Loading...
39A-067 MTS-8In.-Rev3.3pub 8” Series Top of Pole Mount Installation Manual 2016 V3.3 www.mtsolar.us 844-MT-SOLAR (687-6527) 2 8” Series TPM Components— Exploded View Components List: Tools Required: 1 1/8” Socket 3/4” Socket 9/16” Socket Crescent Wrench Torque Wrench Tape Measure Angle Finder Compass Ladder Qty Description 2 Center I-Beams, 90 Inches Long 4 Wing I-Beams, Lengths Vary 2 3x5 Tubes, 90 Inches Long 1 4.5" Pipe 1 2" Pipe 1 U Bracket / Pole Cap 1 Adjuster 1 Adjuster Handle (only available with screw adjuster) 1 Back Plate ** Beam Clamps 2 Locking Collars (located in Bolt Kit) 1 Lifting Insert Cap (located in Bolt Kit) 1 Lifting Insert 1 Bolt Kit 8” Series Installers Package (Optional) 1 Chain Fall Hoist 1 Lifting Bracket ** Varies depending on the number, size and layout of modules. See packing list for Quantity. 3 Thank you for choosing MT Solar Pole Mounts. It is the installer’s responsibility to determine the foundation parameters based on local site conditions, such as wind speed, snow load, soil type, exposure category, etc. Installations also must comply with local building regulations and permitting requirements. We recommend consulting a licensed engineer to determine appropriate foundation dimensions and pipe size and thickness. MT Solar can also provide a stamped drawing engineered for site-specific requirements for an additional fee. Please contact us to find out more. Tips for Conventional Pipe Installation:  Dig hole according to recommended depth and diameter.  Set pipe in hole and use a level to ensure it is plumb and vertical to the ground.  If installing multiple poles, use a string to line up pipes.  Brace pipe to prevent it from moving while pouring concrete.  Proper compaction of backfill around sonotube or form is recommended, unless pouring so that con- crete is in direct contact with the soil.  Allow concrete to cure for recommended length of time. 4 103 104 A Installation Guide 102 101 101: With the 8" Sch 40 or Sch 80 steel pipe installed in the ground, place the lifting insert into the top of the pipe until it sits flush. 102: Place the lifting bracket into the lifting insert with the eye facing south. 103: Hang a 1 ton or greater chain fall hoist from the lifting eye. 104: Hang the U-Bracket Assembly on the Chain Hoist. 105 106 105: While holding the U-Bracket around the pole, insert 2 of the 3/4" x 11” bolts through the holes in the back of the U-bracket and through the holes on the Back Plate with 3/4” flat washers on both sides and 3/4” nuts, but do not tighten. 106: Insert three 3/4” x 3” Set Bolts in Back Plate, but do not tighten if leaving chain fall hoist connected. Note: If installing multiple mounts with a single hoist, bolt the pole cap on the pole at the desired working height. Tighten 3/4” bolts and 3/4” set screws to 200 ft-lb. Assemble rack, rails and modules. Then, move lifting assembly and hoist to pole when ready to lift. Attach to pole cap and loosen bolts. Continue with raising the array for wiring or completing the installation. 104 B 5 107 108 107: Attach the Screw Adjuster to the tab on the Back Plate with the 1/2” x 1 1/2” Bolt, two 1/2” flat washers and 1/2” Nylock Nut. Make sure the bolt is snug tight, but do not over-tighten to allow for some movement of the adjuster tab. 108: Slide the 2” pipe through the screw adjuster and slide the 4.5" pipe through the U Bracket Assembly sleeve. 109 110 A 109: Center pipes in sleeves. There should be approximately 16” of the 4.5” pipe on either side of the sleeve. 110: Slide collars on 4.5” pipe and tighten 1/2” x 1” square head set bolts to 45 ft lbs. Hold collar firm against the sleeve when tightening. The nut should be facing out, away from the sleeve. 16” 16” 110B 6 112 111 B 113 C 113 B 111 A 111: Ensure that the MT Solar lettering is upright, and attach one of the 3x5 rectangular tubes to the 4.5” pipe using the 3/4” x 5” bolts, large 5” square plates and 3/4” split washers. Attach to the 2” pipe using the 1/2” x 4 1/2” bolts with 1/2” flat washers and split washers. 112: Install the remaining 5"x3" rectangular tube. Snug up all 4 bolts, but leave loose enough to allow for some play when installing I-beams. Adjusting the Screw Adjuster as necessary, level the array in prepara- tion for I-Beam installation. 113 A 114 A 114 B 114 B 113: Install center I-beams to the 3x5 tubes using the 3/4" x 2” bolts, 3/4” flat washers & 3/4” split washers. DO NOT TIGHTEN at this step. Install all I-beams with notches up. 114: Splice the two I-beam wings on the ends of the center beam using the 1/2” x 1 1/4” bolts and 1/2” flange nuts. The Alignment Set Screws may be used to align the I-Beam Center piece to the I-Beam Wings, if necessary. Once I-beams are level, make sure all alignment set screws are touching the plate of the I-Beam wing and tighten the 1/2” bolts to 45 ft lbs. 7 115 A 115 B 116 C 115: Standing on the North Side of the array with the Tube to Beam bolts started but not tightened, sight the beams to ensure they are parallel. If not, twist the array until they are. . 