Loading...
31B-282 NPD Punchlist All Floors5-16-12Pg. 1 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 1 101 Grffin Light not working COMPLETE 5/15/2012 2 101 Dandis Marks on walls COMPLETE 5/15/2012 3 101 West Base at radiator loose 4 101 Dandis Paint on sills COMPLETE 5/15/2012 5 101 Dandis Touch-up at door frame and borrowed light COMPLETE 5/15/2012 6 102 Dandis Marks on walls 7 102 Higgins Carpet coming up near borrowed lite 8 102 PDC/Dandis Fix window after test need paint & patch 9 103 Grffin One light not working COMPLETE 5/15/2012 10 103 Conn Ceiling tiles out COMPLETE 5/15/2012 11 103 Dandis Touch-up at radiator recess COMPLETE 5/15/2012 12 103 West Loose base at radiator trim top of base @ all rooms 13 103 PDC Damaged wall near window patch needs to be painted 14 104 Grffin Three Lights not working COMPLETE 5/15/2012 15 104 Conn Ceiling tiles out COMPLETE 5/15/2012 16 104 Dandis Marks on walls COMPLETE 5/15/2012 17 104 West Loose base at radiators trim top of base @ all rooms 18 104 PDC/Dandis Damage dry wall at entry COMPLETE 5/15/2012 19 105 Grffin Lights not working COMPLETE 5/15/2012 20 105 Lizotte Change screen waiting for direction 21 105 Armani Caulking at window cracked touch-up paint from wds test 22 105 Dandis Paint on gun rail COMPLETE 5/15/2012 23 105 West Cut out base at radiator trim top of base @ all rooms 24 106 Higgins Carpet coming up fix @ right of door 25 106 Dandis Touch-up in lower corner COMPLETE 5/15/2012 26 106 Dandis Marks on wall COMPLETE 5/15/2012 27 107 Frontline Clean COMPLETE 5/15/2012 28 107 Grffin Scratches on lights COMPLETE 5/15/2012 29 107 PDC Dry wall at ceiling damper controls is poor COMPLETE 5/15/2012 30 107 PDC Crack in drywall above door patched; needs paint 31 107 PDC Dry wall at corner of door frame is poor patched; needs paint 32 107 Dandis Touch-up at walls COMPLETE 5/15/2012 33 108 Armani Caulk window counter COMPLETE 5/15/2012 34 108 Conn Tiles out COMPLETE 5/15/2012 35 108 Higgins Carpet coming up 36 108 PDC Damage wall near door to copier COMPLETE 5/15/2012 37 108 Dandis Touch-up at door frame COMPLETE 5/15/2012 38 108 Dandis Drips on wall to closet COMPLETE 5/15/2012 39 108 Dandis Paint sprinkler pipe at window COMPLETE 5/15/2012 40 108 Armani Gaps in window sill caulking COMPLETE 5/15/2012 41 108 West Cut out base at radiator recess trim top of base @ all rooms 42 108 PDC Cut in dry wall near front window COMPLETE 5/15/2012 43 108 PDC Patch wall at window COMPLETE 5/15/2012 44 108 Lizotte Fill gap at head of counter window COMPLETE 5/15/2012 45 108 Grffin Lights not working COMPLETE 5/15/2012 46 108A Frontline Clean COMPLETE 5/15/2012 47 108A Conn Tiles out COMPLETE 5/15/2012 48 108A PDC Hole in GYP near door frame hook up COMPLETE 5/15/2012 Pg. 2 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 49 108A Dandis Touch-up walls COMPLETE 5/15/2012 50 109 All Not done 51 109 Lizotte Fill gaps at window heads 52 109 Grffin Light fixture hanging down 53 109 PDC Damage GYP at 126 corridor 54 111 Grffin Lights not working COMPLETE 5/15/2012 55 111 Dandis Paint at radiator recess COMPLETE 5/15/2012 56 111 Conn Ceiling tile out COMPLETE 5/15/2012 57 111 Dandis Paint on gun rail COMPLETE 5/15/2012 58 111 Dandis Paint on