Loading...
Big Y World Class Market Site Northampton MA Meeting Minutes #32 dated 5-29-07 FINAL AR 6-4-07BIG Y WORLD CLASS MARKET / SITE IMPROVEMENTS Hamp Plaza 142 – 188 North King Street Northampton, MA 01060 cm&b Project #06349 Meeting Minutes #32 May 29, 2007 Attendees: Frank Coe – Big Y Frank Aniello – E&K John Chatfield – cm&b Joe Venie – cm&b Steve Follett – Gagliarducci Bill Kilpatrick – Bennington Andrew Kahl - Champagne Tony Karella – Boulanger Bruce LaPan – A. Duquette Ivan Yuen - Berkshire Bob Cadwallader – AIPC Steve Dagnese – CEC cm&b Superintendent – John Chatfield Phone: (413) 582-0223 Fax: (413) 582-6109 Cell: (508) 509-7673 All field direction and communication must be addressed through John Chatfield. Next Project Meeting Is Tuesday, June 5th. 9:30 am - Big Y Market / Site Meeting All subcontractors with work ongoing or started/completed within one week of this meeting are required to attend. CURRENT PROJECT STATUS Site: Binder pavement Phase I – complete. Site lighting conduits – ongoing. Prep grading work Phase II. Big Y Market: Decking and detail work – on-going. Lintel clips – ongoing. HVAC curbs layout – ongoing. Form vendor ramp – ongoing. Plumbing underground – ongoing. Wood blocking roof – ongoing. Duct hangers in palce. Prep mezzanine slab. Roof installation – ongoing. Excavate and backfill plumbing – on going. Electrical rough pipe mezzanine slab. Refrigeration underground – on going. Brick veneer “H” line – on going. Layout storefront framing – on going. SCHEDULE MILESTONES Place mezzanine slab Wednesday, 5/30 RTU delivery Monday 6/18 Binder Phase II Tuesday, 6/19 Roof Weather tight Friday, 6/1 Slab #1 Prepared Foods Wednesday, 6/13 HARD HATS ARE REQUIRED FOR ALL CONSTRUCTION PERSONNEL AND SITE VISITORS. SAFETY cm&b Safety Policies: Written safety manual and applicable MSDS information to be provided to project superintendent prior to start of work and/or delivery of materials. A SAFETY VIOLATION PENALTY POLICY IS IN EFFECT ON THIS PROJECT. ANY VIOLATION OF O.S.H.A. SAFETY REQUIREMENTS IS SUBJECT TO THE FOLLOWING ACTIONS: FIRST VIOLATION – VERBAL NOTICE. EMPLOYEE RETRAINING REQUIRED. SECOND VIOLATION – WRITTEN NOTICE. EMPLOYEE RETRAINING REQUIRED. THIRD VIOLATION – $100 FINE TO THE COMPANY OF THE EMPLOYEE RESPONSIBLE. RETRAINING REQUIRED. FOURTH VIOLATION – EMPLOYEE PERMANENTLY REMOVED FROM SITE. Violations Assessed Within The Last Week: None. Hardhats, shirts, long pants and work boots are required by all construction personnel through project completion. All Subcontractors are required to hold weekly employee safety meetings (“Tool Box Talks”). Foreman must submit a copy of topic discussed, with signatures of employees in attendance, to cm&b superintendent by Friday, 12:00 noon each week. Weekly Safety Discussion: SLIP AND FALLS Injury, accident, damage, theft or any other incident must be reported immediately to cm&b superintendent. NO EXCEPTIONS. First Aid station located in cm&b field office. cm&b Loss Control Guidelines. GENERAL ITEMS 1/9 City Engineer to approve / sign off for new sewer pump station. 3/27 Complete submittal due in on 4/17 – pump information. 