Loading...
32A-162 A-100_ARTS TRUST_2017_2A_CurrentE008B B010 60" POT SINKS 48" X 30" TABLE HAND SINKE008A009W01-29W01-27 W01-28 W01-32W01-31W01-30SF2-004B020 B019FUTURE THEATER HVAC 125'-0" EXIT SEWER OUT FIRE DEPTCONNECTION TO SPRINKLERS E003A001B018 NEW STRIP DRAIN TO EXISTING UNDERGROUND STORM SYSTEM G0161'-6" SPRINKLER SERVICE 0 5 15 25 35 45 55 FT EXIT ELEC SERVICE SEWAGEEJECTOR HOT WATERSTORAGE TANKS NEW FURNACE FOR 1ST FL PERFORMANCE SPACE BUILDING CENTERBUILDING CENTER 18 RISERS@6.86" EAUPNEWSTAIRS 003 STUDIO 005 STUDIO 004 CORRIDOR 001a EXIST. MECH. 011 MENS 012 WOMENS 007 MECHANICAL 008 UNFINISHED SPACE 009 UNFINISHED SPACE 010 LARGE CLOSET 002 SMALL CLOSET 4E005 W01-INA2222 2 2 3 33 32 2 8 8888 899 9B 5 EXIST'G STRIP DRAIN TO EXIST'G UNDERGROUND STORM SYSTEM 23 B0022B007 COUNTER & SINK A006006 STORAGE UP EXISTING EXTERIOR WALL, NEW INSULATION AND CLADDING EXISTING WALLS TO BE REMOVED INSULATE EXISTING GWB WALL NEW CMU/FURRED WALL 1 2B NEW SHAFT WALL 5 6 NEW FURRED WALL NEW INSULATED GWB WALL3B EXISTING GWB WALL2 NEW GWB WALL3 8 EXISTING CONCRETE WALL9 NEW ACOUSTIC WALL 4 3A 3C A014 A013354" X 44" 2 DOOR FRIDGE 10'-0"15'-0"HOOKS 013 CATERING PREP 014 CLOSET FUTUREDIMMER PANEL 24"COUNTER 1330 SF 3880 SF 1450 SF 215 SF 570SF 1250 SF EXIST EXIST EXIST33 3 24'-0"11'-9"21'-7 1/2"8'-2"1xx 1xx 27'-6"1075 SF 445 SF 185 SF 185 SF MOPSINK SLOPE >1:20 SLOPE >1:20 16'-5"6'-8"11'-0"6'-0" METAL PLATE &RAIL METAL PLATE &RAIL 6'-8"13'-7"9'-0"43 3 3730 SF PERFORMANCE AREA 5'-1"13'-3"6'-0"28'-10"9'-2" 38'-7 1/2"11'-4"9 1/2"72'-8"1'-4" 10'-3"49'-2"37'-3"11'-2 1/2"35'-11"6'-3 1/2"9'-9"15'-9 1/2"19'-6 5/8"001b EXIST. MECH. 7'-2"2'-7"22'-2"24'-8"5'-11" COLUMN FOR STAIRS, SEE STRUCTURAL 1'-4"4'-0"7'-5"2'-8"3 2'-11 1/2"4'-8 1/2"H0175'-8 1/2"3'-10"12'-6 1/2"EXISTING CONCRETE RETAINING WALL TO REMAIN 16'-0"NEW 8" CONC CURBNEW CONC CURB MATCH HEIGHT OF EXIST EXISTING CMU CURB, REPAIR AS REQ'D EXIST 2'-2"3'-1"8'-8"5'-3"22'-2"7'-1"CLEAR18'-8 1/4"35'-1"11'-5 1/2"37'-1"5'-9 1/2"8'-6" 15'-4"3'-9"12'-11 1/4"4'-0"A01111'-4"8'-9 3/8"29'-10" NEW WINDOWS IN EXISTING OPENING 1'-5 7/8" 9"20'-7"NEW 3" CONC CURB9'-9"9"11'-9"7'-7"8'-1 1/2"W01-INBA E FREIGHT ELEVATOR11'-4 3/4"7'-4 1/4" 3 3"3"3" 7"24'-8 1/2" 24'-8 1/2" 9'-0" 19'-7" 20'-10" 13'-1" 11'-5" 13'-4" 11'-8" 13'-6 1/2" 11'-10 1/2" 13'-1" 11'-5" 13'-2 1/2" 11'-6 1/2" 24'-8 1/2" 24'-8 1/2" 9'-0" 19'-7" 20'-10" 13'-1" 11'-5" 13'-4" 11'-8" 13'-6 1/2" 11'-10 1/2" 13'-1" 11'-5" 13'-2 1/2" 11'-6 1/2" 1 2 3 5 3A 6 A B C D E FN1N2N3N4N5 EXIST'G COL.EXIST'G COL.EXIST'G COL.EXIST'G COL.EXIST'G COL.EXIST'G COL.NEW COLUMNNEW COLUMNNEW COLUMNNEW COLUMNNEW COLUMN14'-7 1/2"5'-4 1/4"4'-6 1/4" G1 G2 7 8'-0 3/4"1 A-300 1 A-300 2 A-300 2 A-300 1'-8" 10" 13'-10 1/4"6'-4"5'-0"6'-3 1/2" Architects 196 Pleasant Street, Suite 202 Northampton, MA 01060 413-585-0641 http://www.tdouglasarchitects.com REGISTERED ARCHITECT, COMMONWEALTH OF MASSACHUSETTS THOMAS DOUGLAS Rev Date Description Project Title project Northampton Community Arts Trust 33 Hawley Street, Northampton, MA Issue Date: Drawn By: Checked By: Project ID: Drawing No. 1 PROGRESS10/3/2013 Sheet Title Scale: July 26,2013 td/db/em td 13-016 AS NOTED 2 PRELIMINARY PRICING10/10/2013 3 REVISED PRELIMINARY PRICING10/18/2013 4 PROGRESS PLANS12/13/2013 5 PROGRESS PLANS 1402/10/2014 6 MCFF PLANS 1403/03/2014 7 PRICING08/04/2014 Project No r t h 12/30/2014 REVIEW BY CM8 03/18/2015 90% CD / CM PRICING9 08/20/2015 DEMOLITION REVISIONS11 08/08/2015 DEMOLITION PERMIT SET10 09/14/2015 BUILDING ENVELOPE PROGRESS12 09/15/2015 PLAN/ ELEV /SECTION PROGRESS13 09/22/2015 PERMIT SET14 15 12/08/2015 CD BULLETIN - PHASE 1 16 2/24/2017 CD BULLETIN - PHASE 2A A-100 BASEMENT PLAN LEVEL 0 PLAN BASEMENT 1'-0" = 1/8"1 A-502 12 11 10 9 A-501 X 1 X X 4/A-200 1/A-2003/A-200 2/A-20015 REVISED ENTRY PLAN AND DETAILS REVISED INTERIOR DOOR SCHEDULE ADDED PLAN NOTATIONS & DIMS HATCHED AREA NOT IN PHASE 2A HATCHED AREA NOT IN PHASE 2A PHAS E 2A SPRI N G 2017