at light switches COMPLETE 5/15/2012 59 111 Conn Damage ceiling tile near vest COMPLETE 5/15/2012 60 111 Sterling Missing window sill COMPLETE 5/15/2012 61 111 PDC/Dandis Patch GYP at window jambs COMPLETE 5/15/2012 62 111A Chabott Fill gap in block COMPLETE 5/15/2012 63 111A Conn Tile out COMPLETE 5/15/2012 64 112 Grffin Light not working COMPLETE 5/15/2012 65 112 PDC/Dandis Damage drywall behind door need to paint 66 112 Grffin Monitor not installed COMPLETE 5/15/2012 67 112 Armani Caulking at window frame COMPLETE 5/15/2012 68 112 Dandis Run in door stain COMPLETE 5/15/2012 69 112 Dandis Touch-up paint at door frames COMPLETE 5/15/2012 70 114 Armani Caulk around window frame COMPLETE 5/15/2012 71 114 Sterling install grommet covers COMPLETE 5/15/2012 72 114 Grffin Open outlet box COMPLETE 5/15/2012 73 114 Conn Tiles open COMPLETE 5/15/2012 74 114 Dandis Paint on door COMPLETE 5/15/2012 75 114 Dandis Touch-up near door frame COMPLETE 5/15/2012 76 114 Dandis Paint near thermo is poor COMPLETE 5/15/2012 77 115 Dandis Touch-up paint on walls COMPLETE 5/15/2012 78 115 Sterling Grommet covers need COMPLETE 5/15/2012 79 115 Conn Open tiles COMPLETE 5/15/2012 80 115 Dandis Touch-up paint on door frames COMPLETE 5/15/2012 81 115 O'Connor Door silencers not installed COMPLETE 5/15/2012 82 116 Dandis Touch up paint at door frame COMPLETE 5/15/2012 83 116 O'Connor silencers still needed 84 117 Capital/West Floor not installed/base COMPLETE 5/15/2012 85 117 Dandis Touch-up at doors frames and walls COMPLETE 5/15/2012 86 117 Grffin Outlets open Shanix needs to finish 87 120A Higgins Transition strip at floor needs to be done 88 120A PDC Fire calking at conduit COMPLETE 5/15/2012 89 120A Chabott fill gaps in cmu joints Done - needs paint 90 120A Dandis Touch-up paint at door frames COMPLETE 5/15/2012 91 128 All Cant get in Room now complete 92 128 Conn Open tiles COMPLETE 5/15/2012 93 128 Frontline Clean COMPLETE 5/15/2012 94 128 PDC/Dandis Wall are beign patched COMPLETE 5/15/2012 95 128 Donnegan Gun cabinet not installed waiting for locker 96 128 Grffin damage outlet at stair COMPLETE 5/15/2012 Pg. 3 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 97 128 Grffin Open outlet at stair COMPLETE 5/15/2012 98 128B Dandis Paint on gun rail COMPLETE 5/15/2012 99 128B Dandis Touch-up paint frame to seargents COMPLETE 5/15/2012 100 128C Dandis Paint on gun rail COMPLETE 5/15/2012 101 128C Dandis Marks on walls COMPLETE 5/15/2012 102 128C Conn Open tiles COMPLETE 5/15/2012 103 128C Dandis Touch up at door to men's COMPLETE 5/15/2012 104 128E Frontline Clean 105 128E Dandis Touch-up paint near switches 106 130 Sterling Scratch in counter at sink COMPLETE 5/15/2012 107 130 Sterling mark on out side corner trim COMPLETE 5/15/2012 108 130 Dandis Paint access panel in stall COMPLETE 5/15/2012 109 130 Conn Open tiles Not done COMPLETE 5/15/2012 110 132 Frontline Clean COMPLETE 5/15/2012 111 133 Conn Open tiles COMPLETE 5/15/2012 112 133 Dandis Paint in counter top and lights COMPLETE 5/15/2012 113 Stair B Chabott Put in expansion joint 114 Stair B All Not finished 115 201 PDC/Dandis Wall patch at TV outlet COMPLETE 5/14/212 116 201 Higgins Gaps in carpet COMPLETE 5/14/212 117 201 Conn Compound on grid