4/17 Jim Laurila email response, City is still reviewing revised pump design drawings. 5/8 Left message for drawing review update. 5/15 Called Jim’s office again – left message. 5/22 Meeting with city engineer Jim Laurilla scheduled for June 5th at 11:00 am. ACTION BY: E&K 5/1 Appears new site grades at northeast corner site is higher than adjacent Sleepy’s property. 5/8 Provide spot grades of existing pavement and forward to E & K as soon as possible. 5/15 Heritage Survey to provide electronic “TOPO” of existing conditions to be forwarded to E & K. 5/29 Sketch sent to Gagliarducci for pricing. ACTION BY: HERITAGE SURVEY PERMITS 12/5 Traffic signalization plans are currently being evaluated by Mass Highway District 2 for approval. 4/10 Mass Highway is reviewing revised plans now. 5/1 Mass Highway issued 100% review comments. Edwards & Kelcey to revise drawings and submit for approval. 5/8 Final Mass Highway review drawings are updated and will be issued back to Mass Highway for record. 5/15 Final drawings went back to Mass Highway last week. 1/30 District 2 (District Permit Engineer Kenneth J. Crochiere (413) 582-0535) Traffic Signal Plan submittals review comments: 1/9 Traffic warrant for Cooke Ave. and Hatfield Street will add 4 way stop sign. Still needs city approval. 4/10 E & K to submit final drawings Monday, 4/16. 4/24 Cooke Avenue drawings currently being reviewed. 5/1 Need follow up call to City Engineer on drawing review status. 5/15 Left phone message for City Engineer last week. 5/15 E & K schedule meeting with City Engineer for Tuesday, June 5th at 11:00 PM. ACTION BY: E & K PERMITS (continued) 3/27 E&K to provide update for Cooke Ave. sidewalk widening design drawings (Bridge St – Hatfield St.) 4/17 Cooke Avenue revised drawings need City approval. 5/8 City Engineer has not reviewed drawings as yet. 5/15 Left message for Jim Laurilla for update. 5/29 City issued memo outlining comments relative to Cooke Ave. sidewalk. Need to address city concerns at meeting next Tuesday. SUBMITTALS Big Y World Class Market Pending Submittals:                 DESIGN Current drawing rider is attached.  All subcontractors please verify current drawings for field and office use. All cost issues must be documented and quantified with labor and material breakdowns.  Updated drawings are available through Service Point, Woburn, MA (781) 933-8700 phone / 781) 935-3926 fax. 5/29 QC room is deleted; mezzanine layout per drawing bulletin #2 layout will be followed. ACTION BY: CHAMPAGNE DRYWALL RECORD DRAWINGS Mark-up plan set is in field office for all trades. Record drawings must be updated weekly. CLEAN, MARKED-UP PLANS ARE REQUIRED. SCHEDULE AND PHASING 3/6 Expedited Big Y Construction Schedule Rev. 3 dated 1/9/07. (Substantial completion – turn over date October 26, 2007) 5/22 Big Y provide F1 plan marked up with equipment delivery dates. SECURITY SIGNAGE 5/29 Provide pylon sign shop drawings for coordination. ACTION BY: BIG Y TESTING UTILITIES ELECTRIC: MASS ELECTRIC (contact is Rogers Canoville (413) 582-7473). Service to new Big Y: Work order has been initiated. Loads are based on Big Y – Ellington, CT. 1/9 Mass Electric issued service request numbers: Temporary electrical service (construction) - #423031 Permanent electrical service (Big Y) - #287505 1/9 Mass Electric meter department contact – Bob Noel (413-582-7493). The following needs to be re-confirmed by Mass Electric. Meter socket will be located on transformer not switch gear in building. “Hot” sequence metering, CTs, PTs and meter provided by Mass Electric. Provide communication wire required for transformer. 