Loading...
29-548 JB-0101843-00 Reva_Calcs_ENP_MA_TBD-stampedVersion #53.6 - TBD RE: CERTIFICATION LETTER Project/Job # 0101843 Project Address: Rubin Residence 19 Indian Hl Lot 14 Florence, MA 01062 AHJ NorthamptonSC Office Springfield Design Criteria: - Applicable Codes = MA Res. Code, 8th Edition, ASCE 7-05, and 2005 NDS - Risk Category = II - Wind Speed = 90 mph, Exposure Category C - Ground Snow Load = 40 psf - MP1 & MP2: Roof DL = 10.5 psf, Roof LL/SL = 23.2 psf (Non-PV Areas), Roof LL/SL = 12.8 psf (PV Areas) - MP3: Roof DL = 10.5 psf, Roof LL/SL = 28 psf (Non-PV Areas), Roof LL/SL = 28 psf (PV Areas) - MP4: Roof DL = 9.5 psf, Roof LL/SL = 28 psf (Non-PV Areas), Roof LL/SL = 28 psf (PV Areas) - MP5: Roof DL = 10.5 psf, Roof LL/SL = 23.2 psf (Non-PV Areas), Roof LL/SL = 12.8 psf (PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category (SDC) = B < D To Whom It May Concern, February 1, 2016 A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from SolarCity. Structural evaluation was based on site observations and the design criteria listed above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer’s specifications and to meet and/or exceed all requirements set forth by the ASCE 7 standards for loading. Based on this evaluation I certify that the existing structure directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. The PV assembly hardware specifications are contained in the plans submitted for approval. Additionally a summary of the structural review is provided in the results summary tables on the following page. Version #53.6 - TBD X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 & MP2 64''24''39''NA Staggered 50.4% MP3 64''24''39''NA Staggered 44.7% MP4 72''24''39''NA Staggered 50.3% MP5 64''24''39''NA Staggered 50.4% X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 & MP2 64''20''65''NA Staggered 83.9% MP3 48''17''65''NA Staggered 55.7% MP4 48''17''65''NA Staggered 55.7% MP5 64''20''65''NA Staggered 83.9% Type Spacing Pitch MP1 & MP2 Stick Frame @ 16 in. O.C.43° MP3 Stick Frame @ 16 in. O.C.18° MP4 Pre-Fab Truss @ 24 in. O.C.18° MP5 Stick Frame @ 16 in. O.C.43° Member Evaluation Results Member Impact Check OK Member Analysis OK Member Analysis OK Member Impact Check OK HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Mounting Plane Framing Hardware - Portrait Modules' Standoff Specifications Hardware - Landscape Modules' Standoff Specifications Qualification ResultsStructure Landscape Hardware Portrait Hardware Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site. The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC. Overhang 1.66 ft Actual W 1.50'' Span 1 7.20 ft Actual D 7.25'' Number of Spans (w/o Overhang)1 Span 2 Nominal Yes Roofing Material Comp Roof Span 3 A 10.88 in.^2 Re-Roof No Span 4 Sx 13.14 in.^3 Plywood Sheathing Yes Span 5 Ix 47.63 in.^4 Board Sheathing None Total Rake Span 12.11 ft TL Defl'n Limit 120 Vaulted Ceiling No PV 1 Start 4.08 ft Wood Species SPF Ceiling Finish 1/2" Gypsum Board PV 1 End 10.75 ft Wood Grade #2 Rafter Slope 43°PV 2 Start Fb 875 psi Rafter Spacing 16'' O.C.PV 2 End Fv 135 psi Top Lat Bracing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emin 510000 psi Roof Pitch 11/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 10.5 psf x 1.37 14.4 psf 14.4 psf PV Dead Load PV-DL 3.0 psf x 1.37 4.1 psf Roof Live Load RLL 20.0 psf x 0.65 13.0 psf Live/Snow Load LL/SL1,2 40.0 psf x 0.58 ǀ x 0.32 23.2 psf 12.8 psf Total Load (Governing LC)TL 37.6 psf 31.3 psf Governing Load Comb CD CL (+)CL (-)CF Cr D + S 1.15 1.00 0.60 1.2 1.15 Governing Analysis Pre-PV Demand Post-PV Demand Net Impact Result Gravity Loading Check 271 psi 202 psi 0.74 Pass Member Analysis Results Summary Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is=1.0 Member Design