in COMPLETE 5/14/212 118 201 Conn Dirt on tile at sensor COMPLETE 5/14/212 119 201 Dandis Touch-up door frame on outside COMPLETE 5/14/212 120 202 Conn Missing ceiling tiles COMPLETE 5/14/212 121 202 PDC/Dandis holes in gyp behind door COMPLETE 5/14/212 122 202 PDC/Dandis Marks in bottom of wall (blue)COMPLETE 5/14/212 123 202 Dandis Paint on reily grid in corners COMPLETE 5/14/212 124 202 Dandis runs on wall above swith COMPLETE 5/14/212 125 203 Dandis Touch up near outlet COMPLETE 5/14/212 126 203 Conn Marks on ceiling COMPLETE 5/14/212 127 203 Higgins Carpet dirty and stained and coming up COMPLETE 5/14/212 128 203 O'Connor Door skratched COMPLETE 5/14/212 129 203 Dandis Touch- up paint at door frame COMPLETE 5/14/212 130 203 Conn Missing ceiling tiles COMPLETE 5/14/212 131 203 PDC/Dandis Marks on wall near outlets COMPLETE 5/14/212 132 203 PDC/Dandis Marks on wall near strobe COMPLETE 5/14/212 133 203 Frontline Walls dirty COMPLETE 5/14/212 134 203 Dandis Touch-up paint at radiator COMPLETE 5/14/212 135 203 PDC Gap at frame to office 207 COMPLETE 5/14/212 136 204 Grffin Light not working COMPLETE 5/14/212 137 204 Grffin Open outlets open-gray wires(Shanix) 138 204 Higgins Carpet coming up COMPLETE 5/14/212 139 205 Conn Missing ceiling COMPLETE 5/14/212 140 205 Grffin light not working COMPLETE 5/14/212 141 205 Higgins Transition strip missing not complete 142 206 Grffin Outlet open open-gray wires(Shanix) 143 206 Higgins Carpet coming up COMPLETE 5/14/212 144 206 PDC/Dandis marks in wall behind door COMPLETE 5/14/212 Pg. 4 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 145 207 PDC/Dandis Marked wall at oulets COMPLETE 5/14/212 146 207 Conn ceiling tiles missing COMPLETE 5/14/212 147 207 Dandis Paint runs COMPLETE 5/14/212 148 207 Higgins Gaps in carpet COMPLETE 5/14/212 149 207 Dandis Touch-up at bottom of heat recess COMPLETE 5/14/212 150 208 O'Connor Cores not installed COMPLETE 5/14/212 151 208 Dandis Paint on door jamb COMPLETE 5/14/212 152 208 Conn Ceiling tile missing COMPLETE 5/14/212 153 208 Higgins Gaps in carpet COMPLETE 5/14/212 154 208 Dandis Writing on wall COMPLETE 5/14/212 155 208 Frontline Carpet dirty COMPLETE 5/14/212 156 208 Dandis Paint runs near closet COMPLETE 5/14/212 157 208 All Closet locked opened - needs cleaning 158 209 Frontline Room not clean COMPLETE 5/14/212 159 209 Conn Missing ceiling tile COMPLETE 5/14/212 160 209 Dandis sprinkler pipe to be painted COMPLETE 5/14/212 161 209 Dandis Window soffit paint runs COMPLETE 5/14/212 162 209 Conn Dirty ceiling tile at projection COMPLETE 5/14/212 163 209 Dandis Paint on outlet cover 3 COMPLETE 5/14/212 164 209 Dandis Writing / touch-up on walls COMPLETE 5/14/212 165 210 O'Connor Closet doors not flush COMPLETE 5/14/212 166 210 Dandis Marks on walls near outlets COMPLETE 5/14/212 167 210 Higgins Carpet coming up COMPLETE 5/14/212 168 210 West Base not flish at outlets COMPLETE 5/14/212 169 210 Dandis Touch-up paint at radiator COMPLETE 5/14/212 170 210 Frontline Clean COMPLETE 5/14/212 171 210 Sterling Cloths hook missing Sterling 172 211 Frontline Clean COMPLETE 5/14/212 173 211 Conn Ceiling tiles out COMPLETE 5/14/212 174 211 Automation Shower curtain missing missing - hooks installed 175 211 Dandis Paint on ceiling grid COMPLETE 5/14/212 176 211 Dandis Paint on wall trim COMPLETE 5/14/212 177 212 Frontline Clean COMPLETE 5/14/212 178 212 Higgins Carpet coming up COMPLETE 5/14/212 179 212 Conn Ceiling missing COMPLETE 5/14/212 180 212 PDC/Dandis Wall patch behind door COMPLETE 5/14/212 181 212 Dandis Paint chips at courner COMPLETE 5/14/212 182 212 West Waves at Rubber Base still needs work 183 213 Conn Damaged ceiling tile at window COMPLETE 5/14/212 184 213 Dandis Paint run at door 215 frame COMPLETE 5/14/212 185 213 Dandis Paint scratch at bottom of entry door frame COMPLETE 5/14/212 186 213 Dandis Marks on walls near outlets COMPLETE 5/14/212 187 213 Conn Tiles not sitting in grid COMPLETE 5/14/212 188 213 B-G HVAC wall register dirty COMPLETE 5/14/212 189 213 Dandis Paint runs on walls COMPLETE 5/14/212 190 213 Dandis Paint missing at outside corners COMPLETE 5/14/212 191 213 Higgins Carpet coming up at walls COMPLETE 5/14/212 192 213 Grffin missing outlet COMPLETE 5/14/212 Pg. 5 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 193 213 Frontline Clean Doors COMPLETE 5/14/212 194 213 Lizotte Sliding window missing COMPLETE 5/14/212 195 213 Armani Caulk at sliding window head COMPLETE 5/14/212 196 213 Dandis Toush-up paint on walls and around outlets COMPLETE 5/14/212 197 213 Armani caulking at door 213-2 is poor COMPLETE 5/14/212 198 213A Dandis Paint at access panel is poor COMPLETE 5/14/212 199 213A Conn Ceiling tiles out COMPLETE 5/14/212 200 213A Dandis Missing paint at radi access COMPLETE 5/14/212 201 213A Armani Caulk left window at corners COMPLETE 5/14/212 202 213A Sterling Cabinet shelf missing still missing 203 213A Dandis Door frame touch up COMPLETE 5/14/212 204 214 Frontline Clean COMPLETE 5/14/212 205 214 Higgins Stains on carpet COMPLETE 5/14/212 206 214 Dandis Poor paint joint at ceiling needs to be done 207 215 Conn Ceiling tile out/not flush COMPLETE 5/14/212 208 215 Dandis Paint scratches on frame COMPLETE 5/14/212 209 215 Higgins Carpet coming up COMPLETE 5/14/212 210 216 Conn Tiles not sitting on grid COMPLETE 5/14/212 211 216 Dandis Paint runs in corners COMPLETE 5/14/212 212 216 Dandis Paint on gun rail COMPLETE 5/14/212 213 216 PDC/Dandis Touch-up on walls COMPLETE 5/14/212 214 216 Conn Gap at ceiling grid at door to copier COMPLETE 5/14/212 215 216 Dandis Paint caulking at door 214 COMPLETE 5/14/212 216 216 Dandis Paint at chief door poor COMPLETE 5/14/212 217 216 Higgins Carpet coming up at wals COMPLETE 5/14/212 218 217 Conn Ceiling tiles not sitting in grid COMPLETE 5/14/212 219 217 Higgins Carpet not tight to the base at door COMPLETE 5/14/212 220 217 Automation Change projector screen waiting for direction 221 217 Dandis Touch-up paint at prox radiator COMPLETE 5/14/212 222 217 Dandis Touch-up paint at door frame COMPLETE 5/14/212 223 217 West Base behind admin door coming off needs to be done 224 217 Conn Damaged ceiling tile at sprinkler head needs to be done 225 218 Frontline Clean COMPLETE 5/14/212 226 218 Dandis Touch-up paint on walls and around sliding window COMPLETE 5/14/212 227 218 Armani Caulk at window head COMPLETE 5/14/212 228 218 O'Connor Scratch on wood door from hall COMPLETE 5/14/212 229 219 PDC/Dandis Touch-up at