5/21 Need date for temp service power turn on. ACTION BY: CEC WATER: 5/8 Need to set date for water service work on Route 5. 5/22 Correction water connection at Pine Brook Curve. ACTION BY: GAGLIARDUCCI 5/15 Need temporary construction water feed reconnected for masonry. 5/22 Add dual value for second hose connection. ACTION BY: BOULANGER PLUMBING PHONE: VERIZON (contact is Fran McManus (413) 247-0560). 5/29 Confirm that Mass Electric called Verizon to set up date for relocation of overhead wires behind Big Y Building. GAS: 9/14 Gas company contact is Bay State Gas (413) 788-9200. 5/8 Need to schedule meeting with Bay State Gas for new gas service work. 5/22 Gas company looking into new 2” service feed Cook Ave. behind retails to new Big Y. 5/22 Gas service agreement requires Big Y signature and deposit check as soon as possible. ACTION BY: cm&b UTILITIES (continued) SEWER: ABATEMENT DEMOLITION SITE WORK 3/27 Draft paving sequence for review and discussion by next meeting. 5/1 Set up paving meeting – Warner Bros. paving this week. 5/8 Draft paving schedule this date. 5/15 Paving schedule drawing to be posted in field office. ACTION BY: GAGLIARDUCCI 5/22 Prepare area behind building compactor pad as soon as possible. ACTION BY: GAGLIARDUCCI 5/29 Coordinate precast light pole bases – ship anchor bolts direct. ACTION BY: GAGLIARDUCCI / CEC 5/29 Move storage trailer and equipment off Sleepy’s property. ACTION BY: GAGLIARDUCCI LANDSCAPING BUILDING EXCAVATION 5/22 Pre Concrete Slab Meeting Attendees: Frank Coe – Big Y Frank Aniello- E&K Joe Venie – cm&b John Chatfield – cm&b Ralph Olds – Construction Services John Frances – Pioneer Valley Zack Borriasov – Apex Walter Verbork – Apex Karim Lakhani – Apex Luigi Fusco - UTS Minimum 1” concrete cover over electric walker duck. Email mezzanine slab concrete mix design for the A/E approval by end of day. ACTION BY: CONSTRUCTION SERVICE Submit floor hardener alternate material manufacture than specified product. Boulanger to verify plumbing drains and clean out cover elevations prior to slab placement Saw cut “pin wheel” slab at columns. Provide light tower for mezzanine slab placement. F.F. and F.L. readings will be taken by Pioneer Valley but are not for record. Fiber mesh is required in all slab on grade placements. Both Construction Service and UTS will verify fiber mesh in concrete mix at time of all slab placements. Cure sealer will be used as slab curing method. Pioneer Valley to submit cure sealer manufacture for approval. Mezzanine slab schedule moved to Wednesday May 30th (weather permitting). CONCRETE 5/15 Form farmer’s pit for Monday, 5/21. 