Loading...
23C-110 Caron Deal House rev.7 foundation planJeffrey Bott Contracting 32 Pine Street Florence, MA 01062 413 530 6920 Project Name House on Baker Hill Client Name and AddressJaime Caron Sharon Deal Woodmount Ave, Northampton MA Sheet Number Sheet TitleA-0.1 Foundation plan6'-4"6'-2"6'-2"9'-3"8'-10 1/2"8'-10 1/2" 7'-1 1/4"9'-0"9'-0"5'-9 1/4"7'-9 1/2" 6'-4"1'-0"6'-2 1/2"6'-2 1/2"6'-2 1/2"6'-2 1/2"11'-8" 16'-0"5'-8"6'-0" 6'-8"18'-0"15'-4" bottom of footing -16' 2' step top of wall-8', 3' step 7' wall top of wall-11', 3' step 6' wall 2' step down for door top of wall-11', 3' step, 6' walltop of wall-8', 3' step, 7' wall bottom of footing -14'bottom of footing -18'precast piers 4 ea. set bottom 48" below grade 2' x 2' x 1' footings typ. set at bottom of footings on undisturbed soil bottom of footing -18' 1' step bottom of footing -16', 2' step bottom of footing -18', 2' step top of wall-11', 6' wallprecast piers 8 ea. set bottom 48" below grade bottom of footing -14' top of wall -5' benchmark: surface of pavement at upper property corner (0')6'-4"12'-4"4" concrete slab over 2" polystyrene foam board 6 mil. poly taped seams 6" compacted gravel fill 4" perimeter drain covered with 1/2" stone to daylight 24" x 10" Concrete footing2-#4 bar 8"Concrete wall 8" anchor bolts 4' on center #4 bar 8'-0" 8'-0"2'-8"3'-8"13'-8"