D – PR – Special Panelboard Enclosure & Trim 5/11/07
Bussmann – FRSR60 5/14/07
WAJA – Contactor Cabinet #8 ON HOLD
WAJA – Contactor Cabinet #5 ON HOLD
WAJA – Contactor Cabinet #2 ON HOLD
TELEPHONES / CAT 5
SECURITY SYSTEMS
EQUIPMENT LIST
Equipment Delivery Dates
Refrigerate Case Deliveries
Beer 9/10/07
Frozen Food 9/10/07
Dairy 9/10/07
Meat 9/10/07
M.D. Produce 9/12/07
Cheese 9/12/07
Seafood 9/12/07
Service Deli 9/12/07
Bakery 9/12/07
Floral 9/12/07
Island Produce 10/8/07
Multi Deck Produce 10/8/07
Departments
Sinks TBD
Mechanicals / Misc. Equipment TBD
Pizza Oven TBD
Bakery Oven TBD
Bakery Proofer TBD
Cooler Shelving TBD
Stainless Steel Tables / Cabinets TBD
Non Mechanical Equipment TBD
Supply / Purchasing / Small Wares TBD
Major Mechanical Equipment
Motor Control Center TBD
Munters
Curbs Tue, 6/5/07
RTU’s Mon, 6/18/07
Evaporation Coils TBD
UPS TBD
Lighting Package TBD
Dawtech Air Door TBD
Aip Cooler and Freezer Boxes
Bakery Retarder 6/18/07
Bakery Freezer 6/18/07
Deli Cooler 6/18/07
Food Service Cooler 6/18/07
Perishable Freezer 6/18/07
Seafood Freezer 6/18/07
Meat Cooler 7/2/07
Produce Prep 7/2/07
Produce Cooler 7/2/07
Frozen Food Cooler 7/13/07
Dairy Cooler 7/13/07
Floral Cooler 7/13/07
EQUIPMENT LIST (continued)
Equipment Delivery Dates(continued)
Shelving / Equipment / Specialty Items
Check-Outs TBD
Grocery Shelving TBD
Pharmacy Shelving TBD
Flag Pole TBD
Compactor TBD
Baler TBD
Carriage Corals TBD
Carriages TBD
Café Furniture TBD
Office Furniture TBD
Interior Signage TBD
Exterior Building Signs TBD
Exterior Pylon Sign TBD
Big Y Supplied Millwork
Food Service TBD
Bakery TBD
Customer Service Booth TBD
Floral TBD
Seafood TBD
Bottle Return TBD
Bulletin Boards TBD
QC and Breakroom Tables TBD
Box Outs TBD
End Blocks TBD
The above minutes represent our understanding of communication during this meeting. Project subcontractors will be held accountable for all scheduling, coordination and general discussion
that occurred during this meeting. If there are any discrepancies or misunderstandings, please contact the undersigned immediately.
Respectfully,
cm&b, Inc.
Joseph P. Venie
Joseph P. Venie
Project Manager
Distribution:
Tony Patillo – Northampton Building Department via email apatillo@city.northampton.ma.us
Frank Coe – Xavier Construction via email frank@xavierconstruction.com
Tony Coppola – Big Y World Class Market via email coppola@bigy.com
John Biskup – Big Y World Class Market via email biskup@bigy.com
John Jendza – Big Y World Class Market via email jendza@bigy.com
Frank Horacek – Big Y World Class Market via email horacek@bigy.com
Mike Charette – Big Y World Class Market via email charette@bigy.com
Frank Aniello– E&K via email faniello@ekmail.com
Roy Tiano– E&K via email RTiano@ekmail.com
Joe Venie – cm&b via email jvenie@cmbteam.com
Rob Harrison – cm&b via email rharrison@cmbteam.com
Emily Rose – cm&b via email erose@cmbteam.com
John Chatfield - cm&b via email jchatfield@cmbteam.com
Kevin Martin – UTS via email kevinmartinpe@aol.com
Steve Crabtree – UTS via email scrabtree@utsofmass.com
Leighton Allenby – Allenby Tree Movers via email lallenby@verizon.net
Peter Watson - Heritage Surveys via email peter@heritagesurveys.com
Chad Graybill – Helical Drilling via email chad@helicaldrilling.com