5/29 Week of 5/29. ACTION BY: PIONEER VALLEY PRE-CAST CONCRETE 5/15 Embedded plates for girder support “knife” connections are missing. cm&b to follow up with Fabcon ASAP. 5/22 Fabcon panels were not designed for bottom cord girder “knife” connections. 5/29 Fabcon requires girder end cards connected so bottom cord “moment” does not take place. Fabcon and Bennington to coordinate issue. ACTION BY: BENNINGTON MASONRY 5/29 Need temporary power for mason’s saw. STRUCTURAL 5/15 Embedded “knife” plates for girders locations missing. 5/22 Bennington and E&K working on solution. 5/29 Bennington and Fabcon to review. ACTION BY: E&K / BENNINGTON 5/29 Hoist beamivat installed. Mechanical mezzanine is too long. cm&b to do RFI to E&K for direction. ACTION BY: BENNINGTON MISC. METALS CARPENTRY ROOFING CAULKING/SEALANTS 5/29 Need to release caulking contractor for submittals. ACTION BY: cm&b DOORS/WINDOWS 5/8 Need doors / frames / hardware submittals as soon as possible. 5/29 Submittals due this week. ACTION BY: DAVID HORWITZ ASSOCIATES 5/29 Door frames are due on site within two weeks. ACTION BY: cm&b ALUMINUM STOREFRONT AUTOMATIC DOORS 5/29 Verify that all hardware mounted on swing doors are “bone white.” ACTION BY: AUTOMATIC DOORS DRYWALL 5/29 Building Inspector requires a 24 hour notice for inspection. ACTION BY: CHAMPANE DRYWALL 5/29 Exterior frame material is due today. ACTION BY: CHAMPAGNE DRYWALL FLOORING CEILINGS PAINTING 5/1 Need paint “swatch” samples, wallcovering and paint material data submittals as soon as possible. ACTION BY: BARBIERI PAINTING SPECIALTIES / MISCELLANEOUS ITEMS 5/15 Vierfy mezzanine floor hatch delivery date. 5/22 Floor hatch ship date Thursday, May 24 via UPS freight. 5/29 Floor hatch delivery delay due to holiday, slab will be bond out hatch install at a later date. ACTION BY: cm&b LOADING DOCK EQUIPMENT 5/8 Need loading dock submittals as soon as possible. ACTION BY: FROMMELT DOCK & DOOR FIRE PROTECTION 5/22 FM Global requirements for sprinklers densities will be achieved at no additional cost. ACTION BY: HFP PLUMBING 5/22 Need roof drains coordinated with roofing work next week. Piping will need to be installed so water run out of building. ACTION BY: BOULANGER 5/22 Indirect plumbing pipes affected by rain last week were removed and reinstalled on dry compacted soil. ACTION BY: BOULANGER / GAGLIARDUCCI 5/29 Coordinate layout changes on bathrooms per SKP-2 dated 5/23/07. ACTION BY: BOULANGER 5/29 Standard water cooler will be used as per the original plumbing submittal. ACTION BY: BOULANGER HVAC 5/29 Duct conflict with ceiling heights in sales area is being reviewed by E&K. Sales duct install work on hold until further notice. ACTION BY: BERKSHIRE REFRIGERATION 5/29 (3) copies of updated refrigeration pit plan will be sent overnight to A. Duquette at cm&b field and office for Thursday. ACTION BY: E&K ELECTRICAL 5/29 Schedule electrical underground for prepare foods as soon as possible. Equipment Ship Dates: Square D – SB-A – QED Stitchboard 6/20/07 Square D – SF – NQOD MB Panelboards (INT) 6/4/07 Square D – BK – NQOD MB Panelboard (INT)-A 6/25/07 Square D – Dishwasher – HU363DS 5/30/07 Square D – Dishwasher – HU362RB 5/22/07 Square D – CT Pump – H361RB 5/17/07 Square D – BK – Special Panelboard Enclosure 5/29/07 Square D – BK – Special Panelboard Trim 6/19/07 Square D – BK – NQOD MLO Panelboard (INT)-B 5/29/07 Square D – OS – MH62 (BOX) 5/13/07 Square D – PR – Special Panelboard Enclosure & Trim 5/11/07 Bussmann – FRSR60 5/14/07 WAJA – Contactor Cabinet #8 ON HOLD WAJA – Contactor Cabinet #5 ON HOLD WAJA – Contactor Cabinet #2 ON HOLD TELEPHONES / CAT 5 SECURITY SYSTEMS EQUIPMENT LIST Equipment Delivery Dates Refrigerate Case Deliveries Beer 9/10/07 Frozen Food 9/10/07 Dairy 9/10/07 Meat 9/10/07 M.D. Produce 9/12/07 Cheese 9/12/07 Seafood 9/12/07 Service Deli 9/12/07 Bakery 9/12/07 Floral 9/12/07 Island Produce 10/8/07 Multi Deck Produce 10/8/07 Departments Sinks TBD Mechanicals / Misc. Equipment TBD Pizza Oven TBD Bakery Oven TBD Bakery Proofer TBD Cooler Shelving TBD Stainless Steel Tables / Cabinets TBD Non Mechanical Equipment TBD Supply / Purchasing / Small Wares TBD Major Mechanical Equipment Motor Control Center TBD Munters Curbs Tue, 6/5/07 RTU’s Mon, 6/18/07 Evaporation Coils TBD UPS TBD Lighting Package TBD Dawtech Air Door TBD Aip Cooler and Freezer Boxes Bakery Retarder 6/18/07 Bakery Freezer 6/18/07 Deli Cooler 6/18/07 Food Service Cooler 6/18/07 Perishable Freezer 6/18/07 Seafood Freezer 6/18/07 Meat Cooler 7/2/07 Produce Prep 7/2/07 Produce Cooler 7/2/07 Frozen Food Cooler 7/13/07 Dairy Cooler 7/13/07 Floral Cooler 7/13/07 EQUIPMENT LIST (continued) Equipment Delivery Dates(continued) Shelving / Equipment / Specialty Items Check-Outs TBD Grocery Shelving TBD Pharmacy Shelving TBD Flag Pole TBD Compactor TBD Baler TBD Carriage Corals TBD Carriages TBD Café Furniture TBD Office Furniture TBD Interior Signage TBD Exterior Building Signs TBD Exterior Pylon Sign TBD Big Y Supplied Millwork Food Service TBD Bakery TBD Customer Service Booth TBD Floral TBD Seafood TBD Bottle Return TBD Bulletin Boards TBD QC and Breakroom Tables TBD Box Outs TBD End Blocks TBD The above minutes represent our understanding of communication during this meeting. Project subcontractors will be held accountable for all scheduling, coordination and general discussion that occurred during this meeting. If there are any discrepancies or misunderstandings, please contact the undersigned immediately. Respectfully, cm&b, Inc. Joseph P. Venie Joseph P. Venie Project Manager Distribution: Tony Patillo – Northampton Building Department via email apatillo@city.northampton.ma.us Frank Coe – Xavier Construction via email frank@xavierconstruction.com Tony Coppola – Big Y World Class Market via email coppola@bigy.com John Biskup – Big Y World Class Market via email biskup@bigy.com John Jendza – Big Y World Class Market via email jendza@bigy.com Frank Horacek – Big Y World Class Market via email horacek@bigy.com Mike Charette – Big Y World Class Market via email charette@bigy.com Frank Aniello– E&K via email faniello@ekmail.com Roy Tiano– E&K via email RTiano@ekmail.com Joe Venie – cm&b via email jvenie@cmbteam.com Rob Harrison – cm&b via email rharrison@cmbteam.com Emily Rose – cm&b via email erose@cmbteam.com John Chatfield - cm&b via email jchatfield@cmbteam.com Kevin Martin – UTS via email kevinmartinpe@aol.com Steve Crabtree – UTS