31B-282 NPD Construction Meeting #78 (01-17-2013)Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Weekly Construction Meeting 78 Date Start End Next Meeting Next Time Prepared By Company 1/17/2013 10:00 AM 12:00 PM 1/10/2013 10:00 AM Jason Boudreau Barr & Barr, Inc. Purpose Location General Notes Review Progress of Construction Northampton Police Dept. 29 Center Street Non-Attendees ARCADIS U.S., Inc. - Ray Kinghorn Barr & Barr - Gregg Sutherland Barr & Barr, Inc. - Jason Boudreau Barr & Barr, Inc. - Jared Moriarty Caolo & Bieniek Associates, Inc. - Curtis Edgin Northampton Building Department - Louie Hasbrouck Northampton Police Department - Russell Sienkiewicz Attended By ARCADIS U.S., Inc. - Ron Rickey Barr & Barr, Inc. - Bill Aquadro Barr & Barr, Inc. - Tim Senecal Caolo & Bieniek Associates, Inc. - Rudi Hall Caolo & Bieniek Associates, Inc. - Jim Hanifan City of Northampton - David Pomerantz City of Northampton - David Tripp Northampton Police Department - Joseph Koncas Compl'dDue DateStatusRespMeeting Item DescriptionItem General Business Old Business Sitework & Utilities 1/17/2013: Mt. View on site completing pavers. Rivet on site roofing canopies. Lizotte on site installing windows in the vestibule and doors at vestibule and stair tower. Total Wall is on site working on the canopies. Final deck joints being installed. The fire protection system is being hydrostatically tested. Arcadis to witness readings. Rails should finish 1/14 with painting in the spring. Final masonry at the temp stairs should be complete 1/14. 1/10/2013: Metal Panel systems being applied to the Garage Canopies. Building Canopies to follow. Masons are complete except for the short wall at the temp stair. Shanix is on site reviewing camera relocations and card reader/keypad issues. A meeting needs to take place to determine the operation of all the overhead doors and the parking gates. C&B to schedule ASAP. CBA; T&B Ongoing 12/12/2012001-003 MEP Coordination & Commissioning 1/17/2013: Boiler changes continue to be implemented. All parts are in except for the flow meter. The relays need to be changed for 1.5 minutes to 10 minutes delay. B&B Gregg Sutherland is on site to review system operation and report. 1/10/2013: Changes have been on-going with the water boilers. BG now has the parts from the boiler manufacturer and is scheduling with Automated Logic to change out the components and relocate the temp sensors on the roof. Automated should be in 1/11/13 or 1/14/13. B&B to forward contact information for Anne Adducci to CAB. B&B; CBA Ongoing 12/12/2012001-006 Prolog Manager Printed on: 1/23/2013 Page 1 Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Compl'dDue DateStatusRespMeeting Item DescriptionItem 1/3/2013: WSP issued a field report for the boiler revisions. CES issued directives to B&B for various modifications to the system. PD noted that the Impound Garage was very cold, and that other offices in the building were moderately cool. CES still waiting for information from National Grid regarding the power outages; CES to forward info to the PD so they can contact National Grid directly. 12/20/2012: CBA noted that CES is in contact with the boiler manufacturer for solutions to the cycling issue. Arcadis requested that WSP be copied on the correspondence. CES awaiting more information from National Grid regarding the power outages. 12/12/2012: Meeting is scheduled for Friday 8:30 AM to review the boiler status with all parties. CBA noted that CES spoke with National Grid and they are awaiting more information regarding the outages. The COR to perform the chiller power modifications is on hold until the issues are resolved with National Grid. Monthly Requisitions 1/10/2013: Requisition has been sent and is awaiting signature. 1/3/2013: December req to be sent out next week. 12/20/2012: November req sent out this week. 12/5/2012: November req to be issued next week. NPD; B&B Ongoing 12/12/2012001-007 FF&E Status 1/17/2013: Griffin to provide information for Blue Shield. B&B suggests that the owner purchase units without going through Griffin. Units cost approximately $28 each. 1/10/2013: Griffin is reviewing a blue shield. Parking signs were discussed. Pricing is in to City and CBA for review. Temporary parking signs for under the garage should be made for courthouse use. 1/3/2013: CBA/B&B to research blue shield information for front lights. B&B noted they are expecting to receive pricing this week for the parking deck signage; signs could be 4-6 week lead time. 12/20/2012: Replacement projection screens to be installed this week. B&B to issue PCO for vinyl acoustic panels today. PD noted that they may install blue bulbs in the front exterior lights for PD identification. 