2665Client: The Community Builders, Inc.
Project: Village at Hospital Hill, Phase II, Northampton, MA
Contractor The Community Builders, Inc.
Producer: Construction Service
Location of Concrete Placement: Building "C" Slab on Grade
CONCRETE FIELD REPORT NO. 2665 DATE: 7/22/2008
The Community Builders, Inc.Reported to:
Mr. Tom Kegelman Attention:
ALLIED TESTING LABORATORIES, INC.
115 St. George Road Springfield, Massachusetts 01 104
Phone (413) 736-1846 Fax (413) 736-1838
Weather: Rainy
No. Yds.: 30
Temp.: 70's
REINFORCING INSPECTION
Reinforcing incorporated in today's concrete placement was found to be satisfactory for size, quantity,
cleanliness, properly supported, adequately tied and spaced as required.
DATE CAST: 7/22/2008
CYLINDER FABRICATION - ASTM C31
IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION
A,B,C,D 8:45 288 4000 4.5'' Building "C" Slab on Grade
SLUMP TESTS - ASTM C143
Time Truck Slump
AIR CONTENT TESTS - ASTM C173 or C231
Time Truck No.Air Content (%)
8:45 288 4.5''8:45 288 5.5%
AMBIENT TEMPERATURE
Time Temperature
CONCRETE TEMPERATURE - ASTM C1064
Time Truck No Temperature
8:45 73°F 8:45 288 78°F
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S
Client: The Community Builders, Inc.
Project: Village at Hospital Hill, Phase II, Northampton, MA
Contractor The Community Builders, Inc.
Producer: Construction Service
Location of Concrete Placement: Building "C" Slab on Grade
CONCRETE FIELD REPORT NO. 2665 DATE: 7/22/2008
Respectfully submitted,
By: Richard Bellucci
President
ALLIED TESTING LABORATORIES, INC.
Copy
Scott Drumm, The Community Builders
Tom Welch, Williams Construction Company
William Barry, P.E., Barry Engineers & Constructors, Inc.
Marc Servick, AIA, Leed AP, Dietz & Company Architects, Inc.
Stephen Fish, The Community Builders, Inc.
Kevin Letendre
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S