via email scrabtree@utsofmass.com Leighton Allenby – Allenby Tree Movers via email lallenby@verizon.net Peter Watson - Heritage Surveys via email peter@heritagesurveys.com Chad Graybill – Helical Drilling via email chad@helicaldrilling.com Andy Murkin - Associated Building Wreckers, Inc. via email abw_inc@comcast.net Steve Follett – Gagliarducci via email steve@gagliarducci.com Jay Gagliarducci – Gagliarducci via email jay@gagliarducci.com Rich Bellucci – Gagliarducci via email rbellucci@gagliarducci.com Manan Mehta - Fabcon East, LLC via email Manan.Mehta@fabcon-usa.com Chuck Allison - Fabcon East, LLC via fax (610) 530-4471 Sherri Harris - Cantarella & Son via email harrissl1@verizon.net Bill Kilpatrick – Bennington Iron Works via email BKilpatrick@BIWVT.com Ken Worrell – SL Chasse via email k.worrell@slchassesteelfab.com Lori Chasse – SL Chasse via email l.chasse@slchassesteelfab.com Keith Mozer - Mozer Construction via email KMozer@Mozercorp.com Chris Frommelt- Frommelt Dock & Door via email cfrommelt@fdandd.com Jim Brophy – David Horwitz via email jfbrophy@comcast.net Frank Alves - Architectural Window Systems, Inc. via email falves@architecturalwindowsystems.com Gary Emond – Architectural Window Systems, Inc. via email gemond@architecturalwindowsystems.com Andrew Kahl – Champagne Drywall via email Andrew.kahl@champagnedrywall.com Gene Steneck - Automatic Door Systems, Inc. via email sales@autodoorsystems.com Stephan Veilleux– Champagne Drywall via email Stephan.veilleux@champagnedrywall.com Bill Pompa - Wall Systems Inc. via email info@Wall-Systems.com Karim Lakhani – Apex Tile via email apextile@hotmail.com JR Laliberte – Union Flooring, Inc. via fax 203-596-0481 Jim Underwood – HFP Sprinkler via email underwoodj@hfpsprinkler.com Jason E. Duda- Boulangers Plumbing via email jduda@boulangersplumbing.com Dave LaPan – A. Duquette & Sons via email adsdml@aol.com Ivan Yuen – Berkshire Air Conditioning, LLC via email Ivan.yuen@serviceexperts.com Robert Cadwallader – AIP via email bcadwallader@aipanel.com Steve Dagnese – Commercial Electrical Contractors via email sdagnese@ceccom.com Big Y World Class Market RFI Log  Big Y World Class Market RFI Log (continued)  Sketch Log  Big Y World Class Market Drawing Rider No. Description Date    COVER SHEET 4/23/07  G001 GENERAL INFORMATION Rev.6 4/23/07         GEO-1.0 GEOPIER LOCATION PLAN 1/10/07    Prepared By Helical Drilling           T-001 TITLE SHEET REV. F 1/11/2007 ADDENDUM #6         C-000 LEGEND AND NOTES REV. F 1/11/2007 ADDENDUM #6  C-001 EXISTING CONDITIONS PLAN REV. F 1/11/2007 ADDENDUM #6  C-002 DEMOLITION PLAN REV. F 1/11/2007 ADDENDUM #6  C-100 SITE PLAN REV. F 1/11/2007 ADDENDUM #6  C-200 GRADING AND DRAINAGE PLAN REV.H 4/11/07 BULLETIN #6  C-200A UTILITIES PLAN REV.G 3/5/07 BULLETIN #5  C-200X DRAINAGE PROFILE PLAN REV. G 1/11/2007 ADDENDUM #6  C-201 EROSION CONTROL AND PHASING PLAN REV. F 1/11/2007 ADDENDUM #6   C-300 UTILITY PLAN REV. F 1/11/2007 ADDENDUM #6  Big Y World Class Market Drawing Rider (continued) C-301 LIGHTING PLAN REV. F 1/11/2007 ADDENDUM #6  C-400 EXISTING TREE INVENTORY REV. F 1/11/2007 ADDENDUM #6  C-401 PLANTING PLAN REV.H 4/11/07 