Loading...
32C-107 Northampton Building Order of ConditionsCollrxs - CnocHrERE Construction Servrces------_-___r_'-_rN c q &P o R Ar E D PO. Bax 516 lf ilhrahatn. '\.'L\ o r o9 5 7'd: q r;-ig5-599o Fax: 1 r;-599-oq64 L.nail: b t Li Ld @c roc h.i ere. r o nt Specializing in: ' Commercial Sen'ice ' General Contracting ' Project Management August L8,2016 2L2Main Street Northampton, MA 01060 Regarding: Ralph's Blacksmith Shop/SMJ Metal Company 32-36 Smith Street Northampton, MA 01060 Collins - Crochiere-Construction Services, Inc. is the construction manager hired by SMJ Metals/Ralph's Blacksmith Shop to oversee and coordinated the construction of the expansion of the current miscellaneous metals fabrication and finishing shop. The project will require all subcontractors, suppliers and future owner operations to comply with the Order of Conditions set forth by the Northampton Conservation Commission and related City Departments. Collins - Crochiere Construction Services, Inc. has received, read and understands and will comply with the Order of Conditions Specifically all parties associated with this project will: Pre Preconstruction Meeting L. The sequencing plan for the erosion control on site is as follows: 2. Post the sign required by ltem 10. page 5 of 10 Mass DEP.... 3. Walk the site and check all wetlands bounds flagging and insure all are visible. 4. Erosion controls will be installed as noted on the Berkshire Design drawings 'Sheet L of L" dated August 11, 2015 and 1.1 dated September L8,2015 5. Site contractor will install silt barriers. 6. Site contractor shall remove concrete pads and slabs, remove extraneous sand left behind by industrial operations, and scarify soils in the areas required by the Berkshire Design drawings 'Sheet L of 1" dated August 11,20L5 and L.l dated September 18,2015. 7. Site Contractor shall place boulders to establish the edge of wetlands replication areas. 8. Post all "Order of Conditions" paperwork and plans in a visible location on site for operators and workers information. 9. Pre-construction on site meeting shall be held to review work. 10. Work on site and erosion controls will be checked daily during work on site to monitor the condition of erosion controls and make any repairs, clean up necessary. After work on site is complete, erosion control and wetland replication areas will be inspected weekly and \\'BE C'ertified after any rainfail to check on conditions, repairs needed and compliance. 11. A supply of emergency repair materials will be kept on site available for repairs until stabilization areas reach permanent status. 12. All disturbed areas will be graded, loamed, seeded or covered with erosion control mesh, netting and straw prior to November 30 of each year, until stabilization areas reach permanent status. 13. This contractor will request a certificate of compliance when the stabilization areas reach at least 7s% of the surface of each restoration area has been re-established in indigenous plants after three growing seasons. L4. conditions that do not expire with the issuance of a certificate of Compliance are items numbered 39,34,35 in the order of conditions; the property owner is familiar with these notifications, instructions and maintenance requirements. 15' Stone boulders shall be used to demark the riverfront restoration area and shall be maintained in perpetuity."' 16. The restoration plan is as required and noted in the Berkshire Design drawings 'Sheet t of I" dated August 1l_, 2015 and 1.1 dated September 18,2015. Please call with any questions. Tom Crochiere Project Manager, Collins - Crochiere Construction Services, Inc. Office: P. O. Box 535 Wilbraham, MA 01095 Shop: 340 McKinstry Avenue, Chicopee, MA 01013 CC: Sarah Lavalley Conservation, Preservation and Land Use planner City of Northampton Office of Planning and Sustainability 210 Main Street. Room 11 Northampton, MA 01060