32C-107 Northampton Building Order of ConditionsCollrxs -
CnocHrERE
Construction Servrces------_-___r_'-_rN c q &P o R Ar E D
PO. Bax 516
lf ilhrahatn. '\.'L\ o r o9 5
7'd: q r;-ig5-599o
Fax: 1 r;-599-oq64
L.nail:
b t Li Ld @c roc h.i ere. r o nt
Specializing in:
' Commercial Sen'ice
' General Contracting
' Project Management
August L8,2016
2L2Main Street
Northampton, MA 01060
Regarding:
Ralph's Blacksmith Shop/SMJ Metal Company
32-36 Smith Street
Northampton, MA 01060
Collins - Crochiere-Construction Services, Inc. is the construction manager
hired by SMJ Metals/Ralph's Blacksmith Shop to oversee and coordinated
the construction of the expansion of the current miscellaneous metals
fabrication and finishing shop. The project will require all subcontractors,
suppliers and future owner operations to comply with the Order of
Conditions set forth by the Northampton Conservation Commission and
related City Departments. Collins - Crochiere Construction Services, Inc. has
received, read and understands and will comply with the Order of Conditions
Specifically all parties associated with this project will:
Pre Preconstruction Meeting
L. The sequencing plan for the erosion control on site is as follows:
2. Post the sign required by ltem 10. page 5 of 10 Mass DEP....
3. Walk the site and check all wetlands bounds flagging and insure all
are visible.
4. Erosion controls will be installed as noted on the Berkshire Design
drawings 'Sheet L of L" dated August 11, 2015 and 1.1 dated
September L8,2015
5. Site contractor will install silt barriers.
6. Site contractor shall remove concrete pads and slabs, remove
extraneous sand left behind by industrial operations, and scarify soils
in the areas required by the Berkshire Design drawings 'Sheet L of 1"
dated August 11,20L5 and L.l dated September 18,2015.
7. Site Contractor shall place boulders to establish the edge of wetlands
replication areas.
8. Post all "Order of Conditions" paperwork and plans in a visible
location on site for operators and workers information.
9. Pre-construction on site meeting shall be held to review work.
10. Work on site and erosion controls will be checked daily during work
on site to monitor the condition of erosion controls and make any
repairs, clean up necessary. After work on site is complete, erosion
control and wetland replication areas will be inspected weekly and
\\'BE C'ertified
after any rainfail to check on conditions, repairs needed and
compliance.
11. A supply of emergency repair materials will be kept on site available
for repairs until stabilization areas reach permanent status.
12. All disturbed areas will be graded, loamed, seeded or covered with
erosion control mesh, netting and straw prior to November 30 of
each year, until stabilization areas reach permanent status.
13. This contractor will request a certificate of compliance when the
stabilization areas reach at least 7s% of the surface of each
restoration area has been re-established in indigenous plants after
three growing seasons.
L4. conditions that do not expire with the issuance of a certificate of
Compliance are items numbered 39,34,35 in the order of
conditions; the property owner is familiar with these notifications,
instructions and maintenance requirements.
15' Stone boulders shall be used to demark the riverfront restoration
area and shall be maintained in perpetuity."' 16. The restoration plan is as required and noted in the Berkshire Design
drawings 'Sheet t of I" dated August 1l_, 2015 and 1.1 dated
September 18,2015.
Please call with any questions.
Tom Crochiere
Project Manager,
Collins - Crochiere Construction Services, Inc.
Office:
P. O. Box 535
Wilbraham, MA 01095
Shop:
340 McKinstry Avenue, Chicopee, MA 01013
CC: Sarah Lavalley
Conservation, Preservation and Land Use planner
City of Northampton
Office of Planning and Sustainability
210 Main Street. Room 11
Northampton, MA 01060