Loading...
11A-093 porch beam calcsCS Structure™ 2.06.13[Build 1] kmBeamEngine 4.6.1.0 Materials Database 1492 JazabEd40ChestnutAveLeeds11251 12- 5-14 1:08pm 1 of 2 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcB4 Member Type: Beam Application: Roof Comments:Top Lateral Bracing: Continuous Slope: 0.00 / 12 Bottom Lateral Bracing: (See Below) Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 5.6 PLF Filename: Q:\JazabEd40 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 0' 5.50" -45 0 Snow Replacement Uniform (PLF) Top 0' 0.00" 0' 5.50" -0 -14 Live Replacement Uniform (PLF) Top 0' 0.00" 6' 4.25" 0 1 Live Replacement Uniform (PLF) Top 0' 5.50" 6' 4.25" 0 28 Live Replacement Uniform (PLF) Top 0' 5.50" 6' 4.25" 55 0 Snow Point (LBS) Top 0' 4.63" -0 109 Live Point (LBS) Top 0' 4.63" 188 0 Snow 1 2 6 4 4 6 4 4 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall N/A N/A 1.500" 542# -- 2 6' 4.250" Wall N/A N/A 1.500" 252# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 0# 337# 205# 2 1# 153# 99# Design spans 5' 7.000" Product: Spruce-Pine-Fir #2 2 x 10 2 ply PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. No lateral bracing required along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 352.'# 3946.'# 8% 3.18' Total Load D+S Shear 183.# 2872.# 6% 0.4' Total Load D+S LL Deflection 0.0043" 0.1861" L/999+ 3.18' Total Load S TL Deflection 0.0071" 0.2792" L/999+ 3.18' Total Load D+S Control: Positive Moment DOLs: Live=100% Snow=115% Roof=125% Wind=160% This member has been designed in accordance with NDS 2005 CS Structure™ 2.06.13[Build 1] kmBeamEngine 4.6.1.0 Materials Database 1492 JazabEd40ChestnutAveLeeds11251 12- 5-14 1:08pm 2 of 2 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcB5 Member Type: Beam Application: Roof Comments:Top Lateral Bracing: Continuous Slope: 0.00 / 12 Bottom Lateral Bracing: (See Below) Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 5.6 PLF Filename: Q:\JazabEd40 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 8' 2.75" 0 39 Live Replacement Uniform (PLF) Top 0' 0.00" 8' 2.75" 113 0 Snow Replacement Uniform (PLF) Top 0' 0.00" 9' 8.25" 0 1 Live Replacement Uniform (PLF) Top 8' 2.75" 8' 10.75" 70 24 Snow Replacement Uniform (PLF) Top 8' 10.75" 9' 8.25" 38 11 Snow Point (LBS) Top 9' 2.75" -10 0 Snow Point (LBS) Top 9' 2.75" -0 -3 Live Point (LBS) Top 9' 2.75" 0 1 Live Point (LBS) Top 9' 2.75" 0 26 Live Point (LBS) Top 9' 2.75" 49 0 Snow 1 2 9 8 4 9 8 4 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall N/A N/A 1.500" 703# -- 2 9' 8.250" Wall N/A N/A 1.500" 707# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 1# 499# 204# 2 1# 486# 208# Design spans 8' 11.000" Product: Spruce-Pine-Fir #2 2 x 10 2 ply PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. No lateral bracing required along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 1559.'# 3946.'# 39% 4.84' Total Load D+S Shear 581.# 2872.# 20% 0.4' Total Load D+S LL Deflection 0.0570" 0.2972" L/999+ 4.84' Total Load S TL Deflection 0.0804" 0.4458" L/999+ 4.84' Total Load D+S Control: Positive Moment DOLs: Live=100% Snow=115% Roof=125% Wind=160% This member has been designed in accordance with NDS 2005