Loading...
31B-282 Rpts+38,39,+56+Day+BreaksProject Number: Project: Client: Address: Attn: REPORT OF CONCRETE CYLINDER TEST Allied Testing Laboratories, Inc. 115 St. George Rd. Springfield, MA 01104 Report Date: 6/29/12 City of Northampton, Police Northampton Police Station City of Northampton 2I0 Main Street Northampton, MA 01060 Report Number: 3 B FIELD TEST CONDI Date Placed: s/3/2012 Time Sampled 12 :75 Location of Sample: Parking Garage, Retaining Wal-l Footing Supplien Construction Service ASTM C 31 Truck Number: 219 Mix Number: Design Strength: 4 000 Time Batched: 11 : 53 Batch Size: t- t slump: 6.5 (ASTMC143) Concrete Temp: 66 (ASTM c 1064) Water Added: xo water Added on Site Ticket Number: B2B9 Time Placed: 12: oj Air Content: 6 . 5 (ASTM c 173) Ambient Temp: 60 Technician: Marc M. LABORAT c39 Specimen A- 167 A-168 A-169 A-170 Test Date 5/L0/2012 5/3L/2012 5/3r/2012 6/28/2012 Strength 1830 3450 3640 4 010 Percent of Design 46e" 86? 9re" 100% TYPES OF FRACTURE Type of Fracture 5 5 q 5 Age 1 28 2B 56 Load Diameter Area22950 4.00 72.5743355 4.00 12.57 45785 4.00 12.5750330 4.00 !2.s7 Remarks: Reinforcing incorporated in today' s concrete placement was found to be satj_sfactory for size quantity, cl,eanl-iness, properly supported adequately tied and spaced as required Copies to: Type 3ntltl Type 6 Reportedby: / {d,Richard eelfucci XXKruffi Typo 1 t\ It\ll'l Type 4 Type 2 t|ltI-J LJ Type 5 President Project Number: Project: Client: Address: Attn: REPORT OF CONCRETE CYLINDER TEST Allied Testing Laboratories, Inc. 115 St. George Rd. Springfield, MA 01104 Report Date: 6/29/12 City of Northampton, Police Northampton Pol-ice Station City of Northampton 2I0 Main Street Northampton, MA 01060 Report Number: 3 9 CONDITI Date Placed: 5/3/2012 Time Sampled: 13 : 15 Location of Sample. t0 Line, A-C & 10 Line Supplier Construction Service Truck Number: 341 Mix Number: Design Strength: 4000 Time Batched: 12:25 Batch Size: t t Slump: z (ASTMc143) Concrete Temp: ea (ASTM c 1064) Water Added: uo water Added on Site to 9 Line Ticket Number: B29r Time Placed: 13 : 00 AirContent: 6.7 (ASrM c173) Ambient Temp: 60 Technici?Ilr Marc M. Specimen A-171 A-71 2 A-173 A-I1 4 Test Date 5/L0/2012 s/3L/2012 5/37/2072 6/28/2012 Strength 207 0 3710 3950 4 510 Percent of Design 52eo 93? 992 1 13U TYPES OF FRACTURE Type of Fracture q 5 5 5 Age 7 28 2B 56 Load Diameter Area25970 4.00 12.5746660 4.00 12.5749655 4.00 12.5156700 4.00 12.57 Remarks: Reinf orcing j-ncorporated in Loday' s concrete placement was found to be satisfactory for sizequantity, cleanl_iness, properly supported adequately tied and spaced as requireC Copies to: Type 1 t\lt\t Type 4 Type2 Type 5 XXNruffi rD Type 3 tltl Type 6 Richard Bell_ucci President Reported by: