Loading...
construction-control-document-phased-47Pleasant_Woodard_01Version 06_11_2012 Construction Control Progress Checklist To be submitted at completion of required site reviews for construction progress per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Renovations Tenant Fit Out – 1st Floor (Woodard & Cullen) Date:01/23/2017 Permit No.BP-2017-0810 Property Address: Coolidge Center, 47 Pleasant Street, Northampton, MA 01060 I, Richard E. Katsanos MA Registration Number: AR 8355 Expiration date: 08/31/2017 am a registered design professional and I or my designee have observed the following work, and to the best of my knowledge, information, and belief the construction work indicated below has been performed in a manner consistent with the approved plans and specifications: 1. Indicate with an ‘x’ the work you reviewed for compliance with the approved plans and specifications and describe in detail below. 2. Include NFPA 72 test and acceptance documentation 3. Include applicable NFPA 13, 13R, 13D, 14, 15, 17, 20, 241, etc. - test and acceptance documentation 4. Include NFPA 720 Record of Completion and Inspection and Test Form 5. Include field reports and related documentation 6. Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this code with respect to examination of the contract documents, including plans, computations and specifications, and field inspections. Description of Construction Work Observeda: Demolition complete; interior non load-bearing partitions framed. Rough electrical proceeding. All work is proceeding in accordance with the plans on file a.Describe in sufficient detail the work (i.e. foundation steel reinforcing, kitchen vent system, etc.) and the location on the project site, and list if applicable, the submittal documents that pertain to the work which was inspected. Enter in the space to the right a “wet” or electronic signature and seal: Phone number: 413-585-1512 Email: Richard.Katsanos@HAIArchitecture.com Building Official Use Only Building Official Name: Date: Required Site Review and Documentation for Portions or Phases Construction 1,6 (to be performed by the appropriate registered design professional or his/her designee or M.G.L.c 112 §81R contractor) Site Review and Documentation X Site Review and Documentation X Soil condition and analysis Energy Efficiency Requirements Footing and Foundation , including Reinforcement and Foundation attachment Fire Alarm Installation2 Concrete Floor and Under Floor Fire Suppression Installation3 Lowest Floor Flood Elevation Field Reports5 Structural Frame – wall/floor/roof Carbon Monoxide Detection System4 Lath and Plaster/Gypsum Seismic reinforcement Fire Resistant Wall/Partitions framing X Smoke Control Systems (Special Inspection per Sections 909.3 and 909.18.8) Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents Above Ceiling inspection X Accessibility (521 CMR) Fire Blocking/Stopping System Other: Emergency Lighting/Exit Signage Means of Egress Componenets X Special Inspections (Section 1704): Roofing, coping/System Venting Systems (kitchen and cleanouts, chemical, fume) Mechanical Systems