Loading...
88 Village Hill Arch-struc 2017.12.08LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC T1.1 TITLE SHEET T1.1 Title Sheet, Code Analysis, General Notes SITE C1.0 Existing Conditions Plan C2.0 Site Layout Plan C3.0 Site Grading Plan C4.0 Site Drainage & Utilities Plan C5.0 Construction Details C6.0 Construction Details C7.0 Erosion Sediment & Control Plan C8.0 Erosion Sediment & Control Plan L1 Planting Plan L2 Photometrics Plan STRUCTURAL N-S1.1 Foundation Plan, Sections, Details N-S2.1 First Flr. Framing Plan & Sections N-S3.1 Second Flr. Framing Plan & Sections N-S4.1 Third Flr. Framing Plan & Sections N-S5.1 Roof Framing Plan & Sections N-S6.1 Typical Details & General Notes ARCHITECTURAL D1.0 Basement Demolition Plan D1.1 Basement RCP Demolition Plan D1.2 First Floor Demolition Plan D1.3 First Floor RCP Demolition Plan D1.4 Attic Level Demolition Plan D1.5 Attic Level RCP Demolition Plan A1.0 Basement Proposed Plan A1.1 Basement Proposed RCP A1.2 First Floor Proposed Plan A1.3 First Floor Proposed RCP A1.4 Attic Level Proposed Plan A1.5 Attic Level Proposed RCP A1.6 Loft Level Proposed Plan A1.7 Loft Level Proposed RCP A2.1 Exterior Elevations, West A2.1 Exterior Elevations, South A2.1 Exterior Elevations, East A2.1 Exterior Elevations, North A3.1 Building Sections, Wall Sections, Details A3.2 Building Sections, Wall Sections, Details A3.3 Window, Storefront, Door Elevations & Details A3.4 Wall Sections & Details A4.1 Interior Elevations, Basement A4.2 Interior Elevations, First Floor A4.3 Interior Elevations, Attic + Loft FIRE PROTECTION FP1.0 F. P. Legend & Details PLUMBING P1.0 Plumbing Legend & Details MECHANICAL P1.0 Plumbing Legend & Details List of Drawings Building Code Summary BUILDING CODE: The Massachusetts Building Code, 780 CMR, Ninth Edition (IBC 2015) PROJECT DESCRIPTION: Fit-out of all floor levels (basement, first floor and attic) for new tenants in current existing empty building shell. New mechanical systems, plumbing systems, fire protection systems (sprinkler) at all levels. New exterior windows in new and existing exterior wall openings, new skylights in existing roof. Structural updates to existing masonry shell, existing heavy timber roof truss/ purlins and columns, and existing wood floor joists. USE GROUP: Mixed use group. Basement S-1, self-storage facility. First floor B Business, post-secondary educational facility. Attic + attic loft R-3 residential, two apartment units. OCCUPANCY: Basement S-1 Storage max. 10. TWO MEANS OF EGRESS. First Floor B Business max. 30. TWO MEANS OF EGRESS. Attic R-3 Residential max. 10. ONE MEAN OF EGRESS (per IBC 2015 Section 1006.3.2.3 Single Exit). RATED ASSEMBLIES: 1 hour rated separation at floor/ceiling between B use group at first floor and R-3 use group at attic. CONSTRUCTION TYPE: Type III-B Combustible / Non-combustible, unprotected FIRE PROTECTION: New fire protection, fully sprinklered. IEBC LEVEL: Section 405 "Alteration - Level 3" ALLOWABLE HEIGHT: Mixed Use Group S-1 + B + R-3: 3 Stories above grade (2 + 1 story incr.)/ 75 ft. (55' + 20' incr.) ALLOWABLE AREA: The proposed mixed use S-1 + B + R-3 building is allowed a 200% increase in allowable area due to the presence of an automatic sprinkler system throughout. The buiding is also allowed an increase in allowable area due to frontage in accordance with Section 506.1 & 506.2; however the building area is within allowable limited due to the 200% increase alone. Mixed Use Group S-1 + B + R-3: Single Floor 17,500sf + 35,000sf = 52,500 SF ACTUAL AREA: BASEMENT: 5110 SF 1st FLOOR: 5110 SF ATTIC INCL. LOFT: 5110 SF + 835 SF = 5945 SF in. insul. inch insulation jointjnt Typical Abbreviations Drawing Number DesignationA1-1 1 Wall Section Designation Elevation Designation Wall Elevation Designation4 Building Section Designation 3 1 2A1.1 Partition Designation1 Column Line Designation Door Designation Window Designation Hardwood Masonry Compacted Structural Fill Subgrade Soil Rigid Insulation Concrete w. w/ wide with vinyl comp. tile vertical verify in field VCT Vert. VIF Thresh. Typ. threshold typical sheet similar sht. sim. R.D. reinf. req'd. rm. roof drain reinforced required room quantityqty. prefab P-lam. Plywd. PT ptd prefabricated plastic laminate plywood pressure treated painted on center outside diameter O.C. O.D. No. nom. number nominal maximum medium density overlay manufacturer minimum mounted metal max. MDO Mfr. min. mtd. mtl. h. hdwd. H.M. Hr. high hardwood hollow metal hour galvanized general contractor gypsum board gypsum wall board galv. G.C. gyp. bd gwb. each electric equal ea. elec. eq. d. dia. D.S. deep diameter downspout ceramic control joint center line concrete compressible continous cer C.J. C.L. conc. comp. cont. bd bet. BF. bit bldg. btm. board between barrier free bituminous building bottom at adjustable above finish floor aluminum @ adj. AFF alum Typical Drawing Symbols Plywood 1. Contractors shall verify all dimensions and take own measurements at the job site before commencing any work. Advise architect of any errors or discrepancies. 2. Work shall be performed in accordance with all applicable federal, state and local codes. 3. Contractors shall coordinate all work with other trades and installation of all equipment items or assemblies prior to commencing work. Notify architect of any errors, disprepencies or conflicts prior to continuing. 4. Do not scale drawings if dimensions are in question. The contractor shall be responsible for obtaining clarification from architect before continuing with construction. 