Loading...
38D-015 20CharlesStBuildingPermitDocuments_3.2.1620 Charles St Existing Floor Plan and Demo Plan - Basement ChimneyCrawlspace Bath Up Sink Chimney Scale: 1/4” = 1’0” Electric Panel Closet Closet Brick Foundation Support WDUtility WH Boiler Energy Notes: Finished portion of basement is heated. Glass block windows. Brick Column Brick Column Beam Supported on Chimney Beam Supported on Chimney Brick Column Sagging 8”x8” beam with sistered 2x4s 27.5” x 19” opening to crawl space at window height Energy Notes: Unnished portion of basement has single pane windows. Energy Notes: Rigid insulation is installed under oor Gas Meter 20 Charles St Renovation Plan - Basement ChimneyCrawlspace Bath Up Sink Chimney Scale: 1/4” = 1’0” Utility Up Insulated Access Panel to Crawlspace Gas Meter Electric Panel Hallway under stair landing 80” head height under this stair 3.5” lolly column on new footing36” insideBearing Wall Add additional foam board insulation beneath oor New 3.5” Lolly Column 39” inside All stairs have handrail and 36” or 39” clear at nish 20 Charles St Existing Floor Plan and Demo Plan - First Floor Closet Fridge Closet Bedroom Living Room FireplaceCabinetEnclosed Porch BathBarStove Dining DownUp Kitchen Sink DW Shower 4’10”x3’9” Concrete Landing StepStepChimney Scale: 1/4” = 1’0” Energy Notes: The original area of the home is uninsulated structural brick with no wall cavity and double pane vinyl replacement windows Energy Notes: The front porch is enclosed and heated, with single plane storm windows and storm door. It is stick-framed with berglass insulation. Visible air gaps where the ceiling plaster abuts original exterior wall.Existing Beam 20 Charles St Renovation Plan - First Floor Fridge Closet Master Bedroom Living Room Bath Stove Dining Kitchen DW Bath D 10’1” x 6’0” 10’1” x 11’1” 5’1” x 7’3” 6’ x 7’1” Up Scale: 1/4” = 1’0” Down Porch Energy Notes: Air seal and install energy ecient windows and exterior door Exposed Pipe, Painted Brushed Nickel Insulate where window removed (R13) Closet W Shelf9’8”x4’2” Cathedral Ceiling Bench StepEntry Addition Energy Notes: R13+5 walls, R30 oor, R38 roof, energy ecient window and door. Back Opening Header: Two 2x9s on two 4x4 Posts 1st Floor Insulation Notes: Home is structural brick (no wall cavities). Most existing exterior drywall not removed. Exterior brick will be exposed in bathroom and portion of back wall of house and air sealed with a clear brick sealant. Exposed Brick Exposed BrickExisting Window (sash opening is 23.5” x 24.5”) Existing split oor joists to be sistered 4x4 Post 42” Vanity Exposed I-Beam installed under existing wood beam 39” inside 40” insideBearing Wall Transfered to Basement 12” OverhangClosetExposed Steel I- BeamAll stairs have handrail and 39” or 40” clear at nish 20 Charles St Existing Floor Plan and Demo Plan - Second Floor Bedroom DownClosetBath Bedroom ChimneyCedar Closet Closet Storage Scale: 1/4” = 1’0” Energy Notes: Ceiling and wall cavities lled with berglass batts. Wood single paned windows, most with storms. Closet Closet Bearing Location Bearing Location 20 Charles St Renovation Plan - Second Floor Bedroom Bedroom BathDown Scale: 1/4” = 1’0” Energy Notes: Unvented roof. Fill existing rafters and walls with rigid foam board insulation (R5/inch: and low expansion spray foam at perimeter of each sheet. Fix broken storm windows and add storm windows where needed. All open cavities to be air sealed before insulating.SeatExisting Windows (sash openings are 30.5” x 25”) Existing Windows (sash openings are 30.5” x 25”) Unnished Area: Install blocking with batt insulation at eaves and ll rafters with rigid foam board insulation sealed with low