walls and outlets COMPLETE 5/14/212 230 219 Dandis Paint on wall base COMPLETE 5/14/212 231 219 Dandis Paint runs in corners COMPLETE 5/14/212 232 219 West Floor not clean at base COMPLETE 5/14/212 233 219 Dandis Door frame needs touch-up COMPLETE 5/14/212 234 219 Dandis Paint runs on door frames COMPLETE 5/14/212 235 220 Frontline Room not cleaned COMPLETE 5/14/212 236 220 Dandis Touch-up Paint at door frames COMPLETE 5/14/212 237 220 B-G Scratches on deffuser/tape needs to be done 238 221 Dandis South wall below chair rail to be blue in circle COMPLETE 5/14/212 239 222 Frontline Room not cleaned COMPLETE 5/14/212 240 222 Dandis Paint Caulking needs to be done Pg. 6 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 241 222 Armani Caulk corner at door COMPLETE 5/14/212 242 222 Chabott CMU cracked at bottom-fill with mortar COMPLETE 5/14/212 243 224 Conn Ceiling tiles out COMPLETE 5/14/212 244 224 Higgins Brown carpet seams are poor needs to be done 245 224 Armani Caulk at corner of window frames Done - needs paint 246 224 PDC/Dandis chips in wall at switches COMPLETE 5/14/212 247 224 Higgins Carpet coming up at walls COMPLETE 5/14/212 248 224 Higgins Gaps at base of the carpet COMPLETE 5/14/212 249 224 Dandis Drip at top of entry door COMPLETE 5/14/212 250 224 Dandis Paint above outlets COMPLETE 5/14/212 251 224 Dandis Paint at side of door frame COMPLETE 5/14/212 252 225 Frontline Clean room COMPLETE 5/14/212 253 225 Dandis Complete wall painting COMPLETE 5/14/212 254 225 All Remove extra Material COMPLETE 5/14/212 255 226 All Not Ready clean fire caulk off grid 256 227 Armani Caulk between bottom borrow lite and floor COMPLETE 5/14/212 257 227 Dandis Touch at thermostat & above outlet and wdw jambs COMPLETE 5/14/212 258 227 B-G panel behind radiator not flush COMPLETE 5/14/212 259 227A Frontline Clean Walls COMPLETE 5/14/212 260 227A Dandis Touch-up at top of door head COMPLETE 5/14/212 261 227A O'Connor scratches on door COMPLETE 5/14/212 262 227A O'Connor dent in door frame COMPLETE 5/14/212 263 229 Conn Ceiling tile missing open for AHU work 264 229 Dandis Paint on cove near toilet COMPLETE 5/14/212 265 228 Griffin One light not working COMPLETE 5/14/212 266 228 Dandis Paint on cove base COMPLETE 5/14/212 267 228 Conn Ceiling tiles missing open for AHU work 268 228 Dandis Paint around firealarm poor still needs touchup 269 230 All Not Ready cleaned out 270 231 Frontline Clean door COMPLETE 5/14/212 271 231 Griffin 2 Lights not working COMPLETE 5/14/212 272 231 Dandis Paint at switch COMPLETE 5/14/212 273 231 Dandis Paint on window glass needs to be cleaned outside 274 231 Sterling Cabinet shelving not installed COMPLETE 5/14/212 275 231 Conn Hanger on grid?COMPLETE 5/14/212 276 231 Adams Disposal not working COMPLETE 5/14/212 277 231 Conn Chips in ceailing grid COMPLETE 5/14/212 278 232 Griffin Lights not working COMPLETE 5/14/212 279 232 PDC/Dandis Touch-up at radiator tape done - needs paint 280 232 Frontline Clean door COMPLETE 5/14/212 281 233 Griffin One light not working COMPLETE 5/14/212 282 233 Conn Ceiling tile missing COMPLETE 5/14/212 283 233 PDC/Dandis Damaged dry wall at door COMPLETE 5/14/212 284 233 Dandis Marks on wall COMPLETE 5/14/212 285 233 PDC/Dandis