Andy Murkin - Associated Building Wreckers, Inc. via email abw_inc@comcast.net
Steve Follett – Gagliarducci via email steve@gagliarducci.com
Jay Gagliarducci – Gagliarducci via email jay@gagliarducci.com
Rich Bellucci – Gagliarducci via email rbellucci@gagliarducci.com
Manan Mehta - Fabcon East, LLC via email Manan.Mehta@fabcon-usa.com
Chuck Allison - Fabcon East, LLC via fax (610) 530-4471
Sherri Harris - Cantarella & Son via email harrissl1@verizon.net
Bill Kilpatrick – Bennington Iron Works via email BKilpatrick@BIWVT.com
Ken Worrell – SL Chasse via email k.worrell@slchassesteelfab.com
Lori Chasse – SL Chasse via email l.chasse@slchassesteelfab.com
Keith Mozer - Mozer Construction via email KMozer@Mozercorp.com
Chris Frommelt- Frommelt Dock & Door via email cfrommelt@fdandd.com
Jim Brophy – David Horwitz via email jfbrophy@comcast.net
Frank Alves - Architectural Window Systems, Inc. via email falves@architecturalwindowsystems.com
Gary Emond – Architectural Window Systems, Inc. via email gemond@architecturalwindowsystems.com
Andrew Kahl – Champagne Drywall via email Andrew.kahl@champagnedrywall.com
Gene Steneck - Automatic Door Systems, Inc. via email sales@autodoorsystems.com
Stephan Veilleux– Champagne Drywall via email Stephan.veilleux@champagnedrywall.com
Bill Pompa - Wall Systems Inc. via email info@Wall-Systems.com
Karim Lakhani – Apex Tile via email apextile@hotmail.com
JR Laliberte – Union Flooring, Inc. via fax 203-596-0481
Jim Underwood – HFP Sprinkler via email underwoodj@hfpsprinkler.com
Jason E. Duda- Boulangers Plumbing via email jduda@boulangersplumbing.com
Dave LaPan – A. Duquette & Sons via email adsdml@aol.com
Ivan Yuen – Berkshire Air Conditioning, LLC via email Ivan.yuen@serviceexperts.com
Robert Cadwallader – AIP via email bcadwallader@aipanel.com
Steve Dagnese – Commercial Electrical Contractors via email sdagnese@ceccom.com
Big Y World Class Market RFI Log
Big Y World Class Market RFI Log (continued)
Sketch Log
Big Y World Class Market Drawing Rider
No.
Description
Date
COVER SHEET
4/23/07
G001
GENERAL INFORMATION
Rev.6 4/23/07
GEO-1.0
GEOPIER LOCATION PLAN
1/10/07
Prepared By Helical Drilling
T-001
TITLE SHEET
REV. F 1/11/2007 ADDENDUM #6
C-000
LEGEND AND NOTES
REV. F 1/11/2007 ADDENDUM #6
C-001
EXISTING CONDITIONS PLAN
REV. F 1/11/2007 ADDENDUM #6
C-002
DEMOLITION PLAN
REV. F 1/11/2007 ADDENDUM #6
C-100
SITE PLAN
REV. F 1/11/2007 ADDENDUM #6
C-200
GRADING AND DRAINAGE PLAN
REV.H 4/11/07 BULLETIN #6
C-200A
UTILITIES PLAN
REV.G 3/5/07 BULLETIN #5
C-200X
DRAINAGE PROFILE PLAN
REV. G 1/11/2007 ADDENDUM #6
C-201
EROSION CONTROL AND PHASING PLAN
REV. F 1/11/2007 ADDENDUM #6
C-300
UTILITY PLAN
REV. F 1/11/2007 ADDENDUM #6
Big Y World Class Market Drawing Rider (continued)
C-301
LIGHTING PLAN
REV. F 1/11/2007 ADDENDUM #6
C-400
EXISTING TREE INVENTORY
REV. F 1/11/2007 ADDENDUM #6
C-401
PLANTING PLAN
REV.H 4/11/07 BULLETIN #6
C-500
DETAILS
REV. F 1/11/2007 ADDENDUM #6
C-501
DETAILS
REV. F 1/11/2007 ADDENDUM #6
C-502
DETAILS
REV. F 1/11/2007 ADDENDUM #6
C-503
DETAILS
REV. F 1/11/2007 ADDENDUM #6
C-504
DETAILS
REV. F 1/11/2007 ADDENDUM #6
C-505
ENLARGED SIDEWALK IMPROVEMENTS
REV. F 1/11/2007 ADDENDUM #6
C-506
DETAILS
REV.G 3/5/07 BULLETIN #5
SC-100
SIDEWALK IMPROVEMENTS AT COOKE AVE.