5. All contractors are to use complete sets of construction documents for bidding coordination and construction. Subcontractors are not to assume that complete scope of work is illustrated in individual trade drawings under any circumstances. 6. Contractor shall consult and obtain permission from utility owners prior to commencement of work and cooperate with owner and utility company in keeping respective services and facilities in operation. Repair damaged utilities to satisfaction of utilities, secure approval of connections to existing utilities from appropriate utility company and local authorities prior to covering. 7. Under no circumstance shall any trench required for utility connections, etc. be without protective barricades nor be left open at the end of a day's work. 8. No open excavation shall be left open at the end of a day's work without adequate protective barricades to assure public safety. 9. Install / maintain adequate bracing /shoring required to prevent filling in or cave-ins of adjacent materials at all times. 10. Remove all water and disturbed soil from excavations prior to commencing further work each day. 11. Contractors shall not damage site beyond project limit lines. Any damage beyond project lines shall be repaired immediately to owner's satisfaction. 12. Contractor shall maintain structural integrity of project during construction through bracing, guy wires, etc. See structural notes. Typical General Notes 1 F.E. ff. fire extinguisher finish face SOURCE: ARROW STREET/ BOSTON MA "VILLAGE HILL MASTER PLAN", AUGUST 2016. Exst. retaining wall 8'-5"9'-10"8'-9"11'-9"5'-2"1'-2"3'-10"8'-10"6'-3"16'-0"2'-5"9'-10"8'-3" LEGEND: T-9 Round Timber, 9" diam. T-12 Round Timber, 12" diam. S-4 Steel Post, 4" diam. T-6-6 Rect. Timber, 6" x 6" T-6-8 Rect. Timber, 6" x 8" T-6-10 Rect. Timber, 6" x 10" T-4-8 Rect. Timber, 4" x 8" T-8-8 Rect. Timber, 8" x 8" T-8-10 Rect. Timber, 8" x 10" T-4-8 T-4-8 T-8-8 T-8-8 T-8-8 T-8-8 T-8-8 T-8-10 T-8-8 T-8-8T-8-8T-8-8 T-8-8 T-8-8 T-8-8T-8-8T-8-8 T-8-8T-8-8T-8-8T-8-8 T-6-6 T-6-6 S-4 S-4 T-9T-9T-9T-9 T-9 T-9 T-9 T-9 T-4-8 T-9 T-12 T-12 T-12 T-6-8T-6-8 exst steam exst electric panel exst water T-8-8 T-9 T-12 T-9 5'-8"3'-10"2'-8"2'-2"9'-0"3'-0" T-12, missing 10"Exst. sanitary T-12 T-12 T-91'-3"ELEV. +20" RAISED CONCRETE FLOOR BRICK PARTIAL HT WALL AT EAST & SOUTH ELEV. +3" RAISED CONCRETE FLOOR T-9 T-9 19'-7"3'-6"8'-3"8'-7"8'-7"11'-2"10'-5"18'-0"17'-6"19'-1 1/2" (field19'-0")18'-11" (field 18'-9")BRICK, VIF.FIELD STONE, VIF.2'-9"14 1/2"2'-0"2'-0" 4'-2"10'-0" 85'-0" 10'-4"13'-4"12'-10"13'-6"12'-4"9'-10"10'-4"18'-8"20'-8"5"5"6'-6"4'-4 1/2"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"3'-0 1/2"19'-8 1/2"12'-11 1/2"3'-1"9'-0"10'-0"9'-0"3'-1"2'-8"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"60'-1 1/2"7'-6 1/2"2'-9 1/2"3'-0 1/2"19'-8 1/2"57'-7 1/2"11'-0"12'-9"LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC D1.0 GENERAL NOTES: DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES 1 PREP FOR NEW CONCRETE FOOTER FOR NEW STEEL COLUMN. SEE STRUCTURAL. REMOVE EXT. PLYWOOD PROTECTION, EXISTING SASH & FRAME DOWN TO MASONRY OPENING. REMOVE EXISTING BARN DOOR & HARDWARE, DOWN TO MASONRY OPENING. REMOVE EXISTING OVERHEAD DOOR & HARDWARE, DOWN TO MASONRY OPENING. REMOVE RAISED CONCRETE FLOOR & PLUMBING PIPING/ FIXTURES; PREP TO POUR NEW FLOOR FLUSH WITH ADJACENT EXISTING. REMOVE BRICK PARTIAL HEIGHT WALL AND MASONRY RAISED FLOOR AT FORMER GARAGE. PREP TO POUR NEW FLOOR FLUSH WITH ADJACENT EXISTING. EXISTING COLUMN TO BE REMOVED (VERIFY WITH RYAN HELLWIG). BASEMENT EXISTING/ DEMO Scale:1 EXISTING/ DEMOLITION FLOOR PLAN, BASEMENT 1/4" = 1'-0" 1 1 1 1 1 1 11111 1 1 111111 2 222 2 2 3 4 3 3 4 5 5 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 1 1 1 1 1 W8 W812x12 under 10x1210x12 hung10x12 hung10x1210x1210x1210x1210x1210x122X4 + 3x123x12, 17" o.c. typ. 3x12, 17" o.c. typ. 3x12, 17" o.c. typ. 3x12, 17" o.c. typ.2'-6"9'-0"8x8 8x86x10 10x6 10x128x88x88x86x1010x12 6x10 MB 3x12, 17" o.c. typ. 3x12, 17" o.c. typ. 3x12, 17" o.c. typ.8x83x12, 17" o.c. typ.3x12, 17" o.c. typ.3x12, 17" o.c. typ.3x12, 17" o.c. typ.6x10 4'-2"10'-0" 85'-0" 10'-4"13'-4"12'-10"13'-6"12'-4"9'-10"10'-4"18'-8"20'-8"5"5"6'-6"4'-4 1/2"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"3'-0 1/2"19'-8 1/2"12'-11 1/2"3'-1"9'-0"10'-0"9'-0"3'-1"2'-8"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"60'-1 1/2"7'-6 1/2"2'-9 1/2"3'-0 1/2"19'-8 1/2"57'-7 1/2"11'-0"12'-9"19'-7"3'-6"8'-3"8'-7"8'-7"11'-2"10'-5"18'-0"17'-6"19'-1 1/2" (field19'-0")18'-11" (field 18'-9")BRICK, VIF.FIELD STONE, VIF. LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC RCP, BASEMENT EXISTING / DEMO Scale:2 EXISTING/ DEMOLITION RCP, BASEMENT 1/4" = 1'-0" D1.1 GENERAL NOTES: KEYED NOTES 1 REMOVE EXISTING TIN CEILING (HATCHED AREA). PROPOSED NEW STEEL COLUMN IN HATCHED AREA, TYP. SEE STRUCTURAL. EXISTING BEAM AND WOOD COLUMN TO BE REMOVED (VERIFY RH). EXISTING INTERIOR PARTITIONS UP TO CEILING STRUCTURE TO BE REMOVED. 2 1 1 2 DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. 3 33 3 3 3 3 3 3 3 3 3?? 