Loading...
18WD-1-2LAUNDRY REMOVE CHIMNEY TO SECOND FLOOR GENERAL NOTES: NO CHANGES TO EXISTING FOOTPRINT ALL ADDITIONAL SQUARE FOOTAGE ON SECOND AND THIRD FLOORS IS TO BE ADDED OVER EXISTING BUILDING. NEW LIGHTING FOR MODIFIED BEDROOMS AND ADDITIONAL BATH. NEW PLUMBING FOR THIRD FLOOR BATH SMOKE DETECTORS ARE HARDWIRED CO DETECTORS ARE CEILING MOUNTED AND BATERY POWERED LVL BEAMLVL BEAM POST DOWN TO EXISTING KITCHEN BEAM EXISTING EXTERIOR WALL TO BE REMOVED PROSCRIPTIVE STRETCH CODE COMPLIANCE ALL NEW WALLS - R20 MIN ALL NEW ROOF - R49 MIN ALL NEW WINDOWS - 0.30 MAX U-VALUE DENSE-PACK CELLULOSE = 4.0R/in LOOSE FILL CELLULOSE = 3.5R/in CLOSED CELL FOAM = 6.5R/in 3 - 9 1/2" LVL OR 2 - 12" LVL BEAM S CO S S S EXISTEXIST EXIST EXIST EXIST BATTERY BATH BED ROOM BATH BED ROOM BED ROOM Maple Street Architects Northampton, MA (413) 570-3213 Date: 01 May 2018 Scale: 1/4" = 1' - 0" SCALE: 1/4" = 1'-0" 8'4'2'1'0 N A1.2PLAN LVL 236 Ward Ave Northampton, MA