Summary (per NDS) Roof System Properties Member Loading Summary STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP1 & MP2 Member Properties Summary MP1 & MP2 Horizontal Member Spans Rafter Properties Roofing Material PV System Type Spanning Vents Standoff (Attachment Hardware) Roof Slope Rafter Spacing Framing Type / Direction Purlin Spacing X-X Purlins Only Tile Reveal Tile Roofs Only Tile Attachment System Tile Roofs Only Standing Seam/Trap Spacing SM Seam Only Wind Design Code Wind Design Method Basic Wind Speed V Fig. 6-1 Exposure Category Section 6.5.6.3 Roof Style Fig. 6-11B/C/D-14A/B Mean Roof Height h Section 6.2 Wind Pressure Exposure Kz Table 6-3 Topographic Factor Kzt Section 6.5.7 Wind Directionality Factor Kd Table 6-4 Importance Factor I Table 6-1 Ext. Pressure Coefficient (Up)GCp (Up)Fig. 6-11B/C/D-14A/B Ext. Pressure Coefficient (Down)GCp (Down)Fig. 6-11B/C/D-14A/B Design Wind Pressure p Equation 6-22 Wind Pressure Up p(up)Wind Pressure Down p(down) Y-Direction Max Allowable Standoff Spacing Landscape 39''Max Allowable Cantilever Landscape NA Standoff Configuration Landscape Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR Y-Direction Max Allowable Standoff Spacing Portrait 65'' Max Allowable Cantilever Portrait NA Standoff Configuration Portrait Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR 29 sf3.0 psf -419 lbs500 lbs 83.9% 500 lbs 50.4% X-Direction 64''20''Staggered Staggered 17 sf3.0 psf-252 lbs 14.6 psf ALLOWABLE STANDOFF SPACINGS X-Direction 64'' 0.88 p = qh (GCp) -15.8 psf 24'' qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) (I)Equation 6-1516.7 psf Wind Pressure -0.95 Wind Pressure Calculation Coefficients 0.95 1.00 0.85 1.0 Velocity Pressure 25 ft Wind Design Criteria ASCE 7-05 Partially/Fully Enclosed Method 90 mph NA C Gable Roof NA NA 16'' O.C. Y-Y Rafters NA No Comp Mount Type C 43° CALCULATION OF DESIGN WIND LOADS - MP1 & MP2 Mounting Plane Information Comp Roof SolarCity SleekMount™ Overhang 1.66 ft Actual W 1.50'' Span 1 9.79 ft Actual D 7.25'' Number of Spans (w/o Overhang)1 Span 2 Nominal Yes Roofing Material Comp Roof Span 3 A 10.88 in.^2 Re-Roof No Span 4 Sx 13.14 in.^3 Plywood Sheathing Yes Span 5 Ix 47.63 in.^4 Board Sheathing None Total Rake Span 12.04 ft TL Defl'n Limit 120 Vaulted Ceiling No PV 1 Start 2.25 ft Wood Species SPF Ceiling Finish 1/2" Gypsum Board PV 1 End 9.00 ft Wood Grade #2 Rafter Slope 18°PV 2 Start Fb 875 psi Rafter Spacing 16'' O.C.PV 2 End Fv 135 psi Top Lat Bracing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emin 510000 psi Roof Pitch 4/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 10.5 psf x 1.05 11.0 psf 11.0 psf PV Dead Load PV-DL 3.0 psf x 1.05 3.2 psf Roof Live Load RLL 20.0 psf x 1.00 20.0 psf Live/Snow Load LL/SL1,2 40.0 psf x 0.7 ǀ x 0.7 28.0 psf 28.0 psf Total Load (Governing LC)TL 39.0 psf 42.2 psf Governing Load Comb CD CL (+)CL (-)CF Cr D + S 1.15 1.00 0.58 1.2 1.15 Governing Analysis Max Demand @ Location Capacity DCR Result Bending (+) Stress 573 psi 6.7 ft 1389 psi 0.41 Pass Member Analysis Results Summary Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is=1.0 Member Design Summary (per NDS) Roof System Properties Member Loading Summary STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP3 Member Properties Summary MP3 Horizontal Member Spans Rafter Properties Roofing Material PV System Type Spanning Vents Standoff (Attachment Hardware) Roof Slope Rafter Spacing Framing Type / Direction Purlin Spacing X-X Purlins Only Tile Reveal Tile Roofs Only Tile Attachment System Tile Roofs Only Standing Seam/Trap Spacing SM Seam Only Wind Design Code Wind Design Method Basic Wind Speed V Fig. 6-1 Exposure Category Section 6.5.6.3 Roof Style Fig. 6-11B/C/D-14A/B Mean Roof Height h Section 6.2 Wind Pressure Exposure Kz