expansion spray foam.4’ High WallEnd of Dormer Original Roof Cedar Closet Bench Shelves above stairs Closet 9’7” x 2’6” 20 Charles St First Floor Staircase 10" min tread (plus nosing) and 7 3/4" max riser thus we need 15 risers for over 108 1/2" oor to oor (7 1/4” risers) 1st Landing NTS 2nd Landing NTS 2’4” high 6’8” required headroom from nosing Scale: 1/4” = 1’0” 6’ high Basement Staircase 10" min tread (plus nosing) and 7 3/4" max riser thus we need 13 risers over 99" oor to oor (7 5/8” risers) 1st Landing NTS 2nd Landing NTS 1’6” high 6’8” required headroom from nosing 40” inside39” inside40” inside39” inside 20 Charles St Floor Framing at Staircases Scale: 1/4” = 1’0”BeamDouble 2x9 Headers/Trimmers Joist hangers at original beam above I-beam I-beam to be installed under orginal beam Double 2x9s Single 2x9 Above Wall Double 2x9s 2x9 at landing2x9 at landing2x9 at landing Joist hangersat trimmer 20 Charles St Section: Dormer Tie In, Framing Detail, and Load Paths Scale: 1/4” = 1’0” Existing 2x9 Joists @ 16” O.C. Existing 2x9 Joists @ 16” O.C. Existing Concrete Basement Floor New 4x4 ColumnNew 3.5” Lolly ColumnExisting Masonry Columns and One New 3.5” Lolly Column 6’8.5” Existing and New Head Height 7’2” Existing and 6’8.5” New Head Height at Peak Existing Dormer Original Roof New H2.5A Clips At Each Rafter Existing Ridge Board Existing 2x8 Rafters @ 16” O.C. New 2x6 Ceiling Joists @ 16” O.C. See additional detail in separate structural submission. Energy Notes: Unvented roof. Fill exposed exterior wall/ceiling cavities with rigid foam board insulation (R5/inch: R30 in original roof, R35 in dormer roof, R40 where new collar ties allow additional sheet). Apply low expansion spray foam at perimeter of each sheet. All open cavities to be air sealed before insulating. Exist i n g 2 x 6 R a f t e r s @ 1 6 ” O . C . Two Existing Columns (left in place after wall demo, to be removed after structural reinforcement) 20 Charles St Floor Back Entry Addition Scale: 1/4” = 1’0” 2x8 Floor Joists Double End Joists Floor Framing 2x6 Rim Joist Suboor: 3/4” PlywoodBottom Plate R13 Batt Insulation in Cavities 6x6 Pressure Treated Post, 12” Post Anchor 12” Sonotube, 4’ Deep Floor Plan Roof Framing 2x10 R a f t e r s , N o V e n t i n g , F i l l C a v i t i e s w i t h Foam B o a r d s ( R 4 5 ) a n d L o w E x p a n s i o n C l o s e d Cell S p r a y F o a m a t S h e e t P e r i m e t e r s Cathedral Ceiling Area 3/8” Lag Bolts 1/2” PlywoodStep9’8”x4’2” Cathedral Ceiling Bench StepAddition Energy Requirements: R13+5 or R20 walls, R30 oor, R38 roof, energy ecient window and door.ClosetConcreteLanding2x4 StudsWall, Roof and Foundation Section 7’6” Min. Ceiling Height1/2” Plywood Beneath Joists 2x6 header R35 Foam Board Insulation between Joists, Low Expansion Spray Foam at Sheet Perimeters Existing Brick Wall 3/8” Lag Bolts 3/8” Lag Bolts ConcreteLanding2x10 Rafters @ 24” O.C.R45 Foam Board Insulation between Rafters, Low Expansion Spray Foam at Sheet Perimeters R10 Continuous Insulation Cedar Shake Siding 5/8” Plywood Underlayment, Flashing & Shingles 20 Charles St - Site Plan Scale: 1” = 10’ 1 5 ’ E x i s t i n g S e t b a c k 20 Charles StOriginal Footprint E x i s t i n g P o r c h A d d i t i o n N e w B a c k E n t r y A d d i t i o n E x i s t i n g G a r a g e A d d i t i o n OriginalGarage Remove Existing Drive way and Establish Grass Existing Driveway C h a r l e s S t r e e t 12’ Existing Setback 4’ Exis. Setback4’ E x i s t i n g S e t b a c k0’ Existing SetbackScreening Fe nce 4’ FenceScreening FenceR e p l a c e G a r a g e D o o r w i t h E n t r y D o o r a n d W i n d ow 18’ Existing Setback 3 2 ’ S e t b a c k22’ Setback22’Setback