31B-282 NPD Construction Meeting #73 (12-12-2012)Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Weekly Construction Meeting 73 Date Start End Next Meeting Next Time Prepared By Company 12/12/2012 11:00 AM 12:30 PM 12/19/2012 11:00 AM Jason Boudreau Barr & Barr, Inc. Purpose Location General Notes Review Progress of Construction Northampton Police Dept. 29 Center Street Non-Attendees ARCADIS U.S., Inc. - Ray Kinghorn Barr & Barr - Gregg Sutherland Barr & Barr, Inc. - Jared Moriarty Barr & Barr, Inc. - Bill Aquadro Caolo & Bieniek Associates, Inc. - Curtis Edgin Northampton Building Department - Louie Hasbrouck Attended By ARCADIS U.S., Inc. - Ron Rickey Barr & Barr, Inc. - Jason Boudreau Barr & Barr, Inc. - Tim Senecal Caolo & Bieniek Associates, Inc. - Rudi Hall Caolo & Bieniek Associates, Inc. - Jim Hanifan City of Northampton - David Pomerantz City of Northampton - David Tripp Northampton Police Department - Russell Sienkiewicz Northampton Police Department - Joseph Koncas Compl'dDue DateStatusRespMeeting Item DescriptionItem General Business Old Business Sitework & Utilities 12/12/2012: Precast wall caps will be installed next week. Pavers at the Vestibule will be installed Saturday; balance of plaza pavers next week. Overhead door installation began today. Sprinkler/HVAC begins tomorrow. Doors/Hardware will be installed next week. 12/5/2012: Deck islands to be placed tomorrow. Brick at plenum walls ongoing. Exterior mounted lights being installed. Sprinkler piping to start next week. Entry Vestibule to be closed for access next Saturday to install the pavers. 11/28/2012: Concrete walls placed on upper deck. Brick installation ongoing at Stair C, CMU installation ongoing in lower level. Sidewalk placements ongoing, paver prep ongoing. Plumbing piping and rough electric ongoing in lower level; sprinkler installation to begin next week. Overhead doors to be delivered in 2-weeks. Dec 22 scheduled for grand opening event; B&B to review logistics with building department. Final work will be ongoing until early Jan. CBA; T&B Ongoing 12/12/2012001-003 MEP Coordination & Commissioning 12/12/2012: Meeting is scheduled for Friday 8:30 AM to review the boiler status with all parties. CBA noted that CES spoke with National Grid and they are awaiting more information regarding the outages. The COR to perform the chiller power modifications is on hold until the issues are resolved with National Grid. B&B; CBA Ongoing 12/12/2012001-006 Prolog Manager Printed on: 12/17/2012 Page 1 Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Compl'dDue DateStatusRespMeeting Item DescriptionItem 12/5/2012: Bypass valve was installed in the basement to resolve the boiler cycling. Team to observe for a week to see how the system operates. City requested the condensate lines be cleaned once the fix is confirmed. A pipe leak occurred Monday night in Evidence Storage; B&B to re-clean the floor and confirm flooring products were not compromised. Chiller Modifications PCO was revised. CES discussed possible causes of the electrical events and the intent of the proposed fix. It was discussed that National Grid should be contacted to see what their records indicate for the electrical events. CES to contact National Grid. 11/28/2012: CBA noted that CES is reviewing the boiler cycling and alarms; B&B to confirm if the boiler system was still running with the valve to the firing range RTU open, or if it was reverted back to the ACT system after the site meeting last week. Chiller Modifications PCO still under review. City to review with WSP. Monthly Requisitions 12/12/2012: Ongoing 12/5/2012: November req to be issued next week. 11/28/2012: November pencil req to be reviewed with CBA. NPD; B&B Ongoing 12/12/2012001-007 FF&E Status 12/12/2012: Revised acoustical panel CO ongoing; B&B to advise. CBA noted the signage requirements in the parking area are being reviewed by Tighe & Bond. 12/5/2012: CBA issued revised COR for the acoustic panels; B&B to review and reissue PCO. 11/28/2012: CBA reviewed acoustic panel samples with the PD; the Vinyl Hardside type was selected. B&B to confirm shipping price and PCO value. B&B noted solar powered flag pole light was ordered and will be installed on the flag pole. Bike rack locations to be confirmed. CBA Ongoing 12/12/2012012-001 Security Systems 12/12/2012: It was discussed that the Shanix CO for additional booking storage did include integration with the access control system. CBA to review scope with CES and clarify the original scope requirements for the booking storage. PD noted the interior radio antennae work is complete and the signal is much improved. AVI reader issue still ongoing with Griffin; they are proceeding under protest, however no action has been seen since RFI's issued last week. 12/5/2012: PCO was issued for the additional booking storage backup proposed by Shanix; CES to review. PD noted that they expected the proposal to include alternate solutions integrating the system with card access and manual switches. B&B to review with Shanix. 11/28/2012: Stair C cameras to be located by CBA/NPD; CES to confirm system requirements. PD noted they need a proposal for the booking storage backup immediately; B&B to contact Shanix/Griffin again today. Stentofone programming update is outstanding; Shanix to install next time on site. B&B noted that Griffin Electric is protesting that the Parking deck AVI readers and intercom system is not part of the Electrical scope. Directives and responses were issued to Griffin and work is being performed under protest by Griffin. B&B; NPD; CBA Ongoing 12/12/2012029-001 Prolog Manager Printed on: 12/17/2012 Page 2 Meeting Minutes Detailed Northampton Police Headquarters Barr & Barr, Inc.Project # 08264 29 Center Street Northampton, MA 01060 Tel: (413) 727-3487 Fax: (413) 727-3489 Compl'dDue DateStatusRespMeeting Item DescriptionItem Punch Lists 12/12/2012: PD noted that the county jail maintenance staff reviewed the cell doors and recommended having a grinder in the PD in case of an emergency. PD noted that the door sides should be repaired, and questioned if one of the doors should be undercut due to rubbing on the floor. B&B to review. Arcadis noted the expansion joints at the back stair need to be confirmed. 12/5/2012: B&B noted that they notified G-S Co. to address the bumper issue on site and at the same time install raised pulls on the cell doors. B&B awaiting to hear back from G-S Co. 11/28/2012: G-S Company issued memo regarding the cell doors/hardware. B&B to contact G-S to address the bumper situation on site, and suggest installation of raised pulls at the same time in order to reduce the installation cost significantly. B&B to advise. B&B; CBA Ongoing 12/12/2012035-002 Submittal Status 12/12/2012: Updated submittal log was issued for review. B&B noted the following are the highest priority submittals: - 034100-015 Precast Expansion Joints (11/9) 12/12/2012061-002 Cc:Company Name Contact Name Copies Notes Should you take exception to any of the minutes, please notify the author within three (3) business days of receipt. Otherwise the minutes shall be considered true and accurate and will be come part of the project record. Prolog Manager Printed on: 12/17/2012 Page 3