2 4 4 4 4 4 4 4 4 4 43 2222 2 2 2 2 2 2 222222 222222 3'-2" M.O. centered on masonry recess 85'-0" 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0"10'-4"18'-8"20'-8"7"7"11'-0"14'-5"3'-1"8'-10"3'-1"1'-0"12'-11 1/2"3'-1"12'-4"3'-1"12'-7"3'-1"14'-5"20'-10"3'-1"8'-10"60'-1 1/2"13'-0"3'-1"1'-0"57'-7 1/2"3'-1"3'-1"3'-1"9'-0"3'-1"15'-6" 6'-0"3'-2"3'-0"3'-2"3'-0"4'-9"4'-0"3'-2"8'-0"10'-0"15'-9"3'-2"3'-10"3'-2"6'-1"10'-7 1/2"3'-2"8'-0"2'-5"1'-8"8'-7"1'-8"2'-5"8'-0"3'-2"10'-5"82'-10" 3'-3"1'-6" 3'-1"6'-10"6'-6"LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC D1.2 GENERAL NOTES: DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES 1 LOCATION OF NEW STRUCTURAL COLUMN, TYP. (SEE STRUCTURAL). REMOVE FINISH & SUB-FLOOR MINIMAL AMOUNT NEEDED TO PREPARE FOR COLUMN TO PASS THROUGH FIRST FLOOR DOWN TO FOOTER AT BASEMENT LEVEL. REMOVE EXISTING WOOD COLUMN, NOM. 6X6. PROVIDE TEMPORARY SHORING UNTIL NEW BEAMS & COLUMNS ARE IN PLACE (SEE STRUCTURAL). REMOVE EXISTING STAIR TO ATTIC LEVEL. REMOVE EXISTING SASH & EXTERIOR PLYWOOD. EXISTING WOOD FRAME TO REMAIN. REMOVE EXISTING 2X4 EXTERIOR PARTITION WITH TEMP. DOORS. REMOVE BARN DOOR HEADER AND TRACK, DOWN TO MASONRY & WOOD LINTEL OPENING. REMOVE EXISTING 2X4 EXTERIOR PARTITION WITH TEMP. DOOR, DOWN TO MASONRY OPENING. EXISTING WOOD LINTEL TO REMAIN. REMOVE INTERIOR PARTITION, INCL. DOORS & WINDOWS. REMOVE 3'-3" X 7'-0" SECTION OF EXISTING MASONRY WALL IN PREPRATION FOR NEW EXTERIOR DOOR OPENING. REMOVE 3'-2" X 6'-6" SECTION OF EXISTING MASONRY WALL IN PREPRATION FOR NEW EXTERIOR WINDOW OPENING. BOTTOM & TOP OF OPENING TO MATCH EXISTING ADJACENT WINDOW OPENINGS. REMOVE ADDITIONAL PORTION OF MASONRY WALL ABOVE AND BELOW WINDOW OPENING TO INSTALL LINTEL AND SILL MATCHING EXISTING ADJACENT; PROVIDE TEMP. SHORING.FIRST FLOOR PLAN EXISTING/ DEMO 1 Scale:1 EXISTING/ DEMO FIRST FLOOR PLAN 1/4" = 1'-0" 2 3 2 3 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 8 4 4 4 4 4 4 11 1 1 1 1 1 111 1 1 1 11 1 1 1 111 1 5 6 5 6 7 7 7 7 7 8 9 1 3 9 9 3'-2" M.O. centered on masonry recess 85'-0" 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0"10'-4"18'-8"20'-8"7"7"11'-0"14'-5"3'-1"8'-10"3'-1"1'-0"12'-11 1/2"3'-1"12'-4"3'-1"12'-7"3'-1"14'-5"20'-10"3'-1"8'-10"60'-1 1/2"13'-0"3'-1"1'-0"57'-7 1/2"3'-1"3'-1"3'-1"9'-0"3'-1"15'-6" 6'-0"3'-2"3'-0"3'-2"3'-0"4'-9"4'-0"3'-2"8'-0"10'-0"15'-9"3'-2"3'-10"3'-2"6'-1"10'-7 1/2"3'-2"8'-0"2'-5"1'-8"8'-7"1'-8"2'-5"8'-0"3'-2"10'-5"82'-10" 3'-3"1'-6" 3'-1"6'-10"6'-6"LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC D1.3 GENERAL NOTES: KEYED NOTES 1 KEYED NOTES 1 Scale:1 PROPOSED FIRST FLOOR RCP 1/4" = 1'-0" FIRST FLOOR RCP EXISTING/ DEMO DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. LOCATION OF NEW STRUCTURAL COLUMN, TYP. (SEE STRUCTURAL). PREP FOR INSTALLATION OF NEW COLUMN. REMOVE EXISTING WOOD COLUMN, NOM. 6X6. PROVIDE TEMPORARY SHORING. REMOVE EXISTING STAIR TO ATTIC LEVEL. PREP TO IN-FILL FRAMED OPENING IN ATTIC FLOOR. REMOVE TRIM AT BOTH SIDES & BOTTOM OF EXISTING BOTTOM TRUSS CHORDS, TYP. LEDGER BOARDS SUPPORTING EXISTING FLOOR JOISTS TO REMAIN. REMOVE EXISTING 2X4 EXTERIOR PARTITION WITH TEMP. DOORS. REMOVE BARN DOOR HEADER AND TRACK, DOWN TO MASONRY OPENING. REMOVE EXISTING 2X4 EXTERIOR PARTITION WITH TEMP. DOOR, DOWN TO MASONRY OPENING. EXISTING WOOD LINTEL TO REMAIN. REMOVE EXISTING SASH & EXTERIOR PLYWOOD. EXISTING WOOD FRAME TO REMAIN. REMOVE INTERIOR PARTITION, INCL. DOORS & WINDOWS. REMOVE 3'-3" X 7'-0" SECTION OF EXISTING MASONRY WALL IN PREPRATION FOR NEW EXTERIOR DOOR OPENING. REMOVE 3'-2" X 6'-6" SECTION OF EXISTING MASONRY WALL IN PREPRATION FOR NEW EXTERIOR WINDOW OPENING. BOTTOM & TOP OF OPENING TO MATCH EXISTING ADJACENT WINDOW OPENINGS. REMOVE ADDITIONAL PORTION OF MASONRY WALL ABOVE AND BELOW WINDOW OPENING TO INSTALL LINTEL AND SILL MATCHING EXISTING ADJACENT; PROVIDE TEMP. SHORING. 2 3 3 2 111 1 1 1 1 1 111 1 1 1 111 1 1 1 111 1 2 2 2 2 2 2 4 444444 5 6 5 6 7 7 7 7 7 7 7 7 7 7 7 7 9 7 7 7 7 7 7 3 8 8 8 8 9 10 10 10 TOP OF TRUSS TO REMAINREMOVE 16'-7"REMOVE 14'-4 1/2"10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2" JLS, KC GENERAL NOTES: DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. KEYED NOTES 1 REMOVE EXISTING DIAGONAL CHORD FROM EXISTING TRUSS, AS LOCATION INDICATED. REMOVE EXISTING PIPE SUPPORT AT EXISTING TRUSS. REMOVE EXISTING STAIR, STAIR WALLS, HARDWARE & DOOR. REMOVE EXISTING STAIR, AND STAIR 2x WOOD HANDRAIL/ GUARDRAIL. REMOVE FLOORING & FRAMING IN INDICATED AREA FOR NEW STAIR OPENING. REMOVE EXISTING DORMER WINDOW, TRIM, PLYWOOD SHEATHING AND FRAMING AS NECESSARY TO INSTALL NEW WINDOWS ROUGH FRAMING, SHEATHING & TRIM AT EXISTING DORMER FACE & SIDES. CUT TOP CHORD OF TRUSS BACK TO DIMENSION INDICATED. 2 3 4 5 6 7 AS NOTED JLS, KC D1.4 GENERAL NOTES: KEYED NOTESKEYED NOTES Scale:1 EXISTING/ DEMO ATTIC PLAN 1/4" = 1'-0" ATTIC PLAN EXISTING/ DEMO DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. 1 1 1 1 1 11111 1 1 2 2 2 2 2 22222 2 2 2 2 2 22222 3 5 6 6 6 6 7 7 4 LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2" ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC D1.5 GENERAL NOTES: DEMO EXISTING PARTITIONS, WINDOWS, EQUIPMENT ETC. INDICATED BY DASHED LINES. REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO REMOVE PORTION OF ROOF / FRAMING INDICATED. KEYED NOTES 1 REMOVE EXISTING ASPHALT ROOF SYSTEM & ROOF FRAMING IN AREA INDICATED FOR NEW SKYLIGHTS. SAVE ASPHALT SHINGLES FOR RE-INSTALLATION. REMOVE PORTION OF TRUSS BELOW ALONG LINE #4 AS INDICATED. SEE ATTIC DEMO PLAN. LOFT FLOOR PLAN EXISTING/ DEMO Scale:1 EXISTING/ DEMO LOFT FLOOR PLAN 1/4" = 1'-0" 1 11 1 1 1 1 1 2 2 2 18'-0"8'-3"8'-7"8'-7"11'-2"10'-5"18'-0"17'-6"20'-8 1/2" (field19'-0")18'-11" (field 18'-9")BRICK, VIF.FIELD STONE, VIF. BRICK, VIF.FIELD STONE, VIF. Janitor's Closet Gas, WaterElectric sanitary 6'-0"6'-0"6'-0"9'-6" 4'-2"10'-0" 85'-0" 10'-4"13'-4"12'-10"13'-6"12'-4"9'-10"10'-4"18'-8"20'-8"5"5"6'-6"4'-4 1/2"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"3'-0 1/2"19'-8 1/2"12'-11 1/2"3'-1"9'-0"10'-0"9'-0"3'-1"2'-8"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"60'-1 1/2"7'-6 1/2"2'-9 1/2"3'-0 1/2"19'-8 1/2"57'-7 1/2"11'-0"12'-9" Vestibule B01 Lobby B02 B01 B02 B02A STOR. 150SFSTOR. 