12/12/2012: Revised acoustical panel CO ongoing; B&B to advise. CBA noted the signage requirements in the parking area are being reviewed by Tighe & Bond. CBA Ongoing 12/12/2012012-001 Security Systems 1/17/2013: Team reviewed door conditions as discussed between owner and CBA; meeting is required. CBA to coordinate meeting for week of 1/21 to resolve the system required at each door. CBA to review PCO for additional signage. Signage has not been released. Temporary signage will be required. CBA to advise signage. 1/10/2013: CBA reviewed overhead door functions with the PD. Meeting is to be scheduled with all members involved to review. CBA to schedule meeting ASAP. 1/3/2013: CBA to review gate/overhead door functions with PD after B&B; NPD; CBA Ongoing 12/12/2012029-001 Prolog Manager Printed on: 1/23/2013 Page 2 Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Compl'dDue DateStatusRespMeeting Item DescriptionItem the meeting. The overhead door outside the Impound Garage may need an enclosure at the chain fall. PD requested Shanix on site to complete the 3 remaining cell camera replacements and Stentofone fix. Griffin issued pricing for Stair C cameras; CES to review and comment. Sound seals were installed at the interview rooms in the detective bureau but sound is still being picked up by the microphones. B&B to lower bottom seal to see if it helps. 12/20/2012: PD noted that they received the UPS and requested that Griffin proceed on the electrical work; CBA/CES to review and advise on PCO status. CBA to clarify functions at overhead doors and gates. B&B noted a meeting has been scheduled on January 4 with Griffin Electric to review the parking deck security dispute; CBA to confirm CES availability. 12/12/2012: It was discussed that the Shanix CO for additional booking storage did include integration with the access control system. CBA to review scope with CES and clarify the original scope requirements for the booking storage. PD noted the interior radio antennae work is complete and the signal is much improved. AVI reader issue still ongoing with Griffin; they are proceeding under protest, however no action has been seen since RFI's issued last week. Punch Lists 1/17/2013: Barr&Barr has corrected the latch and the frame adjustment on the cell doors. The interview room door closer has been adjusted and the door closes properly. Barr & Barr stated they received the punch list and cover letter from Arcadis and will respond appropriately. 1/10/2013: Barr & Barr stated they would cut the latch catch using their carpenter to expedite the issue. B&B will contact G-S to make sure there is no issue with cutting the flange area around the latch. If no issue, they will cut those when they widen the catches. B&B stated they will also adjust the closers on the interview room door and the one across the hall for proper closing and latching. B&B waiting on additional building issues list from City. 1/3/2013: G-S Co. installed the raised door pulls at the cell doors last week. B&B to confirm the locks were also addressed. PD noted that the strike openings on the jambs should be widened approximately 1/8" to allow for the door latches to operate freely. PD noted the jamb bumpers should also be replaced. B&B to follow up with G-S Co. Dave P. to forward other door hardware punchlist to B&B by Monday. B&B noted that Mountain View landscaping has advised to use sand only on brick pavers, not salt. B&B to check with Mountain View if non- salt deicers are acceptable. PD noted that B&B should notify Eric Suher of the requirements. 12/20/2012: B&B noted that G-S Co. is sending a rep to the jobsite to repair the lock that jammed again last week, as well as to install the raised pulls. 12/12/2012: PD noted that the county jail maintenance staff reviewed the cell doors and recommended having a grinder in the PD in case of an emergency. PD noted that the door sides should be repaired, and questioned if one of the doors should be undercut due to rubbing on the floor. B&B to review. Arcadis noted the expansion joints at the back stair need to be confirmed. B&B; CBA Ongoing 12/12/2012035-002 Prolog Manager Printed on: 1/23/2013 Page 3 Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Compl'dDue DateStatusRespMeeting Item DescriptionItem Cc:Company Name Contact Name Copies Notes Should you take exception to any of the minutes, please notify the author within three (3) business days of receipt. Otherwise the minutes shall be considered true and accurate and will be come part of the project record. Prolog Manager Printed on: 1/23/2013 Page 4