Loading...
CoachHouse - 2CCFin-8th - RSHPE! RYAN S. HELLWIG, PE ! STRUCTURAL ENGINEER ! Secondary Construction Control Document CONSTRUCTION COMPLETION August 15, 2018 Louis Hasbrouck - Building Commissioner Northampton Building Department Municipal Office Building 212 Main Street Northampton MA 01060 Project Title:Coach House Renovations Project Location:Village Hill Scope of Project:Renovations to Existing Building Architect:Juster Pope Frazier LLC General Contractor:DA Sullivan In accordance with the 8th Edition of the Massachusetts State In accordance Building Code, 780 CMR §107.6, I hereby state that, to the best of my knowledge, the construction of the structural work for the first floor of this project was satisfactorily completed per the design intent as shown on the drawings F1, S1, S2, S5 & S6 that I had prepared for this project. I made periodic visits to the site and was in contact with the Architect and the General Contractor during construction to review the progress of the work. Shop drawings were submitted for review of structural steel. Nothing in this document relieves the General Contractor of its responsibility regarding the provisions of 780 CMR 107. Respectfully Submitted, Ryan S. Hellwig, P.E. Massachusetts Registered Professional Engineer #37300 STRUCTURAL ! 18 LINDEN AVENUE ! GREENFIELD, MA 01301 ! ! VOICE = 413 - 774 - 7444 ! EMAIL = rshpe@crocker.com !