100SF STOR. 50SF STOR. 50SF STOR. 50SF STOR. 200SF STOR. 200SF STOR. 200SF STOR. 150SF STOR. 150SF STOR. 150SF STOR. 150SF STOR. 150SF STOR. 150SF STOR. 100SF STOR. 100SF STOR. 100SFSTOR. 100SF STOR. 150SF STOR. 200SF STOR. 150SF STOR. 100SF LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A1.0 GENERAL NOTES: REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. TYP. PARTITION #1: (DETAIL: BOARD & BATTEN OVER MTL. STUDS UP TO 7'-0", WITH CHAIN LINK IN-FILL PANEL BETWEEN TO OF PARTITION AND CEILNG). KEYED NOTES 1 NEW STEEL COLUMN, TYP. SEE STRUCTURAL. NEW COLUMN TO REPLACE EXISTING BASEMENT COLUMNS (SEE STRUCTURAL). NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOW. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW INSULATED ALUMINUM-GLASS OVERHEAD DOOR, TRACK, HARDWARE. OVERHEAD DOOR COMPANY ALUMINUM GLASS MODEL #511. NEW JANITOR'S MOP SINK, AND ASSOCIATED WATER SUPPLY/ DRAIN. NEW AIR IN-TAKE AND RETURN FOR ERV UNITS, NOM. 16"H X 24"W LOUVERS. SEE HVAC. NEW EFCO 5600 THERMALLY BROKEN STOREFRONT, WITH STANDARD 1 3/4" D500 WIDE STILE ALUMINUM-GLASS DOORS. SEE DOOR/ FRAME SCHEDULE. NEW POURED CONCRETE SLAB IN HATCHED AREA, MATCH ELEVATION OF ADJACENT EXISTING CONCRETE FLOOR. NEW POURED CONCRETE SILL AT STOREFRONT DOOR/WINDOW OPENING, EXPANSION JOINT WITH NEW FLOOR SLAB AND NEW EXTERIOR WALKWAY. BASEMENT PROPOSED PLAN Scale:1 PROPOSED FLOOR PLAN, BASEMENT 1/4" = 1'-0" 2 3 1 2 2 22 1 11111 1 1 1 1 111111 4 5 444 3 3 5 6 6 7 7 7 8 8 8 9 10 9 9 10 1 1 1 1 1 1 1 1 MB Location of first floor ERV unit at ceiling above janitor's closet 4'-2"10'-0" 85'-0" 10'-4"13'-4"12'-10"13'-6"12'-4"9'-10"10'-4"18'-8"20'-8"5"5"6'-6"4'-4 1/2"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"3'-0 1/2"19'-8 1/2"12'-11 1/2"3'-1"9'-0"10'-0"9'-0"3'-1"2'-8"6'-8 1/2"3'-0 1/2"9'-11 1/2"3'-0 1/2"39'-6"60'-1 1/2"7'-6 1/2"2'-9 1/2"3'-0 1/2"19'-8 1/2"57'-7 1/2"11'-0"12'-9"19'-7"8'-3"8'-7"8'-7"11'-2"10'-5"18'-0"17'-6"19'-1 1/2" (field19'-0")18'-11" (field 18'-9")MB MB MB MB MB MB MB MB MB MB MB BRICK, VIF.FIELD STONE, VIF. LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC BASEMENT PROPOSED RCP Scale:2 PROPOSED RCP, BASEMENT 1/4" = 1'-0" A1.1 GENERAL NOTES: REMOVE ALL EXISTING UN-USED PLUMBING & GAS PIPING, AT ALL WALLS & CEILINGS. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES 1 NEW STEEL COLUMN SPANNING UNDER SIDE OF ATTIC TRUSSES TO NEW BASEMENT FOOTERS, TYP. SEE STRUCTURAL. NEW STEEL BEAM, TYP. SEE STRUCTURAL (VERIFY WITH RH). NEW STEEL COLUMNS UNDER NEW STEEL BEAMS (replacement to existing columns). 2 1 1 1 1 1 1 1 1 1111 1 1 1 1 1 1 111111 2 2 2 2 2 2 2 2 22 3 3 3 3 3 Bookcase 4'-0" Printing, Production, File Storage New window New door 6'-0" New window 4'-8" UP9'-8"7'-10"7'-0"12'-6"5'-6"10'-0" DW 2'-0"2'-6"6'-6"7'-8 1/2"9'-8" 5'-0 1/2" 4'-11 1/2"9'-3"4'-6 1/2"4'-1" 6'-0"6'-0" 6'-0" 85'-0" 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0"10'-4"18'-8"20'-8"7"7"11'-0"14'-5"3'-1"8'-10"3'-1"1'-0"12'-11 1/2"3'-1"12'-4"3'-1"12'-7"3'-1"14'-5"20'-10"3'-1"8'-10"60'-1 1/2"13'-0"3'-1"1'-0"57'-7 1/2"3'-1"3'-1"3'-1"9'-0"3'-1"15'-6" 6'-0"3'-2"3'-0"3'-2"3'-0"4'-9"4'-0"3'-2"8'-0"10'-0"15'-9"3'-2"3'-10"3'-2"6'-1"10'-7 1/2"3'-2"8'-0"2'-5"1'-8"8'-7"1'-8"2'-5"8'-0"3'-2"10'-5"82'-10" 3'-3"1'-6" 3'-1"6'-10"6'-6"5'-2" 114 103103A Classroom Library 101 Studio 102 Vestibule 103 Admin. 104 Lobby 105 Hall 106 Toilet 107 Toilet 108 Admin. 109 Admin. 110 Files Conference 111 Admin. 112 Stor. 116 Hall 117 Faculty 118 Lounge 120 Vestibule 114 Trash/Recycling 115 115B 115A Conference 121 120 ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 1/2" 1 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. 1A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING PARTITION GWB 1A 4" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 2 PARTITION GWB 2A 2A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 6 1/2" 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 3 PARTITION GWB 3A 3A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 6" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 PARTITION GWB 4A 4A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 7 1/2" PARTITION GWB 5 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 4 1/2" PARTITION GWB 6 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A1.2 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES 1 NEW 3'-0" X 7'-0" WOOD INTERIOR SWINGING DOOR. NEW 3'-0" X 7'-0" WOOD INTERIOR POCKET DOOR. INTERIOR METAL STOREFRONT (EFCO #xx), ALUMINUM & GLASS DOORS. FIRST FLOOR PROPOSED PLAN Scale:1 PROPOSED FIRST FLOOR PLAN 1/4" = 1'-0" 2 3 INTERIOR PARTITION TYPES: New window New door New window UP 85'-0" 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0"10'-4"18'-8"20'-8"7"7"11'-0"14'-5"3'-1"8'-10"3'-1"1'-0"12'-11 1/2"3'-1"12'-4"3'-1"12'-7"3'-1"14'-5"20'-10"3'-1"8'-10"60'-1 1/2"13'-0"3'-1"1'-0"57'-7 1/2"3'-1"3'-1"3'-1"9'-0"3'-1"15'-6" 6'-0"3'-2"3'-0"3'-2"3'-0"4'-9"4'-0"3'-2"8'-0"10'-0"15'-9"3'-2"3'-10"3'-2"6'-1"10'-7 1/2"3'-2"8'-0"2'-5"1'-8"8'-7"1'-8"2'-5"8'-0"3'-2"10'-5"82'-10" 3'-3"1'-6" 3'-1"6'-10"6'-6"10'-0" 8'-0" 8'-0" 8'-0" 7'-0" 10'-0"8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 9'-0" 9'-0" 9'-0" 9'-0" 9'-0" 8'-0" 8'-0" 9'-6" 9'-6" 8'-9 3/8" A.F.F., BOTTOM OF BEAM, TYP. 8'-0" 8'-0" 8'-0" Classroom Library 101 Studio 102 Vestibule 103 Admin. 104 Lobby 105 Hall 106 Toilet 108 Admin. 109 Admin. 110 Files Conference 111 Admin. 112 Stor. 116 Hall 117 Faculty 118 Lounge 120 Vestibule 114 Trash/Recycling 115 115B 115A Conference 121 10'-0" EXISTING TRUSS MEMBER OR NEW COLUMN NEW HARDWOOD 1X TONGUE & GROOVE FLOORING NEW 1X PLYWOOD SUB-FLOOR ACOUSTIBLOK IIC49-STC55-Blok16 ACOUSTIC MEMBRANE EXISTING WOOD SUB-FLOOR PLANKS, SANDED FLAT. EXISTING BOTTOM CHORD OF WOOD TRUSS (5X TRUE 2" X 1134"), WITH 2 X4 WOOD LEDGERS EACH SIDE EXISTING WOOD FLOOR JOISTS (TRUE 2" X 934"), 16" O.C., NOTCHED OVER LEDGER BOARDS 58" TYPE X GYP. BOARD. 