BULLETIN #6  C-500 DETAILS REV. F 1/11/2007 ADDENDUM #6  C-501 DETAILS REV. F 1/11/2007 ADDENDUM #6  C-502 DETAILS REV. F 1/11/2007 ADDENDUM #6  C-503 DETAILS REV. F 1/11/2007 ADDENDUM #6  C-504 DETAILS REV. F 1/11/2007 ADDENDUM #6  C-505 ENLARGED SIDEWALK IMPROVEMENTS REV. F 1/11/2007 ADDENDUM #6  C-506 DETAILS REV.G 3/5/07 BULLETIN #5         SC-100 SIDEWALK IMPROVEMENTS AT COOKE AVE. REV. F 1/11/2007 ADDENDUM #6  SC-101 SIDEWALK IMPROVEMENTS AT COOKE AVE. DETAILS REV. F 1/11/2007 ADDENDUM #6   SC-102 EXISTING CONDITIONS PLAN REV.H 4/9/07 BULLETIN #6   Big Y World Class Market Drawing Rider (continued) SC-103 SIDEWALK IMPROVEMENTS AT COOKE AVE (NORTH SECTION) REV.H 4/9/07 BULLETIN #6  SC-104 SIDEWALK IMPROVEMENTS AT COOKE AVE DETAILS REV.H 4/9/07 BULLETIN #6         CE-101 SITE ELECTRICAL PLAN Rev.4 4/23/07 BULLETIN #7  CE-102 SITE ELECTRICAL LEGEND, LIGHTING FIXTURE, SCHEDULE & DETAILS Rev.4 4/23/07 BULLETIN #7           MA HIGHWAY DEPARTMENT DRAWINGS    1 TITLE SHEET AND INDEX 3/30/07  2 LEGEND AND ABBREVIATIONS 3/30/07  3 CONSTRUCTION PLAN 3/30/07  4 STANDARD MAST ARM DETAIL 3/30/07  5 TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS 3/30/07  6 TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS 3/30/07  7 TRAFFIC SIGNAL AND PAVEMENT MARKING PLANS 3/30/07  8 TRAFFIC SIGNAL DATA 3/30/07  9 TRAFFIC MANAGEMENT PLAN 3/30/07  10 TRAFFIC MANAGEMENT PLAN 3/30/07  11 TRAFFIC SIGN SUMMARY 3/30/07         A100 FLOOR PLAN - BUILDING CONSTRUCTION REV.3 4/23/07 BULLETIN #7  A101 FLOOR PLAN - FLOOR FINISHES REV.3 4/23/07 BULLETIN #7  A102 REFLECTED CEILING PLAN REV.2 3/5/07 BULLETIN #7  A103 SOFFIT CONSTRUCTION LAYOUT REV.2 3/5/07 BULLETIN #5  A103a SOFFIT CONSTRUCTION LAYOUT REV.3 4/23/07 BULLETIN #7  A103b ENLARGED SOFFIT CONSTRUCTION LAYOUT REV.3 4/23/07 BULLETIN #7   A103b ENLARGED SOFFIT CONSTRUCTION LAYOUT REV.3 4/23/07 BULLETIN #7  A104 MEZZANINE PLANS AND WALL TYPES REV.4 4/23/07 BULLETIN #4  Big Y World Class Market Drawing Rider (continued) A105 ROOF PLAN REV.2 3/5/07 BULLETIN #5  A106 ENLARGED PART. PLANS RESTROOM PLANS & TOILET ELEVATIONS REV.3 4/23/07 BULLETIN #7  A107 FLOOR PLAN - SLAB DIMENSIONS REV.3 4/23/07 BULLETIN #7  A200 EXTERIOR ELEVATIONS REV.4 4/23/07 BULLETIN #7  A300 BUILDING SECTIONS REV.2 3/5/07 BULLETIN #5  A301 SECTIONS REV.2 3/5/07 BULLETIN #5  A302 EVAP/STOCKROOM/PRODUCE COOLER SECTIONS REV.2 3/5/07 BULLETIN #5  A303 CANOPY SECTIONS 12/29/2006 ADDENDUM #1  A304 CANOPY SECTIONS / TOWER SECTIONS REV.2 3/5/07 BULLETIN #5  A305 TOWER SECTIONS REV.2 3/5/07 BULLETIN #5  A306 TOWER SECTION 12/29/2006 ADDENDUM #1  A307 TOWER SECTION 12/29/2006 ADDENDUM #1  A400 ROOF DETAILS REV.2 3/5/07 BULLETIN #5  A401 VERTICAL CIRCULATION PLANS, SECTIONS, AND DETAILS REV.2 3/5/07 BULLETIN #5   A402 PLAN DETAILS REV.2 3/5/07 BULLETIN #5  A403 SECTION DETAILS REV.2 3/5/07 BULLETIN #5   Big Y World Class Market Drawing Rider (continued) A404 CANOPY DETAILS 12/29/2006 ADDENDUM #1  A500 FINISH SCHEDULE & MATERIALS LEGEND REV.2 3/5/07 BULLETIN #5  A500a FINISH SCHEDULE & MATERIALS LEGEND REV.1 4/23/07 BULLETIN #7  A501 DOOR SCHEDULE & DETAILS REV.4 4/23/07 BULLETIN #7  A502 WINDOW SCHEDULE & DETAILS REV.4 