Loading...
31B-296 memo 3 Tyler Court 11-03-2013 Sackrey Construction November 03, 2013 83 South Main Street Sunderland, MA 01375 Subject Location: 3 Tyler Court Map Block: 31B-296 Mr. Sackrey, All work must meet all applicable codes whether noted or not included within this memo. Please follow up with additional information on the following items: Braced wall detailing at the garage door and as part of the Reading Room engineering. Stamped engineering for all non prescriptive materials and or systems. Stamped engineering on the two story Reading Room. Floor joist layout would be helpful to verify loading. Beam below the north dormer appear undersized. Beams cannot bear on veneer brick. Note August 16th 2013 begins the newest energy code 2012 IECC with MA amendments with a concurrency period until July 1, 2014 and an expectation that a new Stretch Code will be forth coming. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cyberregs.com/icod/ one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC, AA115, MA amendments.