2X WOOD BLOCKING BETWEEN TRUSS BOTTOM CHORD & STEEL PLATE 38" X 17" CONTINUOUS STEEL TOP PLATE OVER W12X40 STEEL BEAM, ITUMESCENT PAINT. SEE STRUCTURAL. W8X40 STEEL COLUMN, PAINTED. SEE STRUCTURAL.+/- 2 5/8"9 3/4"2 5/8"1'-0"ELEV. 10' - 0" ABOVE 1ST FLR.1'-0"ELEV. +/-11' - 0" ABOVE 1ST FLR. ELEV. 8' - 9 3/8" ABOVE 1ST FLR.1 1/4"1'-6 1/4" LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC FIRST FLOOR PROPOSED RCP A1.3 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL BEAMS & COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES 1 1 2 KEYED NOTES NEW W8X40 STEEL COLUMN, TYP. OF 24. SEE STRUCTURAL. TYP. COL. LINES 1-6: NEW W12X40 STEEL BEAM + 3 8"x17" TOP PLATE, COAT WITH ITUMESCENT PAINT. SEE STRUCTURAL. SEE DETAIL 2/A1.3. Scale:1 PROPOSED FIRST FLOOR RCP 1/4" = 1'-0" 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22222 Scale:2 RATED CLNG/FLR. 1" = 1'-0" 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2" 1/A4.2 1-OPP./A4.2 2/A4.2 3/A4.2CLOSET LOBBY MASTER BEDRM MASTER BEDRM FOYERFOYER 2'-5 1/2"2'-5 1/2" KITCHEN 1 LAUNDRY LIVING 15'-7 1/2"2'-8"2'-8"1'-6"3'-8 1/2"2'-6"1'-6"4'-9 1/2"2'-8"2'-8"w/dMEDIA DESK OFFICE VENT FREE GAS FIREPLACEHALF BATH CLOSET - BATH NEW POST bench w/d HALF BATH BATH CLOSET - bench VENT FREE GAS FIREPLACEKITCHEN DINING MEDIA OFFICE 2'-0 1/2" 2'-0 1/2" SIDEBOARD DINING CLOSET -CLOSET - LIVING LAUNDRY2'-6"2'-0"2'-1"2'-1"7"7"CLOSET -7'-9"5'-7 1/2"6" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 PARTITION GWB 4A 4A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 6 1/2" 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 3 PARTITION GWB 3A 3A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 4" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 2 PARTITION GWB 2A 2A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 1/2" 1 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. 1A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING PARTITION GWB 1A 7 1/2" PARTITION GWB 5 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 4 1/2" PARTITION GWB 6 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A1.4 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTES ATTIC FLOOR PROPOSED PLAN Scale:1 PROPOSED ATTIC FLOOR PLAN 1/4" = 1'-0" 1 X 1 1 1 1 1 1 1 1 1 1 2 2 2 2 4 4 4 4 4444 1 NEW 3'-0" X 7'-0" WOOD INTERIOR SWINGING DOOR. NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW ENGINEERED POST WITH RECLAIMED WOOD CLADDING OR 8X8 / 10X10 HEAVY TIMBER POST SALVAGED FROM EXISTING TRUSSES. NEW POST, SEE STRUCTURAL. 2 2 2 2 2 3 3 3 3 3 1 1 1 4 4 4 4 4 4 4 4 4 5 5 5 5 5 INTERIOR PARTITION TYPES: 1 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2"9'-7"7"7"7'-9"wood framed openingwood framed openingCLOSET LOBBY MASTER BEDRM MASTER BEDRM FOYERFOYER KITCHEN LAUNDRY LIVING MEDIA OFFICE HALF BATH CLOSET - BATH HALF BATH BATH CLOSET - KITCHEN DINING MEDIA OFFICE DINING CLOSET -CLOSET - LIVING LAUNDRY CLOSET - +8'-6"+8'-6"+8'-6" +8'-6"+8'-6"+8'-6"+8'-6"+8'-6"CLOSET -woodopeningLLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC ATTIC FLOOR PROPOSED RCP A1.5 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. G.C. TO DESIGN AND INSTALL TEMPORARY SHORING AS REQUIRED TO INSTALL COLUMNS INDICATED. SEE STRUCTURAL. KEYED NOTESKEYED NOTES Scale:1 PROPOSED ATTIC FLOOR RCP 1/4" = 1'-0" 1 NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW ENGINEERED POST WITH RECLAIMED WOOD CLADDING OR 8X8 / 10X10 HEAVY TIMBER POST SALVAGED FROM EXISTING TRUSSES. NEW POST, SEE STRUCTURAL. EDGE OF BALCONY ABOVE. 2 5 5 1 1 2 1 12 1 1 2 1 12 3 3 3 3 3333 3 3 3 3 3 3 3 3 4 4 4 4 3 4 5 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2" 3'-4 1/2" 3'-4 1/2" +8'-6" ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF GWB CEILING BELOW GWB CEILING BELOW CLOSET BEDRM BATH BEDRM BATH CLOSET STAIR DOWN STAIR DOWN GWB CEILING BELOW ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 1/2" 1 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. 1A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING PARTITION GWB 1A 4" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 2 PARTITION GWB 2A 2A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 6 1/2" 1 LAYER 1/2" GWB EACH SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 3 PARTITION GWB 3A 3A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING 6" 1 LAYER 1/2" GWB ONE SIDE 2X4 WOOD STUD, 1'-4" O.C. TYP. ROXUL AFB ACOUSTICAL FIRE BATTS, ALL INTERIOR PARTITIONS 4 PARTITION GWB 4A 4A: ACOUSTIBLOK IIC49-STC55-Blok16 FLR TO CLNG, TIE TO ACOUSTIC MEMBRANE AT ATTIC FLOOR/ 1ST FLOOR CEILING LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A1.6 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. KEYED NOTES 1 NEW 4'-0" X 7'-0" DOUBLE WOOD INTERIOR SWINGING DOORS. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. WOOD CAPPED BALCONY OVERLOOKIING LIVING ROOM AREA BELOW. SKYLIGHT: VELUX FS M06 NOM. 30" X 45" (DOUBLE GANGED). NEW 3'-0" X 7'-0" SINGLE WOOD INTERIOR SWINGING DOOR. LOFT PROPOSED PLAN Scale:1 PROPOSED LOFT PLAN 1/4" = 1'-0" 2 3 1 5 5 1 1 2 2 33 4 44 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 44 5 INTERIOR PARTITION TYPES: 10'-6"13'-4"12'-10"13'-6"12'-4"10'-0" 82'-10"60'-1 1/2"17'-8"64'-5 1/2"10'-4"9'-7"9'-6"57'-11 1/2"20'-0 1/2"20'-3"89'-4" 39'-4 1/2"17'-7 1/2"28'-0 1/2" CLOSET LOFT BEDRM BATH LOFT BEDRM BATH CLOSET LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC LOFT PROPOSED RCP A1.7 GENERAL NOTES: PROTECT ALL EXISTING SURFACES TO REMAIN FROM DAMAGE FROM CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL SEAL ALL CONSTRUCTION AREAS AS NECESSARY TO PREVENT THE TRANSMISSION OF MATERIALS GENERATED BY CONSTRUCTION ACTIVITIES TO ADJACENT SPACES. KEYED NOTES 1 KEYED NOTES NEW W8X40 STEEL COLUMN, TYP. OF 24. SEE STRUCTURAL. TYP. COL. LINES 1-6: NEW W8X40 STEEL BEAM, COAT WITH ITUMESCENT PAINT, TYP. SEE STRUCTURAL. BEAM BELOW NEW BEARING PLATE & EXISTING BOTTOM TRUSS CHORD - PLATE, CHORD AND FLOOR STRUCTURE ABOVE 1 HR GYP. BD/ WOOD DECK RATED ENCLOSURE. Scale:1 PROPOSED LOFT RCP 1/4" = 1'-0" 2 11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR 9'-10"BASEMENT 11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR 9'-11"BASEMENT 20'-0"8'-0"COL. ACOL. BCOL. CCOL. DCOL. E3 AX.X LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC WEST EXT. ELEVATIONS A2.1 Scale:2 PROPOSED WEST EXT. ELEVATION 1/4" = 1'-0" Scale:1 EXISTING WEST EXT. ELEVATION 1/4" = 1'-0" GENERAL NOTES: EXTERIOR BRICK TO REMAIN; REPLACE MISSING BRICKS, RE-POINT AS NEEDED. EXISTING ASPHALT ROOF ASSEMBLY TO REMAIN. KEYED DEMOLITION NOTES NOTE HATCH INDICATES AREA OF MATERIALS TO BE REMOVED. 1 REMOVE EXISTING WINDOW SASH, AND PROTECTIVE PLYWOOD AT OPENING. RETAIN EXST. MASONRY OPENING + EXST. WOOD WINDOW FRAME/TRIM/ BLIND STOP. REMOVE EXISTING PANELED GARAGE DOOR, TRACK AND HARDWARE. RETAIN EXST. MASONRY OPENING, GRANITE SILL, & SOFFIT AT +/-8'-10". REMOVE EXISTING CARRIAGE DOORS, INTERIOR TRIM, AND PROTECTIVE PLYWOOD AT OPENING. RETAIN EXST. MASONRY OPENING. REMOVE MASONRY AT SILL TO FLUSH WITH LEVEL OF EXISTING CONCRETE BASEMENT FLOOR, PREP FOR NEW CONCRETE SILL . REMOVE EXISTING EXTERIOR CLADDING, TRIM, WINDOW & GABLE VENT AT VERTICAL FACES (BELOW EAVE) OF EXISTING DORMER, FRONT AND TWO TRIANGULAR SIDES. REMOVE ASPHALT ROOF ASSEMBLY AND ROOF RAFTERS IN AREA OF NEW SKYLIGHT OPENINGS. REMOVE ADDITIONAL ASPHALT FINISH ROOFING AT +/-18 IN. PERIMETER SURROUNDING SKYLIGHT OPENING TO ALLOW FOR INTEGRATION OF RE-INSTALLED ROOF ASSEMBLY WITH NEW SKYLIGHT FLASHINGS. 2 3 4 1 3 1 1 1 1 444 2 4 4 4 KEYED CONSTRUCTION NOTES 10 NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW VELUX SKYLIGHTS.SEE WINDOW/ FRAME SCHEDULE. NEW FRAMED OPENING IN EXST. WOOD ROOF FRAMING. NEW FLASHING & RE-INSTALL ASPHALT ROOF MATERIALS. NEW INSULATED ALUMINUM-GLASS OVERHEAD DOOR, TRACK, HARDWARE. OVERHEAD DOOR COMPANY ALUMINUM GLASS MODEL #511. 11 12 10 10 15 15 15 15 15 11 12 13 14 14 13 13 13 13 3 5 5 5 15 NEW MARVIN INTEGRITY ULTREX-WOOD INSERT DOUBLE HUNG WINDOWS (USE EXISTING WOOD WINDOW FRAME/TRIM/ BLIND STOP - REPAIR OR PROVIDE NEW TO MATCH EXST PROFILES AS NEEDED). NEW ALUMINUM GABLE LOUVER, 8:12 PITCH, 60" BASE. NON-FUNCTIONAL. NEW EFCO 5600 THERMALLY BROKEN STOREFRONT, WITH STANDARD 1 3/4" D500 WIDE STILE ALUMINUM-GLASS DOORS. SEE DOOR/ FRAME SCHEDULE. NEW 6" CONCRETE SILL AT NEW STOREFRONT OPENING. REPAIR/ TOOTH IN NEW MASONRY TO MATCH EXISTING AT JAMB EXTENSIONS. NEW CONCRETE WALKWAYS, CONCRETE PAD FOR HVAC EQUIPMENT, AND EQUIPMENT ENCLOSURE. SEE SITE DRAWINGS. 17 16 17 18 18 19 19191919 16 19 1 11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR 9'-10"BASEMENT 8'-7 1/2"LOFT 9'-11"BASEMENT11'-0"SECOND FLR FIRST FLR Tenant Signage Located Here Tenant Signage Located Here 1 AX.X 2 AX.X COL. 1COL. 2COL. 3COL. 4COL. 5COL. 62, O.H. AX.X LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC SOUTH EXT. ELEVATIONS A2.2 Scale:2 PROPOSED SOUTH EXT. ELEVATION 1/4" = 1'-0" Scale:1 EXISTING SOUTH EXT. ELEVATION 1/4" = 1'-0" GENERAL NOTES: EXTERIOR BRICK TO REMAIN; REPLACE MISSING BRICKS, RE-POINT AS NEEDED. EXISTING ASPHALT ROOF ASSEMBLY TO REMAIN. 1 REMOVE EXISTING WINDOW SASH, AND PROTECTIVE PLYWOOD AT OPENING. RETAIN EXST. MASONRY OPENING + EXST. WOOD WINDOW FRAME/TRIM/ BLIND STOP. REMOVE EXISTING EXTERIOR CLADDING, TRIM, WINDOW & GABLE VENT AT VERTICAL FACES (BELOW EAVE) OF EXISTING DORMER, FRONT AND TWO TRIANGULAR SIDES. REMOVE EXISTING STUD WALL IN-FILL, TRIM & DOOR AT EXISTING MASONRY OPENING. DEMO EXISTING MASONRY EXTERIOR WALL IN HATCHED AREA FOR NEW DOOR OR WINDOW OPENING. REMOVE EXISTING PROTECTIVE PLYWOOD, CARRIAGE DOORS, DOOR HARDWARE, TRIM DOWN TO EXISTING MASONRY OPENING. REMOVE ASPHALT ROOF ASSEMBLY AND ROOF RAFTERS IN AREA OF NEW SKYLIGHT OPENINGS. REMOVE ADDITIONAL ASPHALT FINISH ROOFING AT +/-18 IN. PERIMETER SURROUNDING SKYLIGHT OPENING TO ALLOW FOR INTEGRATION OF RE-INSTALLED ROOF ASSEMBLY WITH NEW SKYLIGHT FLASHINGS. 2 10 1011 12 13 13 13 13 13 13 13 13 2 2 2 2 2 2 14 14 14 14 14 3 3 16 4 4 1 1 1 1 1 16 2 KEYED CONSTRUCTION NOTES 10 NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW VELUX SKYLIGHTS.SEE WINDOW/ FRAME SCHEDULE. NEW WOOD FRAMED OPENING IN EXST. ROOF FRAMING. NEW FLASHING & RE-INSTALL ASPHALT ROOF MATERIALS. NEW MARVIN INTEGRITY ULTREX-WOOD INSERT DOUBLE HUNG WINDOWS (USE EXISTING WOOD FRAME/ BLIND STOP/ TRIM). NEW ALUMINUM GABLE LOUVER, 8:12 PITCH, 60" BASE. NON-FUNCTIONAL. NEW EFCO 5600 THERMALLY BROKEN STOREFRONT, WITH STANDARD 1 3/4" D500 WIDE STILE ALUMINUM-GLASS DOORS. SEE DOOR/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOW IN NEW MASONRY OPENING. SEE WINDOW/ FRAME SCHEDULE. PROVIDE NEW CAST CONCRETE SILL TO MATCHING EXISTING SILLS. PROVIDE NEW WOOD WINDOW FRAME/ BLIND STOP/ TRIM TO MATCHING EXISTING. NEW CONCRETE WALKWAY, SEE SITE DRAWINGS. 11 12 13 14 15 16 17 17 17 15 4 5 5 18 18 6 66 16 KEYED DEMOLITION NOTES NOTE HATCH INDICATES AREA OF MATERIALS TO BE REMOVED. 1 11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR Tenant Signage Located HereCOL. ACOL. BCOL. CCOL. DCOL. E3 AX.X11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC EAST EXT. ELEVATIONS A2.3Scale:2 PROPOSED EAST EXT. ELEVATION 1/4" = 1'-0" Scale:1 EXISTING EAST EXT. ELEVATION 1/4" = 1'-0" GENERAL NOTES: EXTERIOR BRICK TO REMAIN; REPLACE MISSING BRICKS, RE-POINT AS NEEDED. EXISTING ASPHALT ROOF ASSEMBLY TO REMAIN. 