24D-067 32PerkinsUpstairsBathPlan4 copy32 Perkins Second Floor Bathroom Renovation
1st
Landing
NTS
2nd
Landing
NTS
2’4” high
6’8” required headroom from nosing6’ high
55”x22”
12’7” x 5’2”
Vanity Cabinet 54x21
Vanity Top 55x22
55”
TBD”TBD”TBD”
SS
55”x22”
12’6” x 5’2”
S SSfan23”x32”
New Window
New Window30”
36” 25.5”
(Remove
Exis. Window)47.5x 41.5Notes:
- Exterior wall drywall to be removed, Exterior walls to be re-insulated with
foam board