Touch-up at radiator recess COMPLETE 5/14/212 286 234 Dandis Blue paint on wall COMPLETE 5/14/212 287 234 Dandis Marks on wall COMPLETE 5/14/212 288 234 Dandis Paint trim at window poor COMPLETE 5/14/212 Pg. 7 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 289 234 West Wall base coming off corner COMPLETE 5/14/212 290 234 Frontline door dirty COMPLETE 5/14/212 291 229 Corr.Dandis Paint on grid near soffit COMPLETE 5/14/212 292 229 Corr.Dandis Marks on walls COMPLETE 5/14/212 293 229 Corr.West Base loose at toilet rooms COMPLETE 5/14/212 294 229 Corr.PDC/Dandis Damage gyp at lounge corner COMPLETE 5/14/212 295 208 Corr.Sterling Wave in gun rail on walls needs caulking 296 208 Corr.Dandis Marks on lower walls (1) left to fix 297 208 Corr.Smith Sprinkler head cover not thight COMPLETE 5/14/212 298 208 Corr.Dandis Paint on frame to 208 need touch-up COMPLETE 5/14/212 299 208 Corr.Dandis Paint on gun rail to copier damaged COMPLETE 5/14/212 300 208 Corr.Dandis Paint on ceiling grid COMPLETE 5/14/212 301 217 Corr.Dandis Marks on walls COMPLETE 5/14/212 302 217 Corr.??????FIY wall at door 218-2 COMPLETE 5/14/212 303 217 Corr.Dandis Paint at edges between colors is poor COMPLETE 5/14/212 304 217 Corr.Armani Caulk on elevator trim needs paint 305 217 Corr.Conn Replace mark ceiling tiles COMPLETE 5/14/212 306 227A Corr.Dandis Marks on walls COMPLETE 5/14/212 307 227A Corr.Conn Damaged ceiling tile at light speaker COMPLETE 5/14/212 308 001 Griffin Install Light COMPLETE 5/15/2012 309 001 Dandis Seal Floor COMPLETE 5/15/2012 310 001 B-G Install Filters Waiting for AHU 311 001 Chabott Fill hole in wall COMPLETE 5/15/2012 312 001 Frontline Clean Walls COMPLETE 5/15/2012 313 001 Chabott Clean Mortar off Top of W alls at Shaft COMPLETE 5/15/2012 314 003 Frontline Clean COMPLETE 5/16/2012 315 003 Conn Tiles out COMPLETE 5/16/2012 316 003 Dandis Marks on door frames COMPLETE 5/16/2012 317 003 Dandis Marks on walls Paint/Patch 318 003 O'Connor Door hardware not installed COMPLETE 5/16/2012 319 004 Griffin Lights not woking COMPLETE 5/16/2012 320 004 Dandis Seal floor COMPLETE 5/16/2012 321 004 Chabott Fill gap at floor to range Armani to review 322 004 Dandis Marks on door COMPLETE 5/16/2012 323 006 Dandis Paint behind drain pipe Final coat needed 324 006 Griffin Fill top of outlet COMPLETE 5/16/2012 325 006 Island Clean fire proofing off steel struts Diagonal angles? 326 006 Dandis Clean and Paint wall at cores Paint 327 008 Frontline Clean COMPLETE 5/16/2012 328 008 Griffin Lights not working COMPLETE 5/16/2012 329 008 Conn Tiles out COMPLETE 5/16/2012 330 008 Dandis Paint at outlets / marks on walls COMPLETE 5/16/2012 331 008 PDC/Dandis Damage and paint runs at column/gyp Fix touch-up 332 009 West Wall base? 333 009 Dandis Paint door frame COMPLETE 5/16/2012 334 009 Dandis Marks on walls COMPLETE 5/16/2012 335 009 Conn Tiles out COMPLETE 5/16/2012 336 009 Chabott Chips in wall COMPLETE 5/16/2012 Pg. 8 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 337 009 Dandis Paint to floor COMPLETE 5/16/2012 338 009 B-G around duct covers COMPLETE 5/16/2012 339 010 Adams Leak in corner? 