REV. F 1/11/2007 ADDENDUM #6
SC-101
SIDEWALK IMPROVEMENTS AT COOKE AVE. DETAILS
REV. F 1/11/2007 ADDENDUM #6
SC-102
EXISTING CONDITIONS PLAN
REV.H 4/9/07 BULLETIN #6
Big Y World Class Market Drawing Rider (continued)
SC-103
SIDEWALK IMPROVEMENTS AT COOKE AVE (NORTH SECTION)
REV.H 4/9/07 BULLETIN #6
SC-104
SIDEWALK IMPROVEMENTS AT COOKE AVE DETAILS
REV.H 4/9/07 BULLETIN #6
CE-101
SITE ELECTRICAL PLAN
Rev.4 4/23/07 BULLETIN #7
CE-102
SITE ELECTRICAL LEGEND, LIGHTING FIXTURE, SCHEDULE & DETAILS
Rev.4 4/23/07 BULLETIN #7
MA HIGHWAY DEPARTMENT DRAWINGS
1
TITLE SHEET AND INDEX
3/30/07
2
LEGEND AND ABBREVIATIONS
3/30/07
3
CONSTRUCTION PLAN
3/30/07
4
STANDARD MAST ARM DETAIL
3/30/07
5
TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS
3/30/07
6
TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS
3/30/07
7
TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS
3/30/07
8
TRAFFIC SIGNAL DATA
3/30/07
9
TRAFFIC MANAGEMENT PLAN
3/30/07
10
TRAFFIC MANAGEMENT PLAN
3/30/07
11
TRAFFIC SIGN SUMMARY
3/30/07
A100
FLOOR PLAN - BUILDING CONSTRUCTION
REV.3 4/23/07 BULLETIN #7
A101
FLOOR PLAN - FLOOR FINISHES
REV.3 4/23/07 BULLETIN #7
A102
REFLECTED CEILING PLAN
REV.2 3/5/07 BULLETIN #7
A103
SOFFIT CONSTRUCTION LAYOUT
REV.2 3/5/07 BULLETIN #5
A103a
SOFFIT CONSTRUCTION LAYOUT
REV.3 4/23/07 BULLETIN #7
A103b
ENLARGED SOFFIT CONSTRUCTION LAYOUT
REV.3 4/23/07 BULLETIN #7
A103b
ENLARGED SOFFIT CONSTRUCTION LAYOUT
REV.3 4/23/07 BULLETIN #7
A104
MEZZANINE PLANS AND WALL TYPES
REV.4 4/23/07 BULLETIN #4
Big Y World Class Market Drawing Rider (continued)
A105
ROOF PLAN
REV.2 3/5/07 BULLETIN #5
A106
ENLARGED PART. PLANS RESTROOM PLANS & TOILET ELEVATIONS
REV.3 4/23/07 BULLETIN #7
A107
FLOOR PLAN - SLAB DIMENSIONS
REV.3 4/23/07 BULLETIN #7
A200
EXTERIOR ELEVATIONS
REV.4 4/23/07 BULLETIN #7
A300
BUILDING SECTIONS
REV.2 3/5/07 BULLETIN #5
A301
SECTIONS
REV.2 3/5/07 BULLETIN #5
A302
EVAP/STOCKROOM/PRODUCE COOLER SECTIONS
REV.2 3/5/07 BULLETIN #5
A303
CANOPY SECTIONS
12/29/2006 ADDENDUM #1
A304
CANOPY SECTIONS / TOWER SECTIONS
REV.2 3/5/07 BULLETIN #5
A305
TOWER SECTIONS
REV.2 3/5/07 BULLETIN #5
A306
TOWER SECTION
12/29/2006 ADDENDUM #1
A307
TOWER SECTION
12/29/2006 ADDENDUM #1
A400
ROOF DETAILS
REV.2 3/5/07 BULLETIN #5
A401
VERTICAL CIRCULATION PLANS, SECTIONS, AND DETAILS
REV.2 3/5/07 BULLETIN #5
A402
PLAN DETAILS
REV.2 3/5/07 BULLETIN #5
A403
SECTION DETAILS
REV.2 3/5/07 BULLETIN #5
Big Y World Class Market Drawing Rider (continued)
A404
CANOPY DETAILS
12/29/2006 ADDENDUM #1
A500
FINISH SCHEDULE & MATERIALS LEGEND
REV.2 3/5/07 BULLETIN #5
A500a
FINISH SCHEDULE & MATERIALS LEGEND
REV.1 4/23/07 BULLETIN #7
A501
DOOR SCHEDULE & DETAILS
REV.4 4/23/07 BULLETIN #7
A502
WINDOW SCHEDULE & DETAILS
REV.4 4/23/07 BULLETIN #7
A600
INTERIOR ELEVATIONS & DETAILS
REV.3 4/23/07 BULLETIN #7
A601
ENLARGED INTERIOR ELEVATIONS & DETAILS
REV.1 4/23/07 BULLETIN #7
A700
MISCELLANEOUS DETAILS
