Loading...
24D-067 32PerkinsUpstairsBathPlan4 copy32 Perkins Second Floor Bathroom Renovation 1st Landing NTS 2nd Landing NTS 2’4” high 6’8” required headroom from nosing6’ high 55”x22” 12’7” x 5’2” Vanity Cabinet 54x21 Vanity Top 55x22 55” TBD”TBD”TBD” SS 55”x22” 12’6” x 5’2” S SSfan23”x32” New Window New Window30” 36” 25.5” (Remove Exis. Window)47.5x 41.5Notes: - Exterior wall drywall to be removed, Exterior walls to be re-insulated with foam board