Loading...
24A-248 FRAME08LRU212 HANGERSSum vertical load capacitiesSHIPPING INFORMATION: DESIGNED BY: Doug Hodgins JOB: 48 Terrance Eric Payne/48 Terrance LnWest Hatfield Ma.21 West St.rk Miles Inc.Scale: 1/2" = 1'NOTES:SHEET NUMBER: 1 1st walls LAYOUT FINAL N/AN/A ISSUE:DATE: N/A N/A 02/03/16 DESCRIPTION: FINAL N/A N/A Northampton Ma See Boise literature for joistvertical load capacity.See Boise literature for joist blockingbirdsmouth cut in bottom D2X2N1S2XPR ROOF FRAMING PLAN ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R2 2 Spruce-Pine-Fir #2 2 x 12 8' 0" Total length: 16' 0" ------- Roof Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 10 Spruce-Pine-Fir #2 2 x 12 8' 0" Total length: 80' 0" ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ B4 2 1-3/4x9-1/2 VERSA-LAM 2.0 3100 10' 0" Total length: 20' 0" G3 1 1-3/4x11-7/8 VERSA-LAM 2.0 310 14' 0" Total length: 14' 0" ------- Header Material ------- Type Qty. Product Length ------ ---- ------- ------ B1 2 Spruce-Pine-Fir #2 2 x 8 3' 0" B2 2 v v 4' 0" Total length: 14' 0"All product names are trademarks of their respective ownersCSOCBU HROOVITITHUHHLSLS3RThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately2X12 ROOF RAFTERS 24” O/CR2R2R1R1B22 plyB12 plyB42 plyG31 plyH1H114' 1-3/16"12' 0"