340 010 Chabott Fill/Patch wall under service 341 011 Dandis Paint walls COMPLETE 5/16/2012 342 011 Chabott Fill gap above outlet COMPLETE 5/16/2012 343 011 Dandis Paint fire stopping Touch-up 344 011 Dandis Floor Sealer Still need to do 345 011 O'Connor Install door silencers Still need to do 346 012 Dandis Paint walls COMPLETE 5/16/2012 347 012 Dandis Scratches in doors COMPLETE 5/16/2012 348 012 Dandis Paint door frames Ext. DR frame needs paint 349 013A Dandis Paint wall DONE - touchup needed 350 013A Frontline Clean COMPLETE 5/16/2012 351 013A Dandis Floor sealer COMPLETE 5/16/2012 352 013A B-G Move smoke to ceiling COMPLETE 5/16/2012 353 013A Dandis Paint at faucet COMPLETE 5/16/2012 354 013A Dandis Chips and paint runs on walls Touch-up 355 013A Dandis Paint door frame inside COMPLETE 5/16/2012 356 015 Higgins Install floor COMPLETE 5/16/2012 357 015 Frontline Clean COMPLETE 5/16/2012 358 015 Donnegan Run refrig unit COMPLETE 5/16/2012 359 015 Dandis Marks on walls COMPLETE 5/16/2012 360 015 Dandis Crack on wall at door to 017 Paint 361 016 Griffin Open outlet box COMPLETE 5/16/2012 362 016 Higgins/West install floor / add base COMPLETE 5/16/2012 363 016 Frontline Clean COMPLETE 5/16/2012 364 016 Chabott Chips in walls at ceailing COMPLETE 5/16/2012 365 016 Dandis Paint near data outlets Touch-up 366 016 Dandis Paint runs at door frames COMPLETE 5/16/2012 367 016A Frontline Clean COMPLETE 5/16/2012 368 016A Griffin Fill voids at top of all outlets Caulk touch-up 369 016A Higgins/West Install floor and base COMPLETE 5/16/2012 370 016A Dandis Paint at door frame COMPLETE 5/16/2012 371 017 Dandis Paint all of drain pipes Needs another coat 372 017 B-G Why only insulated at top? 373 017 B-G Small chips in walls-paint COMPLETE 5/16/2012 374 004 Griffin Lighting control not functioning COMPLETE 5/16/2012 375 008 Griffin Lighting control not functioning COMPLETE 5/16/2012 376 015A Smith Sprinkler missing in Janitor 015A 377 LL Griffin Complete all receptacle installations and wiring within loc COMPLETE 5/16/2012 378 LL Griffin Remove all smoke detector covers 379 LL Griffin Complete and commission all security systems 380 LL Griffin Provide correct device cover plates for all outlets, switche COMPLETE 5/16/2012 381 LL Griffin Label receptacle device plates COMPLETE 5/16/2012 382 101 Griffin Lighting operational problems COMPLETE 5/16/2012 383 102 Griffin Lighting operational problems COMPLETE 5/16/2012 384 105 Griffin Lighting operational problems COMPLETE 5/16/2012 Pg. 9 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 385 108 Griffin Incorrect device plates COMPLETE 5/16/2012 386 108 Griffin Lighting operational problems COMPLETE 5/16/2012 387 109 Griffin Lighting operational problems COMPLETE 5/16/2012 388 109 Griffin Incorrect device plates COMPLETE 5/16/2012 389 111 Griffin Incorrect device plates COMPLETE 5/16/2012 390 111 Griffin Lighting operational problems COMPLETE 5/16/2012 391 111 Griffin Complete AV system installation COMPLETE 5/16/2012 392 111A Griffin Complete AV system installation COMPLETE 5/16/2012 393 114 Griffin Lighting operational problems COMPLETE 5/16/2012 394 114 Griffin Incorrect device plates COMPLETE 5/16/2012 395 115 Griffin Incorrect device plates COMPLETE 5/16/2012 396 115 Griffin Lighting operational problems COMPLETE 5/16/2012 397 119 Dandis Wall paint