Loading...
36 -244 7D19956SC_G1_2_SFDKeyBeam® 4.600d kmBeamEngine 4.6026 Materials Database 1418 7D19956SC - G1-2 SFD KATZ RESIDENCE - LOT 9 SOVEREIGN WAY, NORTHAMPTON, MA 9-11-13 4:22pm 1 of 2 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED. **Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Stephen Carr Seven D Wholesale 145 Dividend Road Rocky Hill, CT 06067 (860) 278-7750 Member Data Description: G11 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 8.3 PLF Filename: G11_10 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 4' 0.00" 27 10 Live Replacement Uniform (PLF) Top 0' 0.00" 6' 4.50" -141 -46 Live Replacement Uniform (PLF) Top 0' 0.00" 17' 0.00" -53 -20 Live Replacement Uniform (PLF) Top 0' 0.00" 17' 0.00" 40 20 Live Replacement Uniform (PLF) Top 4' 0.00" 17' 0.00" 27 10 Live Replacement Uniform (PLF) Top 6' 4.50" 10' 6.50" 46 15 Live Replacement Uniform (PLF) Top 10' 6.50" 16' 9.25" -141 -46 Live Replacement Uniform (PLF) Top 16' 9.25" 32' 6.00" 243 121 Live Point (LBS) Top 0' 4.63" 765 421 Snow Point (LBS) Top 17' 0.00" 465 258 Live 1 2 3 17 0 0 15 6 0 32 6 0 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall Steel 5.500" 1.500" 1613# -1080# 2 17' 0.000" Wall Steel 3.500" 1.838" 5548# -1293# 3 32' 6.000" Wall Steel 5.500" 1.500" 2558# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 -1157# 765# 77# 2 3610# 0# 1938# 3 1687# 0# 870# Design spans 16' 7.375" 15' 1.375" Product: 2.0 RigidLam LVL 1-3/4 x 9-1/2 2 ply PASSES DESIGN CHECKS Connect members with 2 rows of 16d common nails at 12.0" oc NOTE: Pass-thru framing is required at point loads over bearings. Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 1081lbs at bearing 1 and ensure that the structure can resist appropriately. Review gravity uplift reaction force of 1294lbs at bearing 2 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 8779.'# 13100.'# 67% 25.31' Total Load D+L Negative Moment 7372.'# 13100.'# 56% 17' Total Load D+L Shear 3008.# 6318.# 47% 17.01' Total Load D+L Max. Reaction 4826.# 10172.# 47% 17' Total Load D+L TL Deflection 0.6825" 0.7557" L/265 24.56' Total Load D+L LL Deflection 0.4600" 0.5038" L/394 24.56' Total Load L Control: LL Deflection DOLs: Live=100% Snow=115% Roof=125% Wind=160% Point loads over bearings are NOT included in the Design calculations, but ARE included in the Reaction table