REV.2 3/5/07 BULLETIN #5
A701
MILLWORK DETAILS
REV.3 3/5/07 BULLETIN #5
A702
MILLWORK DETAILS
REV.2 3/5/07 BULLETIN #5
A703
MISC. INTERIOR DETAILS
REV.3 4/23/07 BULLETIN #7
A704
SOFFIT DETAILS
REV.1 4/23/07 BULLETIN #7
S000
GENERAL STRUCTURAL NOTES
REV.2 3/5/07 BULLETIN #5
S100
FOUNDATION PLAN
REV.4 3/5/07 BULLETIN #5
S100A
GEOPIER LOAD DRAWING
11/28/2006 ADDENDUM #1
Big Y World Class Market Drawing Rider (continued)
S200
ROOF FRAMING PLAN
REV.4 3/5/07 BULLETIN #5
S201
MEZZANINE FLOOR, ROOF, AND CANOPY FRAMING PLANS
REV.3 3/5/07 BULLETIN #5
S300
TYPICAL FOUNDATION DETAILS AND SECTIONS
REV.2 3/5/07 BULLETIN #5
S301
FRAMING DETAILS AND SECTIONS
REV.3 3/5/07 BULLETIN #5
S302
FRAMING DETAILS
REV.1 3/5/07 BULLETIN #5
S303
FRAMING DETAILS
REV.1 3/5/07 BULLETIN #5
P100
FIRST FLOOR DRAINAGE PLAN
REV.3 4/23/07 BULLETIN #7
P101
FIRST FLOOR WATER AND GAS PLAN
REV.3 4/23/07 BULLETIN #7
P102
FIRST FLOOR DRAIN LOCATION PLAN
REV.3 4/23/07 BULLETIN #7
P200
MEZZANINE AND RISERS
REV.2 3/5/07 BULLETIN #5
P201
DETAILS
REV.2 3/5/07 BULLETIN #5
P202
DETAILS & SCHEDULES
12/29/2006 ADDENDUM #1
M100
HVAC FIRST FLOOR PLAN
REV.3 4/23/07 BULLETIN #7
M101
HVAC MEZZANINE FLOOR PLAN
REV.2 3/5/07 BULLETIN #5
M102
HVAC ROOF PLAN
REV.2 3/5/07 BULLETIN #5
Big Y World Class Market Drawing Rider (continued)
M201
HVAC SCHEDULES
REV.2 3/5/07 BULLETIN #5
M301
HVAC DETAILS
REV.2 3/5/07 BULLETIN #5
M302
HVAC DETAILS
12/29/2006 ADDENDUM #1
E100
LIGHTING PLAN
REV.3 4/23/07 BULLETIN #7
E101
POWER PLAN
REV.3 4/23/07 BULLETIN #7
E102
REFRIGERATION PLAN
REV.2 3/5/07 BULLETIN #5
E103
HVAC PLAN
REV.2 3/5/07 BULLETIN #5
E104
ENERGY MANAGEMENT SYSTEM PLAN
REV.2 3/5/07 BULLETIN #5
E105
MEZZANINE PARTIAL PLANS
REV.3 4/23/07 BULLETIN #7
E106
DATA / COMMUNICATION CABLE PLAN
REV.3 4/23/07 BULLETIN #7
E107
SOUND SYSTEMS PLAN
REV.2 3/5/07 BULLETIN #5
E108
SECURITY & CCTV SYSTEMS PLAN
REV.2 3/5/07 BULLETIN #5
E109
PARTIAL PLANS & EQUIPMENT SCHEDULES
REV.3 4/23/07 BULLETIN #7
E110
FIRE ALARM PLANS
REV.2 3/5/07 BULLETIN #5
E200
LIGHTING FIXTURE SCHEDULE & SYMBOL LIST
REV.3 4/23/07 BULLETIN #7
Big Y World Class Market Drawing Rider (continued)
E201
POWER RISER DIAGRAM
REV.4 4/23/07 BULLETIN #7
E202
PANELBOARD SCHEDULES
REV.4 4/23/07 BULLETIN #7
E203
PANELBOARD & MISCELLANEOUS SCHEDULES
REV.3 4/23/07 BULLETIN #7
E300
ELECTRICAL DETAILS
REV.3 4/23/07 BULLETIN #7
E301
ELECTRICAL DETAILS
REV.2 3/5/07 BULLETIN #5
E302
ELECTRICAL DETAILS
REV.2 3/5/07 BULLETIN #5
E303
SOUND SYSTEM, SECURITY SYSTEM & GROUNDING DETAILS
REV.2 3/5/07 BULLETIN #5
Prepared by Edwards and Kelcey Architects & Engineers
R-1
REFRIGERATION PIPING
11/13/06
R-2
REFRIGERATION PIPING
11/13/06
R-3
DEFROST SCHEDULE
11/8/06
R-4
REFRIGERATION NOTES AND SPECIFICATIONS
11/8/06
R-5
REFRIGERATION DETAILS
11/8/06
R-6
REFRIGERATION DETAILS
11/8/06
R-7
REFRIGERATION DETAILS
11/8/06
F-100
FLOOR PLAN - FIXTURE / CASE LOCATION
REV.3 4/23/07 BULLETIN #7