116 A 116 B 116: Plan the layout of your rails according to your module manufacturer’s recommendation. Install the Beam Clamps on the I-beam using the 3/8” x 1 1/4” carriage bolts and 3/8” flange nuts. Tighten to 20 ft lbs. The TOP-15 uses a long angle-shaped clamp to give extra support to the span and cantilever. Attach angle using the plates provided and the 3/8” x 1 1/4” carriage bolts and 3/8” flange nuts. For the 8-TOP-8, remember to leave a 9-10” gap in the center to allow for the 8 5/8” (OD) pipe to protrude through, if you wish to put all the modules on at ground level. *For standard array configurations using 60 cell modules (approximately 40” x 65”), see pg 11. TOP-15 Beam Clamps Then tighten all the 3/4” bolts between the Pipe and Rectangular Tubes and the Tubes and the I-Beams to 100 ft lbs. 8 119: Install Solar Modules as per Mounting Rail and module manufacturer instructions using top clamps. See last page of manual for Iron Ridge Rail and Clamp instructions. 118 117: Install the Mounting Rail into the beam clamps slot as per Mounting Rail instructions. Use 3/8” x 1” stainless steel bolts and 3/8” serrated flange nuts. 118: Center rails over I-beams, keeping equal length of rail off the end of each beam. Tighten to 17 ft lbs. TOP-15 Rail Connection 117 119 A 119 B 9 120 121 122A 123 122: With the mount hanging free on the hoist, FIRST tighten the square-headed set bolts in the back mounting plate to a minimum of 200 ft-lb. Remove the gap by tightening the set bolts until the front of the U-Bracket is snug against pipe, then make one more full rotation of the bolt. SECOND, tighten both 11” bolts in back mounting plate to 100 ft-lb. Insert the last 3/4" x 11” bolt over the top of the pole with the 3/4” flat washers and 3/4” nut. Tighten to 20 ft lbs. 123: Remove the chain hoist and lifting bracket and place the 2” square cap in place. 120: Leave out the appropriate module(s) to allow for the 8” pipe. It is ok to install the top and bottom modules of the center row(s) with just 2 clamps until the array is lifted to the top. Raise and or tilt the array to facilitate module installation and/or module wiring and wire management as needed. 121: When wiring is completed, raise the array to the top of the pole. 122B NO GAP!! Remove the gap by tightening the square set bolts until the front of the U-Bracket is snug against pipe, then make one more full rotation of the bolt. 10 124 125: Attach adjuster handle using the set screw. You may cut the handle to length depending on pole height and site condi- tions. We recommend occasional greasing of the threaded rod. Using an angle finder, adjust array to proper tilt. 124: Place the final module in the empty space. It may be advan- tageous to fully extend the Screw Adjuster to make this easier. If necessary, the lifting bracket can be removed and the array tilted to 90 degrees. In this position the lifting bracket and chain hoist can be re-installed and once the bolts are loosened the array can be lowered down to install the final module. 125 GROUNDING LUG Assemble Grounding Lug with provided hardware. Torque hex nut to 73 In-lbs. Install a minimum 1 O AWG solid copper grounding wire. Torque set screw to 20 in-lbs . ... Oirounclng hardware Is only needed on one rall per row al' modul•. Grounding L.ua• must be �stalled on •ma rall 1111 Grounclng Straps. A. FIRST END CLAMPS Place first module a minimum of 1.5" from rail ends. Slide End Clamps into both rails and hook over top of module. Torque 10 55 in-lbs. � Ensure ralls ant square befora placlng modulaa. 9 Hold Encl Ciampa whila 'lorquing to pr9Y911t rotation. B. MID CLAMPS Place second module into position, leaving a 1/2" gap between it and the previous module. While holding module in place, drop Grounding Mid Clamps into rail slots and rotate nu1s to engage T-bolts. Slide second module flush against clamp tabs. Once clamp teeth are in contact with both module frames and the bolts are properly aligned in slots, torque to 73 In-lbs. Repeat procedure for each following module. "" Make aura Indent at top al' T·bolt 18 parpencllcular to rall Blot to enaan T-bollll are property 8881:8d. "" If using Standard Mid Clamps with ETl.-listed WEEB Clips, nrfer to WEEB lnlllllHatton lnstrucllona. Torque to 120 l�lba. 1, Dnlp In Ciampa Patalal ID Ral Torque IO 73 in�hll t--=-1\.. T-8ott Indent Pelp4nllcular to Rall IZZZZI/ C. LAST END CLAMPS Place last module in position on rails, a minimum of 1.5° from rail ends. Slide End Clamps into both rails, ensuring it is hooked over top of module. Torque to 55 In-lbs. "" Repeat all steps for each followlng row of modulee. 0 2015 IRONRIDGE, INC. VERSION 2.25 ROOF MOUNT INSTAllATION MANUAL -4 Complete IronRidge Manual available at www.ironridge.com. 55 12 Module Configuration 9 Module Configuration 15 Module Configuration 10 Module Configuration 8 Module Configuration 16 Module Configuration 10-TALL Configuration 20 Module Configuration