13 13 13 13 12 1110 10 14 14 14 14 2 2 2 2 2 2 1 1 1 1 3 16 KEYED DEMOLITION NOTES NOTE HATCH INDICATES AREA OF MATERIALS TO BE REMOVED. 1 REMOVE EXISTING WINDOW SASH, AND PROTECTIVE PLYWOOD AT OPENING. RETAIN EXST. MASONRY OPENING + EXST. WOOD WINDOW FRAME/TRIM/ BLIND STOP. REMOVE EXISTING EXTERIOR CLADDING, TRIM, WINDOW & GABLE VENT AT VERTICAL FACES (BELOW EAVE) OF EXISTING DORMER, FRONT AND TWO TRIANGULAR SIDES. REMOVE EXISTING STUD WALL IN-FILL & DOUBLE DOORS AT EXISTING MASONRY OPENING. REMOVE EXISTING BARN DOOR TRACK / HARDWARE/ HEADER. REMOVE ASPHALT ROOF ASSEMBLY AND ROOF RAFTERS IN AREA OF NEW SKYLIGHT OPENINGS. REMOVE ADDITIONAL ASPHALT FINISH ROOFING AT +/-18 IN. PERIMETER SURROUNDING SKYLIGHT OPENING TO ALLOW FOR INTEGRATION OF RE-INSTALLED ROOF ASSEMBLY WITH NEW SKYLIGHT FLASHINGS. 2 3 4 KEYED CONSTRUCTION NOTES 10 NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW VELUX SKYLIGHTS.SEE WINDOW/ FRAME SCHEDULE. NEW WOOD FRAMED OPENING IN EXST. ROOF FRAMING. NEW FLASHING & RE-INSTALL ASPHALT ROOF MATERIALS. NEW MARVIN INTEGRITY ULTREX-WOOD INSERT DOUBLE HUNG WINDOWS (USE EXISTING WOOD WINDOW FRAME/TRIM/ BLIND STOP). NEW ALUMINUM GABLE LOUVER, 8:12 PITCH, 60" BASE. NON-FUNCTIONAL. NEW EFCO 5600 THERMALLY BROKEN STOREFRONT, WITH STANDARD 1 3/4" D500 WIDE STILE ALUMINUM-GLASS DOORS. SEE DOOR/ FRAME SCHEDULE. 11 12 13 14 4 4 3 3 15 16 15 2 1 11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR 9'-11"BASEMENT 2'-2 1/2"3'-9"COL. 1COL. 2COL. 3COL. 4COL. 5COL. 6align align 2 AX.X 1 AX.X 2 AX.X11'-0"8'-7 1/2"LOFT SECOND FLR FIRST FLR 9'-11"BASEMENT 2'-2 1/2"3'-9" align align LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC NORTH EXT. ELEVATIONS A2.4Scale:2 PROPOSED NORTH EXT. ELEVATION 1/4" = 1'-0" Scale:1 EXISTING NORTH EXT. ELEVATION 1/4" = 1'-0" 1 REMOVE EXISTING WINDOW SASH, AND PROTECTIVE PLYWOOD AT OPENING. RETAIN EXST. MASONRY OPENING + EXST. WOOD WINDOW FRAME/TRIM/ BLIND STOP. REMOVE EXISTING EXTERIOR CLADDING, TRIM, WINDOW & GABLE VENT AT VERTICAL FACES (BELOW EAVE) OF EXISTING DORMER, FRONT AND TWO TRIANGULAR SIDES. REMOVE ASPHALT ROOF ASSEMBLY AND ROOF RAFTERS IN AREA OF NEW SKYLIGHT OPENINGS. REMOVE ADDITIONAL ASPHALT FINISH ROOFING IN +/-18 IN. PERIMETER SURROUNDING SKYLIGHT OPENING TO ALLOW FOR INTEGRATION/ RE-INSTALL WITH NEW SKYLIGHT FLASHINGS. REMOVE EXISTING MASONRY, CREATE RECTANGULAR OPENING THROUGH EXTERIOR WALL FOR NEW NOM. 16"H X 24"W HVAC LOUVER (IN-TAKE & RETURN FOR FIRST FLR ERV UNIT). SEE HVAC. DEMO EXISTING MASONRY EXTERIOR WALL IN HATCHED AREA FOR WINDOW OPENING (incl new lintel & sill). 2 KEYED CONSTRUCTION NOTES 10 NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOWS. SEE WINDOW/ FRAME SCHEDULE. NEW VELUX SKYLIGHTS.SEE WINDOW/ FRAME SCHEDULE. NEW FRAMED OPENING IN EXST. WOOD ROOF FRAMING. NEW FLASHING & RE-INSTALL ASPHALT ROOF MATERIALS. NEW MARVIN INTEGRITY ULTREX-WOOD INSERT DOUBLE HUNG OR FIXED WINDOWS (USE EXISTING WOOD FRAME/ BLIND STOP/ TRIM). NEW ALUMINUM GABLE LOUVER, 8:12 PITCH, 60" BASE. FRESH AIR IN-TAKE FOR ATTIC LEVEL ERV'S. SEE HVAC. NEW HVAC IN-TAKE / RETURN LOUVERS, NOM. 16"H X 24"W, SEE HVAC. 11 12 2 2 2 1 1 1 1 1 1 1 1 2 2 2 10 10 11 12 13 13 13 13 13 13 13 13 14 14 14 14 14 1414 14 3 33 13 14 15 15 4 4 4 161616 2 5 5 14 GENERAL NOTES: EXTERIOR BRICK TO REMAIN; REPLACE MISSING BRICKS, RE-POINT AS NEEDED. EXISTING ASPHALT ROOF ASSEMBLY TO REMAIN. KEYED DEMOLITION NOTES NOTE HATCH INDICATES AREA OF MATERIALS TO BE REMOVED. 1 NEW ALUMINUMLOUVER, 8:12 PITCH WITH 60" BASE. NON-FUNCTIONAL AT EAST & WEST DORMERS. FUNCTIONAL AT NORTH & SOUTH DORMERS. SEE HVAC. NEW MARVIN INTEGRITY ULTREX-WOOD FIXED WINDOW, ITDHP30-40. NEW BORAL TRU-EXTERIOR POLY-ASH CHANNEL SIDING, SMOOTH, CRAFTSMAN COLLECTION. NEW BORAL TRU-EXTERIOR POLY-ASH TRIM, SMOOTH, nom. 1x6. EXISTING ROOF ASSEMBLY AND DORMER GABLE FASCIA TO REMAIN (RE-PAINT FASCIA & TRIM).8'-7 1/4"LOFT SECOND FLR DETAIL X/A3.2 DETAIL X/A3.2 BORAL TRIM, 5/4x6 (1" X 5 1/2"). NEW WOLF HOME PRODUCTS POLY-ASH MOULDING (PRE-FAB USING BORAL TRIM), #TE-75 BED MOULDING (916" X 1 916"). NEW MARVIN INTEGRITY ULTREX-WOOD CASEMENT WINDOW, ICAP29-78. NEW MARVIN INTEGRITY ULTREX-WOOD DOUBLE HUNG WINDOW, ITDH44-82. BORAL TRIM, 1X4 (3/4" X 3 1/2 "), THREE SIDES. BORAL TRIM, SMOOTH, 5/4x6 (1" X 5 1/2"). BORAL TRIM, SMOOTH, 5/4x6 (1" X 5 1/2"). elev. +28", window ref. elev. +8'-10 5/8", window ref. 13'-0" 19'-0 1/2"5'-5"5'-10"Scale:2 WINDOW TYPES 1/4" = 1'-0" OPERABLE DOUBLE HUNG MARVIN INTEGRITY ULTREX- WOOD WINDOW W. INSECT SCREEN A 6'-1 1/2"6'-1 1/2"3'-4 1/2"4'-10"VARIESVARIES 6'-3"2'-10 1/2"VARIES2'-10 1/2"NEW WOOD FRAME(MATCH EXST. PROFILES) TO RECEIVE NEW MARVIN INSERT WINDOW 4'-10"3'-2"D1 MARVIN ITIDH33.5-75 R.O. 34.5"w X 75.5"h M.O. 37"w X 78"h D2 MARVIN ITIDH34.5-75R.O. 35.5"w X 75.5"hM.O. 38"w X 78"h D3MARVIN ITIDH25.5-65 R.O. 26.5"w X 65.5"h M.O. 29"w X 68"h D4 MARVIN ITIDH33.5-73 R.O. 34.5"w X 73.5"h M.O. 37"w X 76"h D5 MARVIN ITIDH33.5-65 R.O. 34.5"w X 65.5"h M.O. 37"w X 68"h F1 MARVIN ITIDHP33-30 R.O. 34"w X 30.5"h M.O. 36.5"w X 33"h F2 MARVIN ITIDHP33-35 R.O. 34"w X 35.5"h M.O. 36.5"w X 38"h F3 MARVIN ITIDHP33-46 R.O. 34"w X 46.5"h M.O. 36.5"w X 48"h 2'-6 9/16"3'-10 1/4"3'-10 1/4"4 1/4"8" R.O. to R.O.9'-3 1/2" stone sill to timber lintel10'-0" M.O. 9'-11" frame 9'-3" frame6 1/2"2 1/4"2 1/4"2 1/4"3'-4 1/2"3'-0"7'-6"1'-3 1/4" 5'-3 1/4" 2 1/4" 2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"5" 5"5"9'-1 1/2" M.O.9'-10 1/2" M.O.8'-7" M.O.2'-7 1/4"9'-10" frame9'-1" frame3'-4" 