Loading...
30B-126 8hinkleyzoning_ A4 EXTERIOR ELEVATIONS.pdfC:\Users\Faja\Documents\+ PROJECT FOLDER\+ Jason and Morissa Fregeau\A4 EXTERIOR ELEVATIONS.pdf 1ST FLOOR 0" 2ND FLOOR 11' - 1 1/4" T/PLATE 19' - 2 3/8" 4 12 ASPHALT SHINGLES TYPICAL PORCH ROOF FRONT / EAST ELEVATION HORIZONTAL SIDING TYPICAL 8 HINCKLEY ST NORTHAMPTON, MA 11-27-2017 TOTAL FACADE AREA SF = 712 SF 30% OF 712 SF = 213 SF MAX. GARAGE FACADE = 205 SF <213 SF OK BUILDING HEIGHT 30' - 0 1/4" DESIGN DEVELOPMENT NOT FOR CONSTRUCTION STEPHEN Associates, LLC 4 Grand View Drive Enfield, CT 06082 860-803-1265 SJSL@AOL.COM JAGER DRAWING ISSUE DATE: REVISION DATE: PROJ NO: PROJECT NAME: PROJECT ADDRESS: All products, fixtures, and equipment shall be installed in accordance with manufacturers' installation instructions and all applicable codes. All dimensions, materials, and specifications are to be verified by the Contractor prior to the commencement of work. The Contractor is responsible for construction means, methods, techniques, sequences, and safety precautions in connection with the work. Consulting Architects 11/27/2017 11:29:06 AM NEW RESIDENCE 8 HINCKLEY ST NORTHAMPTON, MA A4 EXTERIOR ELEVATIONS 11/5/2017 2017.22 1/4" = 1'-0" EAST ELEVATION 1 C1 SITE PLAN.pdfC:\Users\Faja\Documents\+ PROJECT FOLDER\+ Jason and Morissa Fregeau\C1 SITE PLAN.pdf 20 FT SETBACK 1 0 F T S E T B A C K 20' - 2 1/2" 34' - 10" 49' - 0" 51' - 0" ROOF DECK 15 FT SETBACK 1 5 F T S E T B A C K DRIVEWAY SIDE WALK 1 0 F T S E T B A C K 1 9 6 . 5 5 S 4 0 6 0 4 E 171.18 N 81 29 49 W 60.01 N 78 17 55 E 7 3 . 6 N 8 1 2 9 4 9 W PROPOSED HOUSE HATCHWAY DESIGN DEVELOPMENT NOT FOR CONSTRUCTION STEPHEN Associates, LLC 4 Grand View Drive Enfield, CT 06082 860-803-1265 SJSL@AOL.COM JAGER DRAWING ISSUE DATE: REVISION DATE: PROJ NO: PROJECT NAME: PROJECT ADDRESS: All products, fixtures, and equipment shall be installed in accordance with manufacturers' installation instructions and all applicable codes. All dimensions, materials, and specifications are to be verified by the Contractor prior to the commencement of work. The Contractor is responsible for construction means, methods, techniques, sequences, and safety precautions in connection with the work. Consulting Architects 11/27/2017 11:29:51 AM NEW RESIDENCE 8 HINCKLEY ST NORTHAMPTON, MA C1 SITE PLAN 11/5/2017 2017.22 1" = 10'-0" SITE PLAN 1 NORTH