Report 14 Community Village
Report No. 14 of Soils Tests Date: 06/26/2008
Client: The Community Builders, Inc.
Project: Village At Hospital Hill, Phase II, Northampton, MA
Subject: Soils Tests
Reported to: The Community Builders, Inc. – Attention: Mr. Tom Kegelman
TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD – ASTM D2922
Test Dry Moisture Maximum
No. Location Density Content Density Compaction
(pcf) (%) (pcf) (%)
Building A2 – N1
Retest From 6/18/2008 125.0 6.4 131.0 95.4
Building A2 – N2
Retest From 6/18/2008 126.1 6.0 131.0 96.3
Building A2 – N3
Retest From 6/18/2008 125.4 5.9 131.0 95.7
Building A2 – S4
Retest From 6/18/2008 128.1 7.1 131.0 97.8
5 Building A1 128.2 6.9 131.0 97.9
6 Building A1 128.8 6.2 131.0 98.3
Building A3 – Below
Plumbing 122.3 8.8 131.0 101.3
Building A3 – Below
Plumbing 120.9 9.9 131.0 99.9
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
Copy:
S. Fish, Community Builders
S. Drumm, Community Builders
T. Welch, Williams Construction
W. Barry, Barry Engineers
M. Sternick, Dietz & Co.
M. Talbot, O’Reilly, Talbot & Okun
I. Hasbrouck, Northampton Building Department
P. Labadorf, Labadorf Assoc.