8'-6 1/2" frame 2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"2 1/4" 2 1/4" 2 1/4"7'-6"10'-0"9'-0"10'-0"8'-6"2'-7 1/4"3'-4"7'-6"eq.eq.eq.7'-6"eq.eq.eq.1'-5 1/2"4 1/2"2 3/4"2 3/4"3 3/8"eq.eq.eq.eq.eq.eq.eq.9'-11" frame 8'-2" frame3'-4 1/2" 1'-3 1/4" 5'-3 1/4" 2 1/4" 2 1/4"2 1/4" 2 1/4"2 1/4"2 1/4"2 1/4"2 1/4"eq.eq.eq.8'-0"5"5"6 1/2"EXISTING STONE SILL EXISTING STONE SILLEXISTING STONE SILL EXISTING STONE SILL NEW CAST CONCRETE SILL NEW MASONRYEXIST. MASONRY7'-6 1/2" M.O.9'-0"8'-6 1/4" frameEXISTING WOOD LINTEL 8'-6"NEW WOOD TRIM/ HEADER NEW WOOD TRIM/ HEADER 8'-6 3/4"7'-5 1/2" frame 5"5"5"6 1/2"5" 3'-0" 10'-0" M.O. 3'-4 1/2"4'-9"8'-4"5"5"6 1/2"5" 3'-0" EXST. TRIM/ WOOD SOFFIT 8'-2 1/2"8'-8 1/2" bottom of steel lintel8'-8" frame3'-2" frame 2'-9 1/2"2'-9 1/2" 3'-3" M.O.9'-3" M.O.7'-6"5"5"5"6 1/2"114 103 B01 120 B02A B02 1'-8" LOUVER6 5/8"",5 1/2" board cut on diag.3",2 1/2" trimon diag.1'-8 1/2" LOUVER ROUGH OPENING3/8"2 1/2"3 1/2"(Window +12") = WINDOW ROUGH OPENING5 1/2"WINDOWLOFT ELEV. +8'-7 1/4"A.F.F.3 3/8"ELEV. +8'-10 5/8" A.F.F. WINDOW REF. VARIES: 3'-1", 3'-2", 2'-5"VARIES: 6'-6", 5'-3"VARIES: 6'-4", 2'-9", 3'-2", 4'-0"VARIES: 3'-0 1/2", 3'-1" VARIES: 3'-5", 3'-6", 2'-9"VARIES: 6'-6", 5'-3"4 1/2"2 1/2"4 1/2"2 1/2"8"2 1/4"2"6 3/4"2 1/4"TYP. 2 BRICKSTYP. 2 BRICKS2"2"2"3"TYP. EXST. FLAT TOP MASONRY WINDOW OPENING + EXST. WOOD FRAME EXTERIOR TYP. EXST. ARCHED TOP MASONRY WINDOW OPENING + EXST. WOOD FRAME EXTERIOR TYP. EXST. ARCHED TOP MASONRY WINDOW OPENING + EXST. WOOD FRAME INTERIOR 7 1/8"1 1/2"1"LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC DOORS ELEV/ DETAILS EXTERIOR WINDOWS, A3.1 Scale:1 DETAIL ELEVATION OF TYP. DORMER 1/2" = 1'-0" Scale:3 TYP. MASONRY OPENINGS, FRAME ELEV.'S 1/2" = 1'-0" Scale:5 EXTERIOR MASONRY DOOR OPENINGS, STOREFRONT FRAMES & DOORS 1/2" = 1'-0" Scale:6 DORMER WINDOWS & LOUVER 1 1/2" = 1'-0" Scale:4 TYP. INSERT WINDOW DETAIL 1/2" = 1'-0" HEAVY TIMBER LINTEL OVER DOOROPENING TO REMAIN. 1 HOUR RATED FLOOR-CEILING ASSEMBLY ATATTIC FLOOR - BOTTOMCHORD OF TRUSS -FIRST FLOOR CEILING.BASED ON UL ASSEMBLY#L523. STEEL W-SECTION UNDER EXISTINGTRUSS; COAT WITH INTUMESCENTPAINT. 1 HOUR RATED FLOOR-CEILING ASSEMBLY ATATTIC FLOOR - BOTTOMCHORD OF TRUSS -FIRST FLOOR CEILING.BASED ON UL ASSEMBLY#L523. HEAVY TIMBER LINTEL OVER DOOR OPENING TO REMAIN. 1 HOUR RATED FLOOR- CEILING ASSEMBLY AT ATTIC FLOOR - BOTTOM CHORD OF TRUSS - FIRST FLOOR CEILING. BASED ON UL ASSEMBLY #L523. STEEL W-SECTION UNDER EXISTING TRUSS; COAT WITH INTUMESCENT PAINT. 1 HOUR RATED FLOOR- CEILING ASSEMBLY AT ATTIC FLOOR - BOTTOM CHORD OF TRUSS - FIRST FLOOR CEILING. BASED ON UL ASSEMBLY #L523. 1 1 2"varies 2212" - 24"2'-4"1" 7 "3'-8"8'-6"ASPHALT SHEATHING OVER METAL STEP FLASHING VELUX EDL SADDLE FLASHING, BETWEEN LAYERS OF MTL FLASHING VELUX EKL GUTTER BETWEEN VELUX M06 NOM. 30" X 45" SKYLIGHT UNITS 9 1 2"+/- 1 1 1 2" VELUX EDL HEAD FLASHING8'-8"6 5/8"",3",2 1/2" trimLLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A3.2 DETAILS WALL SECTIONS, Scale:X WEST WALL SECT. 1/2" = 1'-0" Scale:X OVERHEAD DOOR SILL 1 1/2" = 1'-0" Scale:X OVERHEAD DOOR HEAD 1 1/2" = 1'-0" Scale:X ATTIC FLR/ 1ST FLR CLNG. 1 1/2" = 1'-0" Scale:X SOUTH WALL SECT. 1/2" = 1'-0"Scale:X EAST WALL SECT. 1/2" = 1'-0" Scale:X NORTH WALL SECT. 1/2" = 1'-0" Scale:X ALUM. DOOR SILL 1/2" = 1'-0" Scale:X ALUM. WINDOW MULLION 1/2" = 1'-0" Scale:X ALUM. DOOR HEAD 1/2" = 1'-0" Scale:X ALUM. WINDOW HEAD 1/2" = 1'-0" Scale:X ALUM. WINDOW HEAD 1/2" = 1'-0" Scale:X TYPICAL SKYLIGHT 1/2" = 1'-0" Scale:X MASRONRY WINDOW HEAD 1/2" = 1'-0" Scale:X MASONRY WINDOW SILL/ INTERMED. MULLION 1/2" = 1'-0" Scale:X EAST-WEST BUILDING SECTION NTS Scale:X EAST-WEST BUILDING SECTION NTS X X X X 102 xxxxxxxxx 2'-6"2'-0"4"22"22" xxx Scale:X STUDIO, NORTH ELEV. 1/4" = 1'-0"Scale:X STUDIO, WEST ELEV. 1/4" = 1'-0" Scale:X STUDIO, SOUTH ELEV. 1/4" = 1'-0" Scale:X ADMIN. AREA, EAST 1/4" = 1'-0"X ADMIN. AREA, NORTH 1/4" = 1'-0"Scale:X LOBBY, EAST ELEV. 1/4" = 1'-0"Scale:X LOBBY, WEST ELEV. 1/4" = 1'-0" Scale:X LOUNGE/ KITCHEN, NORTH 1/4" = 1'-0" Scale:X CONFERENCE, WEST 1/4" = 1'-0"2'-10"4"30"7'-2"8'-6"2"1'-10"2"2'-4"2"2'-4"34"26 1/2" 2'-6"3'-0"7'-0"8'-6"8'-6"9'-4"2"8'-7" 8'-7"8'-6"9'-4"10'-0"8'-6"10'-0"7'-8"8'-0"4'-4" 26 1/2" 4'-4" LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC CSLD INT. ELEVATIONS A4.1 8'-6"7'-8"7'-8"DETAIL X/A3.0 DINING ROOM FAMILY ROOM LOFT 9'-0"8'-6" (top of exst. truss)7'-8"3'-2"6'-8"7'-10"11'-9"8'-6"6'-9"3'-2"3'-2"3'-2"2'-10"6'-0"7'-4 1/2"5'-3"8'-8"8'-0"+/-13'-0"8'-6"5"3'-2"7'-8"3'-0"plywd cross bracing inside wallplywd cross bracing inside wallpost paritally inside wallpost inside wallpost inside wallpost partially inside wall8'-7 1/2"2'-5 12" elev.2'-5 12" elev.post inside wall3'-2"3'-0"3'-2"3'-0"3'-2"3'-0"7'-1 1/2"11'-0"8'-0"LIVING DINING FOYER FOYER DINING LIVING LOFT LOFTBATHROOMCLOSET LOBBY 3"6'-5"LLC Architecture, Planning, Interior Design 413 . 586 . 1600 JUSTER POPE FRAZIER Northampton, Massachusetts 01060 82 North Street REMARKS REVISIONS NO.DATE BY SHEET TITLE DATE SCALE DRAWN BY SHEET NO. CHECKED BY VILLAGE HILL NORTHAMPTON, MA COACH HOUSE Kevin Chrobak PROGRESS DRAWING NOT FOR CONSTRUCTION Civil Engineers 860 . 928 . 7848 Mansfield, CT 06268 33 Wilbur Cross Way Suite 105 Structural Engineer 413 . 774 . 7444 Greenfield, MA 01301 18 Linden Avenue Mechanical Engineers 413 . 268 . 7251 Haydenville, MA 01039 4 South Main Street DECEMBER 8, 2017 AS NOTED JLS, KC A4.2 Scale:1 N-S SECTION/ ELEVATION, thru dormers 1/4" = 1'-0" Scale:2 N-S SECTION/ ELEVATION, through Dining-Family Rm 1/8" = 1'-0" Scale:3 E-W SECTION/ ELEVATION 1/4" = 1'-0" APARTMENTS INT. ELEVATIONS