Loading...
3006-2Client: The Community Builders, Inc. Project: Village at Hospital Hill, Phase II, Northampton, MA Contractor The Community Builders, Inc. Producer: Construction Service Location of Concrete Placement: Floor Building A4 CONCRETE FIELD REPORT NO. 2565 DATE: 7/3/2008 The Community Builders, Inc.Reported to: Mr. Tom Kegelman Attention: ALLIED TESTING LABORATORIES, INC. 115 St. George Road Springfield, Massachusetts 01 104 Phone (413) 736-1846 Fax (413) 736-1838 Weather: Clear No. Yds.: 66 Temp.: 70's REINFORCING INSPECTION Reinforcing incorporated in today's concrete placement was found to be satisfactory for size, quantity, cleanliness, properly supported, adequately tied and spaced as required. DATE CAST: 7/3/2008 CYLINDER FABRICATION - ASTM C31 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 7:30 288 4000 5'' Slab/Floor Building A4 SLUMP TESTS - ASTM C143 Time Truck Slump AIR CONTENT TESTS - ASTM C173 or C231 Time Truck No.Air Content (%) 7:30 288 5''7:30 288 5.3% AMBIENT TEMPERATURE Time Temperature CONCRETE TEMPERATURE - ASTM C1064 Time Truck No Temperature 7:30 70°F 7:30 288 78°F MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S Client: The Community Builders, Inc. Project: Village at Hospital Hill, Phase II, Northampton, MA Contractor The Community Builders, Inc. Producer: Construction Service Location of Concrete Placement: Floor Building A4 CONCRETE FIELD REPORT NO. 2565 DATE: 7/3/2008 Respectfully submitted, By: Richard Bellucci President ALLIED TESTING LABORATORIES, INC. Copy Scott Drumm, The Community Builders Tom Welch, Williams Construction Company William Barry, P.E., Barry Engineers & Constructors, Inc. Marc Servick, AIA, Leed AP, Dietz & Company Architects, Inc. Stephen Fist, The Community Builders, Inc. MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S