Loading...
32A-109 58-Market_2014-05-15 rev plans48"EE WindowSlight Wash West for RainwaterC Window48Step UpEQ10EQ7New PT Column28Step Up48Ridge AboveC Window36EQ10Exterior Wall See DetailsCustom Door in Existing LocationD WindowExterior Wall See DetailsPatio DoorStep UpPatio DoorStep Up32Step UpP (LH) Patio DoorUtility Space: Plant Ledge with Raised Lip (no railing). Accessible only via Locked Utility Doorways. Not occupyable space. Key access for maintenance and care only.Stackable WDElectricEQ5Dish WasherC Window4836Interior Wall See DetailsRailingEQ1EQ1EQ1EQ1Columns per Lumberyard. Likely Three 2x6sX Area Open to AboveP (RH) Patio DoorP (LH) Patio DoorQ (LH) Patio Door Centered on RidgeQ (LH) Patio Door Centered on RidgeEQ448Steps Up. Quantity as NecessaryRoof Line AboveVelux Deck Mounted Fixed Skylight FS-A06 Centered on Toilet (EW) and Space (NS)RO: 14-1/2" x 45-3/4" (verify with vendor)B WindowCheck Exact LocationEQ11Step UpC WindowOwner Electric Sub-PanelAll Telephone and Cable Home Runs Terminate HereSpiral Staircase Up to 1st FlrExisting Balcony Footing Locations May Change: See 1st FlrEQ1New Existing 4'-6" NOM Height Slurry Wall. Stud Wall above to underside of Joists, PT Bottom PlateEQ6EQ6EQ6EQ5Compliance Alternative Requested - Access to Secondary Egress Door through Interior Doorway: A. 28”W MIN clear (per R311.2 MA Amendment) B. Readily openable from both sides without the use of a key or special knowledge or effort (per R311.2)D WindowBalcony is Roof for Space Below: Rubber EDPM Roofing on Plywood Deck. Wooden Decking Above. Alternate: T&G Decking with Silicone Caulking at Seams48Spiral Staircase Up to 3rd Flr72EQ336EQ7Roof Line AboveEQ10EQ8EQ8EQ11C WindowC WindowEQ5Compliance Alternative Requested - Access to Secondary Egress Door through Interior Doorway: A. 28”W MIN clear (per R311.2 MA Amendment) B. Readily openable from both sides without the use of a key or special knowledge or effort (per R311.2)Velux Deck Mounted Manual Vented Skylight VS-S06 Centered in Space on DoorwaysRO: 44-1/4" x 45-3/4" (verify with vendor)32Columns per Lumberyard. 3-1/2" Square MAX, Trimmed if ExposedColumns per Lumberyard. 3-1/2" Square MAX, Trimmed if ExposedColumns per Lumberyard. 3-1/2" Square MAX, Trimmed if ExposedMIN Possible Width, CenteredMIN Possible Width, CenteredNew Existing Concrete FootingsD WindowExterior Wall See DetailsMIN Possible Width4848Steps Up to 3rd FlrFire Wall See Details1Hr Rated DoorFront Entry Door1Hr Rated DoorSpiral Staircase Up from GradeSpiral Staircase Up to 2nd FlrFire Wall See DetailsInsulated Door in Existing Location3" Step UpEQ2Basement Walls: See Details for InsulationEE WindowRoof Line AboveEQ2Slight Wash East for RainwaterBalcony is Roof for Space Below: Rubber EDPM Roofing on Plywood Deck. Wooden Decking Above. Alternate: T&G Decking with Silicone Caulking at SeamsSlight Wash West for RainwaterEQ3Spiral Staircase Up from 1st FlrInterior Wall See DetailsC WindowSteps Up from 1st Flr to LandingDish Washer5 New Pilasters / Columns. Already in Place36EQ8Step Up from LandingEQ8EQ4EQ9EQ9Step UpA WindowAA Window3636363636363636Stairs Up from 2nd FlrInterior Wall See DetailsEE WindowSpiral Staircase Up from 2nd FlrStaircase Above: walls only up to stairsI-Beam Above and Column CenterlineA WindowSteps Up to 2nd FloorI-Beam Above and Column CenterlineSEE 1ST FLR PLAN FOR LOCATIONSFour Columns per LumberyardDepth per Pre-Demolition ConditionsAA WindowD Window3 Steps UpStep UpA WindowI-Beam Above and Column CenterlineBalcony is Roof for Space Below: Rubber EDPM Roofing on Plywood Deck. Wooden Decking AboveEWLAUNDRYROOMBEDROOM 2 /OFFICE SPACEKITCHENBASEMENT ENTRYWAY(not insulated)ENTRY PORCH LANDINGSTORAGEunder staircaseREAR BALCONYBASEMENT(insulated, see Details)EWCO & SDCO & SDCO & SDSDSDSDCO & SDDINING / LIVINGCO & SDSDCO & SDSTORAGEREAR BALCONYLANDINGBEDROOM 2BEDROOM 3SDREAR BALCONYEWKITCHENBEDROOM 1DINING / LIVINGEWFRONTBALCONYCOUNTERBEDROOM 1FRONTBALCONYLAUNDRY under counterPLANTS LEDGEFRONT BALCONYEW3RD FLR PLAN1ST FLR PLAN2ND FLR PLANBASEMENT PLANNorth58 Market Street, Northampton, MADrawings by Owner - May 15, 2014Unless Otherwise Noted, All Drawings at 1/4" ScalePLANS FOR UPDATE TO BUILDING PERMIT 90 Floor to Bottom of Joists in Basement VARSee Details for Wall144 NOMSee Details for Basement CeilingStructural Ridge:See Lumberyard Drawings. Minimal horizontal area40 NOM TYP Window Height at Counters and BathroomsStructural Ridge Support :See Lumberyard Drawings3-1/2" Square MAX Columns per Lumberyard. TYP set in Sheetrock. Trimmed if ExposedNOM Top of Door & Window 8060 NOM TYP Window Height96 MIMRoof Assembly: See Details96 MINNOM Top of Door & Window 8018 MIN OverhangGround Level VAR36" x 36" x 24" Deep Reinforced Concrete FootingHumidity Resistant Columns as per Lumberyard. Likely 3-1/2" D Concrete Filled Metal Tube.5-1/2"H MAX Beam per Lumberyard. Likely W5-19 I-Beam Filled w/ 2-bysExisting MasonryExterior Wall See Details96 Min.96 Min.Floor See DetailsExisting Slab. Patched2 Layers of 5/8" GYP2 Layers of 5/8" GYP2x4s (16" OC)Cellulouse Insulation in BaysCellulouse Insulation in Bays around Restrooms and Bedrooms2x4s (16" OC)1/2" GYP1/2" GYP5/8" Perp. Sleepers2x6 Joists, Filled with Cellulose5/8" GYP Ceiling2" Closed Cell Foam Insulation at Exterior Headers1/4" for Acoustic Channels3/4" SubfloorFlooring2" Closed Cell Foam Insulation at Exterior Headers/Rim and down to Grade. 2" Foam Insulation Board Where Possible. Painted with Fire Retandant as Necessary1" Closed Cell Foam Insulation from Grade to 48" Below. 1" Foam Insulation Board Where Possible. Painted with Fire Retandant as NecessaryGrade VARFlooring2x6 Joists, Bays Filled with Fiberglass Insulation3/4" Subfloor1/2" GYPWaste/Vent Stacks Placed Before Foam Insulation1x8 Corner Boards, Ripped to Match2-by PT Header5/4 or 1-by TrimVAR. May Overlap3/8" Spacer StripVertical Strips for Flatening Siding2x6s (16" OC)Double 2-by PT4x4 Porch ColumnSidingContinuous 3/8" SheetExisting 2-by Vertical PlanksHousewrap5/8" Sheetrock (at South Wall Only)3 1/2" Cellulouse Insulation2" Closed Cell Spray Foam Insulation5/8" GYP Extends Around Soffit(at south wall only)5/8" GYP (at South Wall Only)2x10 Rafters with Cellulose Insulation in Bays1/2" Sheetrock2" Closed Cell Spray Foam Insulation along both Eve and RakeSidingVertical Strips for Flatening SidingK-Gutter installed on Vertical Strips2" Closed Cell Spray Foam Insulation3 1/2" Cellulouse InsulationStrapping1 Layer of 2" Foam Insulation BoardSheathingFoam Sheets ExtendsHousewrap18 MIN Overhang1/2" Plywood Sheathing1/2" GYP2x6 Top Plate atop 2x6 Wall (16" OC)Rafter Extends. Soffit May Follow Rafter AngleSheathing and Roofing48"5/8" Gyp. Ceiling5/8" Perp. Sleepers96 MIN104 1/2 MIN Floor to Floor104 1/2 MIN Floor to Floor96 MIN42" x 42" LandingFloor Asembly Same as Below2x6 Joists, Filled with Cellulose3rd Floor8 1/16 Rise Typ.24 Winder Typ.10 Step Typ.1/4" for Acoustic Channels10 Step Typ.8 1/16 Rise Typ.2nd FloorW5-19 Beam (part of staircase RO)1st Floor1-1/2" Subfloor and FloorConceptual Staircase SectionFIRE WALL PLAN SECTIONScale: 1" = 1'-0"INTERIOR WALL PLAN SECTIONScale: 1" = 1'-0"FLOOR BETWEEN DWELLING AREAS SECTIONScale: 1" = 1'-0"FLOOR BETWEEN 1ST FLR AND BASEMENT, AND BASEMENT WALL SECTIONScale: 1" = 1'-0"EXTERIOR WALL PLAN SECTIONScale: 1" = 1'-0"ROOF AND 3RD FLOOR EXTERIOR WALL SECTIONScale: 1" = 1'-0"Conceptual Home Section58 Market Street, Northampton, MADrawings by Owner - May 15, 2014Unless Otherwise Noted, All Drawings at 1/4" ScaleSECTIONS AND DETAILS FOR UPDATE TO BUILDING PERMIT