4/23/07 BULLETIN #7  A600 INTERIOR ELEVATIONS & DETAILS REV.3 4/23/07 BULLETIN #7  A601 ENLARGED INTERIOR ELEVATIONS & DETAILS REV.1 4/23/07 BULLETIN #7  A700 MISCELLANEOUS DETAILS REV.2 3/5/07 BULLETIN #5  A701 MILLWORK DETAILS REV.3 3/5/07 BULLETIN #5  A702 MILLWORK DETAILS REV.2 3/5/07 BULLETIN #5  A703 MISC. INTERIOR DETAILS REV.3 4/23/07 BULLETIN #7  A704 SOFFIT DETAILS REV.1 4/23/07 BULLETIN #7          S000 GENERAL STRUCTURAL NOTES REV.2 3/5/07 BULLETIN #5  S100 FOUNDATION PLAN REV.4 3/5/07 BULLETIN #5  S100A GEOPIER LOAD DRAWING 11/28/2006 ADDENDUM #1   Big Y World Class Market Drawing Rider (continued) S200 ROOF FRAMING PLAN REV.4 3/5/07 BULLETIN #5  S201 MEZZANINE FLOOR, ROOF, AND CANOPY FRAMING PLANS REV.3 3/5/07 BULLETIN #5  S300 TYPICAL FOUNDATION DETAILS AND SECTIONS REV.2 3/5/07 BULLETIN #5  S301 FRAMING DETAILS AND SECTIONS REV.3 3/5/07 BULLETIN #5  S302 FRAMING DETAILS REV.1 3/5/07 BULLETIN #5  S303 FRAMING DETAILS REV.1 3/5/07 BULLETIN #5         P100 FIRST FLOOR DRAINAGE PLAN REV.3 4/23/07 BULLETIN #7  P101 FIRST FLOOR WATER AND GAS PLAN REV.3 4/23/07 BULLETIN #7  P102 FIRST FLOOR DRAIN LOCATION PLAN REV.3 4/23/07 BULLETIN #7  P200 MEZZANINE AND RISERS REV.2 3/5/07 BULLETIN #5  P201 DETAILS REV.2 3/5/07 BULLETIN #5  P202 DETAILS & SCHEDULES 12/29/2006 ADDENDUM #1          M100 HVAC FIRST FLOOR PLAN REV.3 4/23/07 BULLETIN #7  M101 HVAC MEZZANINE FLOOR PLAN REV.2 3/5/07 BULLETIN #5  M102 HVAC ROOF PLAN REV.2 3/5/07 BULLETIN #5   Big Y World Class Market Drawing Rider (continued) M201 HVAC SCHEDULES REV.2 3/5/07 BULLETIN #5  M301 HVAC DETAILS REV.2 3/5/07 BULLETIN #5  M302 HVAC DETAILS 12/29/2006 ADDENDUM #1         E100 LIGHTING PLAN REV.3 4/23/07 BULLETIN #7  E101 POWER PLAN REV.3 4/23/07 BULLETIN #7  E102 REFRIGERATION PLAN REV.2 3/5/07 BULLETIN #5  E103 HVAC PLAN REV.2 3/5/07 BULLETIN #5  E104 ENERGY MANAGEMENT SYSTEM PLAN REV.2 3/5/07 BULLETIN #5  E105 MEZZANINE PARTIAL PLANS REV.3 4/23/07 BULLETIN #7  E106 DATA / COMMUNICATION CABLE PLAN REV.3 4/23/07 BULLETIN #7  E107 SOUND SYSTEMS PLAN REV.2 3/5/07 BULLETIN #5  E108 SECURITY & CCTV SYSTEMS PLAN REV.2 3/5/07 BULLETIN #5   E109 PARTIAL PLANS & EQUIPMENT SCHEDULES REV.3 4/23/07 BULLETIN #7  E110 FIRE ALARM PLANS REV.2 3/5/07 BULLETIN #5  E200 LIGHTING FIXTURE SCHEDULE & SYMBOL LIST REV.3 4/23/07 BULLETIN #7   Big Y World Class Market Drawing Rider (continued) E201 POWER RISER DIAGRAM REV.4 4/23/07 BULLETIN #7  E202 PANELBOARD SCHEDULES REV.4 4/23/07 BULLETIN #7  E203 PANELBOARD & MISCELLANEOUS SCHEDULES REV.3 4/23/07 BULLETIN #7  E300 ELECTRICAL DETAILS REV.3 4/23/07 BULLETIN #7  E301 ELECTRICAL DETAILS REV.2 3/5/07 BULLETIN #5  E302 ELECTRICAL DETAILS REV.2 3/5/07 BULLETIN #5  E303 SOUND SYSTEM, SECURITY SYSTEM & GROUNDING DETAILS REV.2 3/5/07 BULLETIN #5    Prepared by Edwards and Kelcey Architects & Engineers           R-1 REFRIGERATION PIPING 11/13/06  R-2 REFRIGERATION PIPING 11/13/06  R-3 DEFROST SCHEDULE 11/8/06  R-4 REFRIGERATION NOTES AND SPECIFICATIONS 11/8/06  R-5 REFRIGERATION DETAILS 11/8/06  R-6 REFRIGERATION DETAILS 11/8/06  R-7 REFRIGERATION DETAILS 11/8/06          F-100 FLOOR PLAN - FIXTURE / CASE LOCATION REV.3 4/23/07 BULLETIN #7