Loading...
31B-114 126 King St front elevation w-rampArchitects 196 Pleasant St.Northampton, MA 01060413-585-0641fax: 582-9882 REGISTERED ARCHITECT,COMMONWEALTH OFMASSACHUSETTS This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Thomas Douglas Architects is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright. THOMAS DOUGLAS Drawing No. Rev Date Description Project Title 126 KING STREETNorthampton, Massachusetts Issue Date: Drawn By: Checked By: Project ID: Project North 1 02/28/12 PROGRESS Sheet Title Scale: 02/28/2012 JPB TD 1136 AS NOTED 2 06/20/12 REVISIONS PROPOSED ELEVATIONS A-200 2ND FLOOR 1ST FLOOR 0 S 13°39'26" E 65'0" BEDROOM13'3" X 10'9" BEDROOM13'1" X 9'1" CLOSETCLOSET RAMP UP1" per 12"SIDEWALK UP0 8 8 28 28 38 3842 UPgrass or landscaping grass or landscaping curbcurb curbUP UP UP East Elevation (King Street)Scale: 1/4" = 1'-0"2 1st Floor Plan - Front Porch & Ramp AdditionScale: 1/4" = 1'-0"1 3RD FLOOR New dormerNew dormer New covered front entry porch - stair & ramp Wood deck at ramp Wood deck at landing Wood deck at landing Wood deck at landing Wood deck at ramp Wood deck at ramp Wood deck at ramp Concrete or pavers Grass or landscaping concrete or paver sidewalkcurbcurb Grass or landscapingNEW VINYL SIDING ON FRONT FACADE. SALVAGE EXISTING SIDING TO PATCH OTHER WALLS AS NEEDED. 2 FRONT PORCH MAINTAINS APPREARANCE OF BEING ONE LEVEL FROM STREET. 2 Align ramp with outside edge of side entry porch2ND FLOOR 1ST FLOOR 3RD FLOOR Proposed West ElevationScale: 1/4" = 1'-0"2 New dormer New covered wood egress stair & porch Existing dormer New dormer NEW REAR PORCH