Loading...
31C-045 LotsA22A27SubmissionSet (1)SITE PROJ. No.: DATE: 20110084.A40 9/19/2013 ENGINEER SHEET INDEX SHEET No.SHEET TITLE C0.00 COVER SHEET C0.01 KEY MAP 1 of 1 LOT DIVISION PLAN C1.00 EXISTING CONDITIONS C1.10 EROSION & SEDIMENTATION CONTROL PLAN C1.20 PROPOSED SITE LAYOUT PLAN C1.30 PROPOSED GRADING AND DRAINAGE PLAN C1.40 PROPOSED UTILITY PLAN C3.00 EROSION & SEDIMENTATION CONTROL PLAN C3.01 CONSTRUCTION DETAILS C3.02 CONSTRUCTION DETAILS L1.00 SITE PLANTING PLAN L2.00 TYPICAL PLANTINGS PLAN AND DETAILS LOCATION MAP SCALE: 1" = 2000' VILLAGE HILL - LOTS A22 & A27 SITE PLAN APPROVAL MUSANTE DRIVE AND MOSER STREET SEPTEMBER 19, 2013 78 INTERSTATE DRIVE WEST SPRINGFIELD, MA 01089 413.452.0445 www.fando.com DEVELOPER PECOY GROUP 215 BALDWIN STREET WEST SPRINGFIELD, MA 01089 SURVEYOR SHERMAN& FRYDRYK 3 CONVERSE STREET, STE. 203 PALMER, MA 01069 PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:C:\Temp\AcPublish_3628\20110084A40_STP01.dwg,Layout:C0.01,Plotted:Fri,Sep20,2013-2:01PMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPKEYSHEET LOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=30' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:C:\Temp\AcPublish_6076\20110084A40_STP01.dwg,Layout:C1.00,Plotted:Thu,Oct10,2013-8:40AMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPEXISTINGCONDITIONS LOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:C:\Temp\AcPublish_3104\20110084A40_STP01.dwg,Layout:C1.10,Plotted:Wed,Oct09,2013-8:19AMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPEROSION&SEDIMENTATIONCONTROLPLANLOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:C:\Temp\AcPublish_3104\20110084A40_STP01.dwg,Layout:C1.20,Plotted:Wed,Oct09,2013-8:31AMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPPROPOSEDSITELAYOUTPLAN LOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:J:\DWG\P2011\0084\A40\Civil\Plan\20110084A40_STP01.dwg,Layout:C1.30,Plotted:Fri,Oct04,2013-11:03AMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPPROPOSEDGRADING&DRAINAGEPLANLOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:FilePath:J:\DWG\P2011\0084\A40\Civil\Plan\20110084A40_STP01.dwg,Layout:C1.40,Plotted:Wed,Oct09,2013-8:34AMUser:jspavinsMSVIEW:LAYERSTATE:Plotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPPROPOSEDUTILITYPLAN LOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:MSVIEW:LAYERSTATE:FilePath:J:\DWG\P2011\0084\A40\Civil\Details\20110084A40_DET01.dwgLayout:C3.00Plotted:Fri,September20,2013-4:58PMUser:jspavinsPlotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPEROSION&SEDIMENTATIONCONTROLDETAILSLOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTSN.T.S. N.T.S. 1 - 2 INCH DIA. WASHED, CRUSHED STONE CULTEC RECHARGER 330XL HD HEAVY DUTY CHAMBER PAVEMENT 4 OZ. NON-WOVEN FILTER FABRIC AROUND STONE 95% COMPACTED FILL CULTEC NO. 20L POLYETHYLENELINER TO SPAN THE ENTIRE WIDTH OF THE SYSTEM BELOW THE HVLV FC-24 FEED CONNECTORS AND SIDE PORTALS SIDE PORTAL TO BE CUTIN FIELD TO ALLOW HVLV FC-24 FEED CONNECTOR AS NEEDED 12" HDPE 95% COMPACTED FILL FINISHED GRADE RECHARGER 330 XL HDHEAVY DUTY CHAMBER 4 OZ. NON-WOVEN FILTER FABRIC AROUND STONE. TOP AND SIDES MANDATORY. CULTEC NO. 20L POLYETHYLENE LINER TO BE PLACED BENEATH HVLV FC-24 FEED CONNECTORSWHEN UTILIZING INTERNAL MANIFOLD 1-2 INCH DIA WASHED CRUSHED STONE PROJ. No.: DATE: 20110084.A40 09/19/2013 PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:MSVIEW:LAYERSTATE:FilePath:J:\DWG\P2011\0084\A40\Civil\Details\20110084A40_DET01.dwgLayout:C3.02Plotted:Fri,September20,2013-4:58PMUser:jspavinsPlotter:DWGTOPDF.PC3CTBFile:FO2008MONO.CTB20110084.A40 09/19/2013PECOYGROUPCONSTRUCTIONDETAILS LOTSA22ANDA27,HOSPITALHILLNORTHAMPTONMASSACHUSETTSN.T.S. PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:MSVIEW:LAYERSTATE:FilePath:J:\DWG\P2011\0084\A40\Civil\Plan\20110084A40_LND01.dwgLayout:LPL1.00Plotted:Wed,October09,2013-8:28AMUser:jspavinsPlotter:DWGTOPDF.PC3CTBFile:FO.STB20110084.A40 09/19/2013PECOYGROUPSITEPLANTINGPLAN LOTSA22ANDA27-HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20' PROJ. No.: DATE:DATENo.DESCRIPTIONDESIGNERREVIEWERSCALE:DATUM:VERT.:HORZ.:VERT.:HORZ.:MSVIEW:LAYERSTATE:FilePath:J:\DWG\P2011\0084\A40\Civil\Plan\20110084A40_LND01.dwgLayout:L2.00Plotted:Fri,September20,2013-4:49PMUser:jspavinsPlotter:DWGTOPDF.PC3CTBFile:FO.STB20110084.A40 09/19/2013PECOYGROUPTYPICALPLANTINGPLANANDDETAILS LOTSA22ANDA27-HOSPITALHILLNORTHAMPTONMASSACHUSETTS1"=20'