touch-up COMPLETE 5/16/2012 398 119 Sterling Cabinet door touch-up COMPLETE 5/16/2012 399 119 Dandis Frame paint touch-up COMPLETE 5/16/2012 400 121 Griffin Outlet Empty COMPLETE 5/16/2012 401 121 Dandis Bench touch-up COMPLETE 5/16/2012 402 121 Armani Gap at outlet cover COMPLETE 5/16/2012 403 122 Conn Ceiling touch-up patch req. @ damper control 404 123 All Flooring Bump COMPLETE 5/16/2012 405 123 Dandis Wall touch-up COMPLETE 5/16/2012 406 125 PDC Fire caulking on floor COMPLETE 5/16/2012 407 125 B&B Staining on Floor COMPLETE 5/16/2012 408 125 Adams Drain clogged COMPLETE 5/16/2012 409 125 West Base touch-up COMPLETE 5/16/2012 410 126 Adams Drain Clogged COMPLETE 5/16/2012 411 127 Capital Threshold scratched 412 127 Adams Drain clogged COMPLETE 5/16/2012 413 129 Dandis Wall paint touch-up COMPLETE 5/16/2012 414 129 Griffin Outlet exposed 415 129 Griffin Camera missing 416 131 Griffin Outlet open (2) 417 131 Griffin Ceiling wire camera COMPLETE 5/16/2012 418 132 Capital Floor?COMPLETE (sealed)5/16/2012 419 132 Kleeberg Hole in ceiling missing grill 420 132 Griffin Outlet open COMPLETE 5/16/2012 421 132 Capital Floor base COMPLETE 5/16/2012 422 132 Griffin Incorrect device plates COMPLETE 5/16/2012 423 134 Dandis Ceiling touch-up touchup @ light 424 136 Chabot Holes in wall bottom of bench 425 137 Dandis HD touch-up paint remove prot. From head 426 138 Dandis Bench touch-up COMPLETE 5/16/2012 427 139 Dandis Ceiling touch-up at sprinkler 428 141 Adams No flush 429 141 Dandis HD touch-up paint COMPLETE 5/16/2012 430 141 Dandis Wall touch-up COMPLETE 5/16/2012 431 142 Dandis HD Touch-up touchup ceiling 432 142 Dandis Bench touch-up touchup Pg. 10 / 10 ARCHITECT PUNCHLIST, REV 1 AS OF 5/16/12 Barr & Barr Project No. 08264 5/10/12 NORTHAMPTON POLICE HEADQUARTERS New Police Facility and Parking Deck Northampton, Massachusetts Item #Room Trade Item Comments Completed 433 Cells Dandis Cell Numbering COMPLETE 5/16/2012 434 Cells G-S Cell door head COMPLETE 5/16/2012 435 1st Flr Dandis Touch-up typical COMPLETE 5/16/2012 436 1st Flr Adams Dirty drains COMPLETE 5/16/2012 437 203A Griffin Install correct device plates COMPLETE 5/16/2012 438 205A Griffin Provide correct device covers COMPLETE 5/16/2012 439 207 Griffin Correct lighting operation COMPLETE 5/16/2012 440 211 Griffin Remove temp construction lighting from above ceiling COMPLETE 5/16/2012 441 214 Griffin Provide correct device covers needs label 442 225 Adams Clean all debris from floor drain in mechanical room clean 443 225 B-G Label all equipment in 225 COMPLETE 5/16/2012 444 225 Griffin Label all equipment in 225 COMPLETE 5/16/2012 445 225 Adams Label all equipment in 225 COMPLETE 5/16/2012 446 227 Griffin Provide correct device covers label 447 231 Griffin Remove and replace lamp installed with incorrect color temp 448 232 Griffin Correct lighting operation griffin reviewing GENERAL NOTES 1 Signs Missing 2 Windows not caulked 3 Clean 4 Touch -up at radiator 5 Gap at top gun rail and wall - caulk 6 Interior window daulling not done 7 Provide as built plans per specifications. 8 Provide final commissioning reports. 9 Complete and commission all security systems & owner training 10 Complete and commission all voice and data systems