Table 6-3 Topographic Factor Kzt Section 6.5.7 Wind Directionality Factor Kd Table 6-4 Importance Factor I Table 6-1 Ext. Pressure Coefficient (Up)GCp (Up)Fig. 6-11B/C/D-14A/B Ext. Pressure Coefficient (Down)GCp (Down)Fig. 6-11B/C/D-14A/B Design Wind Pressure p Equation 6-22 Wind Pressure Up p(up)Wind Pressure Down p(down) Y-Direction Max Allowable Standoff Spacing Landscape 39''Max Allowable Cantilever Landscape NA Standoff Configuration Landscape Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR Y-Direction Max Allowable Standoff Spacing Portrait 65'' Max Allowable Cantilever Portrait NA Standoff Configuration Portrait Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR 22 sf3.0 psf -279 lbs500 lbs 55.7% 500 lbs 44.7% X-Direction 48''17''Staggered Staggered 17 sf3.0 psf-223 lbs 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction 64'' 0.45 p = qh (GCp) -14.6 psf 24'' qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) (I)Equation 6-1516.7 psf Wind Pressure -0.88 Wind Pressure Calculation Coefficients 0.95 1.00 0.85 1.0 Velocity Pressure 25 ft Wind Design Criteria ASCE 7-05 Partially/Fully Enclosed Method 90 mph NA C Gable Roof NA NA 16'' O.C. Y-Y Rafters NA No Comp Mount Type C 18° CALCULATION OF DESIGN WIND LOADS - MP3 Mounting Plane Information Comp Roof SolarCity SleekMount™ Overhang 1.66 ft Actual W 1.50'' Span 1 7.17 ft Actual D 5.50'' Number of Spans (w/o Overhang)2 Span 2 6.67 ft Nominal Yes Roofing Material Comp Roof Span 3 A 8.25 in.^2 Re-Roof No Span 4 Sx 7.56 in.^3 Plywood Sheathing Yes Span 5 Ix 20.80 in.^4 Board Sheathing None Total Rake Span 16.30 ft TL Defl'n Limit 120 Vaulted Ceiling No PV 1 Start 0.83 ft Wood Species SPF Ceiling Finish 1/2" Gypsum Board PV 1 End 14.08 ft Wood Grade #2 Rafter Slope 18°PV 2 Start Fb 875 psi Rafter Spacing 24'' O.C.PV 2 End Fv 135 psi Top Lat Bracing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emin 510000 psi Roof Pitch 4/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 9.5 psf x 1.05 10.0 psf 10.0 psf PV Dead Load PV-DL 3.0 psf x 1.05 3.2 psf Roof Live Load RLL 20.0 psf x 1.00 20.0 psf Live/Snow Load LL/SL1,2 40.0 psf x 0.7 ǀ x 0.7 28.0 psf 28.0 psf Total Load (Governing LC)TL 38.0 psf 41.1 psf Governing Load Comb CD CL (+)CL (-)CF Cr D + S 1.15 1.00 0.83 1.3 1.15 Governing Analysis Max Demand @ Location Capacity DCR Result Bending (-) Stress -737 psi 8.8 ft -1256 psi 0.59 Pass Member Analysis Results Summary Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is=1.0 Member Design Summary (per NDS) Roof System Properties Member Loading Summary STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP4 Member Properties Summary MP4 Horizontal Member Spans Rafter Properties Roofing Material PV System Type Spanning Vents Standoff (Attachment Hardware) Roof Slope Rafter Spacing Framing Type / Direction Purlin Spacing X-X Purlins Only Tile Reveal Tile Roofs Only Tile Attachment System Tile Roofs Only Standing Seam/Trap Spacing SM Seam Only Wind Design Code Wind Design Method Basic Wind Speed V Fig. 6-1 Exposure Category Section 6.5.6.3 Roof Style Fig. 6-11B/C/D-14A/B Mean Roof Height h Section 6.2 Wind Pressure Exposure Kz Table 6-3 Topographic Factor Kzt Section 6.5.7 Wind Directionality Factor Kd Table 6-4 Importance Factor I Table 6-1 Ext. Pressure Coefficient (Up)GCp (Up)Fig. 6-11B/C/D-14A/B Ext. Pressure Coefficient (Down)GCp (Down)Fig. 6-11B/C/D-14A/B Design Wind Pressure p Equation 6-22 Wind Pressure Up p(up)Wind Pressure Down p(down) Y-Direction Max Allowable Standoff Spacing Landscape 39''Max Allowable Cantilever Landscape NA Standoff Configuration Landscape Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR Y-Direction Max Allowable Standoff Spacing Portrait 65'' Max Allowable Cantilever Portrait NA Standoff Configuration