Loading...
HERS-512 57 Ford Crossing TBCENERGY STAR Qualified Homes Thermal Bypass Inspection Checklist Crty: \]fyr^<h\M.Q\r.T. Slate: Home Address Thermal Bypass Inspection Guidelines Corrections Needed Builder Verified Rater Verified N/A 1. Overall Air Barrier and Thermal Bamer Alignment Requirements: Insulation shall t>e installed in full contact with sealed interior and exterior air barrier except for alternate to interior air tarrier under item no. 2 ("tVa/Zs Adjoining Exterior Walls or Unconditioned Spaces) All Climate Zones: 1.1 Overall Alignment Throughout Home 1.2 Garage Band Joist Air Barrier (at bays adjoining conditioned space) 13 Attic Eave Baffles Where Vents/Leakage Exist • • D • P • • • Or>ly at Climate Zones 4 and Higher: 14 Slal>eclge Insulation (A maximum of 25% of the slab edge may be uninsulated in Climate Zones^^ana a.p'-^ Best Practices Encourag^, Not Req'd.: > 2 1.5 Air Barrier At All Band Joists (Cllfriate Zones 4 and higher) 1.6 Minimize Thermal Bridging (e.g., OVE framing, SIPs, ICFs) • • • • • • • 2. Walls Adjoining Exterior Walls or Unconditioned Spaces Requirements: • Fully insulated wall aligned with air barrier at both interior and exterior, OR • Alternate for Climate Zones 1 thru 3, sealed exterior air isarrler aligned with RESNET Grade 1 insulation fully suppprted . Continuous top and bottom plates or sealed blocking / 2 1 Wall Behind Shower/Tub 2 2 Wall Behind Fireplace 2.3 Insulated Attic SlopesWalls 2.4 Attic Knee Walls 2.5 Skylight Shaft Walls 2.6 Wall Adjoining Porch Roof 2.7 Staircase Walls 2.8 Double Walls • • • • • • • • • • • • • • Floors tjetween Conditioned and Exterior Spaces Requirements: • Air barrier is installed at any exposed fibrous insulation edges • Insulation is Installed to maintain permanent contact wth sub-floor at)ove Including necessary supports (e.g., staves for blankets, netting for blown-in) • Blanket insulation is verified to have no gaps, voids or compression. » Blown-in insulation is verified to have proper density with firm packing 3.1 Insulated Floor Atx>ve Garage 3.2 Cantilevered Floor • • • • • 4, Shafts Requirements: Openings to unconditioned space are fully sealed with solid tdocking or flashing and any remaining gaps are sealed with caulk or foam (provide fire-rated collars and caulking where required) 4.1 Duct Shaft 4.2 Piping Shaft/Penetrations 4.3 Flue Shaft • • • • • • 5. AfticZ Ceiling Interface Requirements: • All attic penetrations and dropped ceilings include a full interior air barrier aligned with insulation with any gaps fully sealed with caulk, foam or tape 5.1 Attic Access Panel (fully gasketed and insulated) • • • 5.2 Attic Drop-down Stair (fully gasketed and insulated) • • • 5.3 Dropped Ceiling/Soffit (full air fciarrier aligned with insulation) • • • 5.4 Recessed Lighting Fixtures (ICAT labeled and sealed to dryvrall) • • • 5 5 Whole-house Fan (insulated cover gasketed to the opening) • • • 6. Common Walls Betv«en Dwelling Units Requirements: Gap between drywall shaft WBII (i.e., common wall) and the structural framing t)etween units is fully sealed at all exterior boundary conditions 6,1 Common Wall Between Dwelling Units • • Inspection Date; '{imily-f {^j^Builder Inspection Date: j^ZjirtBuilder Com^ny Name: ' i'C^i- • Home Energy Rating Provider; Home Energy Rater Company Name Home Energy Rater Signature: Rater Ins Builder Employee Signature;.