Portrait Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR 22 sf3.0 psf -279 lbs500 lbs 55.7% 500 lbs 50.3% X-Direction 48''17''Staggered Staggered 20 sf3.0 psf-251 lbs 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction 72'' 0.45 p = qh (GCp) -14.6 psf 24'' qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) (I)Equation 6-1516.7 psf Wind Pressure -0.88 Wind Pressure Calculation Coefficients 0.95 1.00 0.85 1.0 Velocity Pressure 25 ft Wind Design Criteria ASCE 7-05 Partially/Fully Enclosed Method 90 mph NA C Gable Roof NA NA 24'' O.C. Y-Y Rafters NA No Comp Mount Type C 18° CALCULATION OF DESIGN WIND LOADS - MP4 Mounting Plane Information Comp Roof SolarCity SleekMount™ Overhang 1.66 ft Actual W 1.50'' Span 1 5.63 ft Actual D 7.25'' Number of Spans (w/o Overhang)1 Span 2 Nominal Yes Roofing Material Comp Roof Span 3 A 10.88 in.^2 Re-Roof No Span 4 Sx 13.14 in.^3 Plywood Sheathing Yes Span 5 Ix 47.63 in.^4 Board Sheathing None Total Rake Span 9.97 ft TL Defl'n Limit 120 Vaulted Ceiling No PV 1 Start 2.17 ft Wood Species SPF Ceiling Finish 1/2" Gypsum Board PV 1 End 8.83 ft Wood Grade #2 Rafter Slope 43°PV 2 Start Fb 875 psi Rafter Spacing 16'' O.C.PV 2 End Fv 135 psi Top Lat Bracing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emin 510000 psi Roof Pitch 11/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 10.5 psf x 1.37 14.4 psf 14.4 psf PV Dead Load PV-DL 3.0 psf x 1.37 4.1 psf Roof Live Load RLL 20.0 psf x 0.65 13.0 psf Live/Snow Load LL/SL1,2 40.0 psf x 0.58 ǀ x 0.32 23.2 psf 12.8 psf Total Load (Governing LC)TL 37.6 psf 31.3 psf Governing Load Comb CD CL (+)CL (-)CF Cr D + S 1.15 1.00 0.73 1.2 1.15 Governing Analysis Pre-PV Demand Post-PV Demand Net Impact Result Gravity Loading Check 156 psi -118 psi 0.76 Pass Member Analysis Results Summary Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is=1.0 Member Design Summary (per NDS) Roof System Properties Member Loading Summary STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP5 Member Properties Summary MP5 Horizontal Member Spans Rafter Properties Roofing Material PV System Type Spanning Vents Standoff (Attachment Hardware) Roof Slope Rafter Spacing Framing Type / Direction Purlin Spacing X-X Purlins Only Tile Reveal Tile Roofs Only Tile Attachment System Tile Roofs Only Standing Seam/Trap Spacing SM Seam Only Wind Design Code Wind Design Method Basic Wind Speed V Fig. 6-1 Exposure Category Section 6.5.6.3 Roof Style Fig. 6-11B/C/D-14A/B Mean Roof Height h Section 6.2 Wind Pressure Exposure Kz Table 6-3 Topographic Factor Kzt Section 6.5.7 Wind Directionality Factor Kd Table 6-4 Importance Factor I Table 6-1 Ext. Pressure Coefficient (Up)GCp (Up)Fig. 6-11B/C/D-14A/B Ext. Pressure Coefficient (Down)GCp (Down)Fig. 6-11B/C/D-14A/B Design Wind Pressure p Equation 6-22 Wind Pressure Up p(up)Wind Pressure Down p(down) Y-Direction Max Allowable Standoff Spacing Landscape 39''Max Allowable Cantilever Landscape NA Standoff Configuration Landscape Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR Y-Direction Max Allowable Standoff Spacing Portrait 65'' Max Allowable Cantilever Portrait NA Standoff Configuration Portrait Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR 29 sf3.0 psf -419 lbs500 lbs 83.9% 500 lbs 50.4% X-Direction 64''20''Staggered Staggered 17 sf3.0 psf-252 lbs 14.6 psf ALLOWABLE STANDOFF SPACINGS X-Direction 64'' 0.88 p = qh (GCp) -15.8 psf 24'' qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) (I)Equation 6-1516.7 psf Wind Pressure -0.95 Wind Pressure Calculation Coefficients 0.95 1.00 0.85 1.0 Velocity Pressure 25 ft Wind Design Criteria ASCE 7-05 Partially/Fully Enclosed Method 90 mph NA C Gable Roof NA NA 16'' O.C. Y-Y Rafters NA No Comp Mount Type C 43° CALCULATION OF DESIGN WIND LOADS - MP5 Mounting Plane Information Comp Roof SolarCity SleekMount™